Muscat - Oman
**********.*******@*****.***
JIHAD TARABAY / 1992
SUMMARY Proactive Electrical and Instrumentation Engineer, been involved in the oil and gas industry for five years (Construction and Commissioning).
SKILLS & ABILITIES Construction, Commissioning, Planning and Preparation, Scheduling, Leadership Skills, Manpower Management, Time Management, Attention to Detail, Risk Management, Delegation Skills, Verbal and Written Communication Skills, Effective Technical Skills, Ability to Work Under Pressure, Motivation Skills, Decision Making, Teamwork, Confident, Problem-Solving Skills, Value Engineering, Creativity, Microsoft, AutoCAD. EXPERIENCE ELECTRICAL ENGINEER, CONSOLIDATED CONTRACTORS COMPANY Dec 2015 – Present:
1. Worked for CCC to deliver E&I systems within facilities of below clients: a. British Petroleum Company BP, Dec 2018 – Present (MC: Petrofac). b. Petroleum Development Oman PDO, Nov 2017 – May 2018 (MC: Petrofac). c. British Petroleum Company BP, Dec 2015 – Oct 2017 (MC: Petrofac). 2. Main duties were related to Electrical, Instrumentation and Telecom Subsystems Completion (Construction/Commissioning).
3. Supervised team of electricians, foreman, supervisors and superintendents to successfully deliver the given scope of work on time, within budget and as per project standards, specifications and quality workmanship. 4. Maintained construction schedule, identifying and solving site technical and logistic problems.
5. Prepared material take off lists and requested material to site as per design and specs requirements.
6. Maintained the highest quality standards within administering good construction safety practices by rectifying site hazards immediately.
7. Monitored daily construction details and daily progress. 8. Mainly worked on subsystems related to:
a. Switchgears Installation and Cabling (33KV, 3.3KV, 415V). b. Bus Ducts Installation and Connection (3.3KV, 415V). c. Earthing and Lightening Protection Subsystems Installation. d. Heat Tracing Subsystem Installation and Termination. e. Lighting and Small Power Subsystems Installation, Termination and Commissioning. f. UPS and Batteries Subsystems Installation and Connection. g. HVAC Subsystems Installation and Termination.
h. Motors Installation and Termination.
i. Fire and Gas Subsystems Installation and Termination. j. PAGA and Access Control Subsystems Installation and Termination. k. Camera and CCTV Subsystems Installation and Termination. 9. Took the lead to finalize all site and office work related to E&I department at the end up stage of the project (TQs, FCNs, RLMUs… etc.)
10. Prepared work method statements for specific tasks and related risk assessment docs. Page 2
EDUCATION UNIVERSITY OF BALAMAND – LEBANON – MASTERS IN ELECTRICAL ENGINEERING - 2015 Power Systems, Optimal Control Systems, Power Electronics, Advanced Machines, Power Quality, Optimization, Fuzzy Logic.
GPA 3.32
UNIVERSITY OF BALAMAND – LEBANON – BACHELOR IN ELECTRICAL ENGINEERING - 2014 GPA 3.28
CERTIFICATIONS,
AUTHORITIES AND
COURSES
1. CompEx Certified, Nov 2016, Certificate No: 54925, Installation and Inspection of electrical apparatus in hazardous areas
2. Got authorized as Competent Electrical Person CEP within PDO facilities in Oman, January 2018
3. Got authorized as Permit to Work Applicant PTWA within PDO facilities in Oman, February 2018
4. Attended courses related to risk management, planning and scheduling, orientation and productivity, value engineering, time management, delay analysis methodologies… etc. SPECIAL EFFORT 1. Delivered the given scope of work related to electrical substations to the commissioning stage with being 8% ahead of planned schedule (Teamwork). 2. Took the responsibility to rectify and track the delivery of pipe lines heat tracing subsystems as per project requirements after it had been out of control. This required intensive coordination with other discipline.
PUBLICATIONS IEEE Publication
Paper Title: Nickel Metal Hydride Battery: Structure, chemical reaction and circuit model Conference Subject: Technological Advances in Electrical, Electronics and Computer Engineering (TAEECE), 2015 Third International Conference Conference Date: 29 Apr 2015 to 01 May 2015
ACADEMIC PROJECTS 1. Reactive Power Planning -Grid- (Modelling and Implementation using MATLAB) 2. Solar Energy Prototype (With Sun Light Tracker – Arduino Chip Driven) 3. Wind Energy Prototype
REFERENCES BASHAR ELIAS
Project Director, Consolidated Contractors Company 009**-********
NASER EL HAJ
Construction Manager, Consolidated Contractors Company 009**-********
MOHAMMAD HASSAN
Site Manager, Petrofac