Post Job Free
Sign in

Electrical Engineer

Location:
Kakinada, Andhra Pradesh, India
Salary:
100000
Posted:
July 06, 2020

Contact this candidate

Resume:

CURRICULAM VITAE

M CHAITANYA SRAVANTH

No. +91-702*******/+965-********

E-mail: ********************@*****.***, *-*********-********@******.***

Objective: To work in a challenging and co-operative environment and use my technical and analytical skills with dedication and sincerity for the benefit of company and to achieve new heights in my career.

Academic Profile:

M. Tech in Electrical & Electronics Engg. (Advanced Power Systems) - JNTUK - Scored 71.24% - 2011.

Undergone Training Programs:

Undergone training for PTW system in KOC.

Undergone training to work under H2S by carrying gas detectors and basic Firefighting.

Issued Supervisory (C) 11KV license under Indian Govt. Electrical Licensing Board (No: 3-5916).

Work Profile:

Larsen & Toubro Pvt. Ltd. (Current Employer) - (India-March 2015 to July 2018) (Kuwait Aug 2018 to till date).

Designation : Senior Engineer Electrical

Projects :

1.New 48” Crude Transit Line Project (TL-5)

Value: INR 2000 Cr

Client: Kuwait Oil Company.

2.J3-PCG-SEZ Gasification

Value: INR 1500 Cr

Client: Reliance Industries Limited.

3. J3-C2 Complex ROGC

Value: INR 1200 Cr

Client: Reliance Industries Limited.

4.CBM Project GGS-11,12

Value: INR 450 Cr

Client: Reliance Industries Limited.

5. EOR-5 Mangla Processing Terminal

Value: INR 550 Cr

Client: Cairn India Ltd.

Job Responsibilities:

Plan & Schedule the work of the contractors to ensure all Work is performed within the parameters of the project schedule in accordance to HSE & Quality standards in Specific time and cost

Supervise electrical installations, testing and Pre-commissioning (HV & LV panels, MLDBs, Bus Bars, Switchgear, Cabling, Transformers, Sub-station works, Light fittings of various types)

Distribution of work, to guide and planning of work for Supervisors and workers at site.

Dealing with Techno – Commercial aspect of the project, which involves preparation of billing to Client, follows up for releasing payment.

Providing input to the planners for site conditions, BOQ preparation, quantities measurement etc.

Coordinating with the other functionaries of the project to ensure timely completion of work.

Certification of the work done, and quantities used wherever required for Sub contractors.

Reporting day to day work activities through daily work report from working site to head office.

Supervising all day-to-day electrical activities executed at site as per drawing.

Dealings with client, Contractors & Sub Contractors including reconciliation.

Overall responsibility from workplace until work completes.

Job Description:

KOC TL-5 Project (48” Crude Transit Line from North Kuwait to CMM)

Execution of Cathodic Protection Works for 48” Pipeline.

24 FO cable laying for Pipeline Leak Detection & 48 FO cable blowing for Communication.

Installation of Instrument Stanchions, JB’s, DAS cabinets, CCTV.

Installation of Instrumentation panels as SCADA, DCS, ESD & RTU.

Installation of 630 KVA Transformer, LT panels, DB’s, Cable Trays, Solar panels.

Execution of Earth pit drilling works using Augur Machine.

Verifying the demolition drawings in the site physically and giving the feedback to engineering team for further process.

Identifying the locations physically and reserving the place for the required panels according to the drawings.

Installation of Handhole and Manholes for FOC works.

Laying of FOC HDPE Duct (120mm), Sub-duct (32mm) & Warning tape for Telecom works.

RIL J3 Project-ROGC (Refinery off Gas Cracker),

RIL-PCG-SEZ Gasification,

RIL CBM (Coal Bed Methane) Project.

Supervision of Erection, testing and Pre-Commissioning of 6.6KV and 11KV Substations.

Ladder and Perf. Tray Erection (750mm, 600mm, 450mm, 300mm, 150mm, 100mm & 75mm).

L.T, H.T power, control and FO cable laying and terminations up to 3Cx240 mm2 – 33KV HT cable and 1Cx500 mm2 - 1.1 KV LT.

P.A System JB’s, Dial pad, Speakers, Beacons installation of whole ROGC plant.

Electric Heat Tracing DB’s and JB’s installation, Cable laying, Glanding and Termination

Cathodic Protection System JB’s and tray, Lighting, UPS & Power DB’s Installation.

Clearing all the ITP reports of the equipment’s installed.

Grid Earthing, Lightening Protection and Earthing strip UG and AG Laying.

Cairn India Limited-EOR (Enhanced Oil Recovery Project).

Construction, Testing & Commissioning of E-House includes 6.6KV GIS Schneider HT Panels and LT Panels, 2 MVA Transformers, HT & LT Motors, and PMCC.

Red line Mark-up, As-built Drawings submission & other site activities to satisfy the customer.

Leading & monitoring the performance of team members to ensure efficiency in Project and meeting targets as on time.

Perform Inspection of all project related activities during erection itself to prevent the raise of punch points by monitoring nonconformities

Preparation of Documents regarding permits system, Test reports, ITR’s, CCC, MCC, SAC.

Pre-Commissioning, Testing & Functional Check-ups of Electrical Motors, T/F’s, Bus bars, CB.

Cairn India Limited. (Brunel India Pvt. Ltd., Sach Electromech Pvt. Ltd.) (From March 2014 to February 2015)

Designation : Electrical Pre-Commissioning Engineer

Value : INR 7500 Cr

Job Responsibilities:

Planning and Execution of job according pre-planned maintenance job schedules.

Carrying out RA for all O&M activities to ensure safe and smooth execution for completion of job by following various Safe Working Practices, Procedures like ‘Permit to Work’, ‘Lock Out-Tag Out’ etc.

Read, understand and implement all applicable company policies & SOP ensuring all times that all works associated with the role of Technician is completed safely as per company standard.

Performing Safety Training Observation Program (STOP) regularly.

Handling & Directs work plans during normal, planned and emergency shutdowns activities.

Ensure effective communications are maintained with O&M personnel, service contractors.

Evaluate materials submittals and ensure its compliance with project specifications.

Review and inspect Equipment’s installations to ensure coordination and quality of work.

Review of the Method statements submitted by subcontractors.

Review of the contract drawings and raising RFI's for any deviations or variations from Local authority regulations.

Witnessing all commissioning test requirements assured by verifying records.

Participate and contribute in regular scheduled staff meetings.

Job Description:

Operation and Maintenance of Distribution transformers up to 2/2.3 MVA to 2.5 MVA.

Maintenance of motors, Transformers & feeders.

Maintenance of battery charger and battery banks.

Maintenance of ACB’s up to 415V and 11KV.

Condition monitoring & Maintenance of HT Switch boards like 6.6 KV, 11 KV, 33 KV MAKE ABB. and Switch Boards 415 V like PMCC & MCC - Make: L&T and ABB

Operation and Maintenance of LT and HT motors ratings up to 5350 KW supplied by world class reputed vendor like ABB, Siemens, Bharat Bijlee, and CGL

Maintenance of Frequency based VFD’s make ABB for 30, 50, 75 HP pumps.

Responsible to give training for electricians and contractors for safety job execution.

Ensure effective communications are maintained with O&M personnel, service contractors.

Carry out day to day contract maintenance activities of plant and isolated well-pads Earthing system ground to industry standards.

Carried out day to day maintenance jobs as PM, GM and break down maintenance activities on electrical system jobs as per the work notifications, instructions & maintain record of the same.

Knowledge of Hazardous area identification and electrical equipment maintenance.

JSA (Job Safety Analysis) preparation for critical job execution

Following Permit to Work (PTW) system e.g. cold work, spark potential & hot work permit etc.

Detailed field supervision & trouble shooting of the, work assessments under classification standards and Area zones.

Conduct Root Cause Analysis (RCA) with coordination of multifunctional inputs for failure of equipment and implement effective solutions to prevent recurrence and maintain records.

Pre-Commissioning Of 33KV GIS E-House S/S’s”.

Relays REF 615, REU 615, RET 615, REF 620, SEPAM S20 Relay Testing and Commissioning.

EHT (Electrical Heat Tracing) cum Lighting Panels in the well pads for wells.

33KV GIS RMU Panel Testing and Commissioning for Well Pads.

LBS panel Testing and Commissioning.

ACS800 ABB VFD Panel Testing and Commissioning.

PMCC Panel Extension with Existing PMCC Scheme & Functional checks of GIS and PMCC

Shutdown Experience

Attended Monthly shut down activities in Exploration Hydrocarbon Well pads for LT motors, 2MVA transformers, Air Insulated Switchgear PMCC panels, Lighting and Power DB’s, VSD’s.

Attended Weekdays Shut down activities in Oil and Gas Process Terminal Plant for HT and LT motors, EHT system, 5 MVA and 2 MVA transformers, PMCC panels, Battery Banks.

S V Erector Pvt. Ltd. (From Nov 2010 to Nov 2013).

Designation : Engineer Electrical

Project : DAP Plant.

Value : 350 Crores.

Client : Coromandel International Limited.

Job Responsibilities & Description:

Cable Tray Erection as per drawing elevation.

Power, Control, UG Cabling & Earthing cable Laying up to 3CX300 mm2 and Bus-bar Erection.

Installation of Illumination System in Industries.

Earth Grid & Earth Pit Preparation, Installation of Lightening Conductors, providing appropriate Earthing to Electrical & Electronic Installations as Transformers, HT & LT Motors and Panels

Testing of Transformers, High-pot Test on cables up to 6.6 KV, BDV Test of Transformer Oil, CT & PT Testing, Glanding and Terminations of Cables.

Computer Skills:

Well versed with MS Office.

Personal Profile:

Date of Birth : 14th November, 1986,

Languages Known : Telugu, English, Hindi, Gujarati & Tamil.

Passport Num. : Z4143776

Validity : 19/9/2027



Contact this candidate