Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Dammam, Eastern, Saudi Arabia
Posted:
July 05, 2020

Contact this candidate

Resume:

SYED MUHAMMAD SULTAN JAVED

adecct@r.postjobfree.com

059******* (Mobile)

Professional Objective

A CHALLENGING POSITION AS AN ELECTRICAL ENGINEER where I develop my current skills base and expand my skills into new Technologies.

Educational Background

National University of Computer and emerging SCIENCES NUCES– Pakistan

Bachelor of Electrical Engineering (Telecommunication) 2010

personal Skills

Excellent oral/written communication, interpersonal, analytical, organizational, troubleshooting, problem solving skills.

I have a good ability to handle pressure and perform well under stress.

To have Customer oriented approach as a Team.

Communication, leadership, relationship.

Technical knowledge and skills among the team.

Work under pressure.

Time and resource management.

Meet targets, manage and monitor KPI’s – ensuring optimum performance and achievement of operational objectives.

Summary of Experience

Quality control engineer (ELECTRICAL)

First Fix

July 2019 _ present

(AD DIRAYAH FARM)

Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including closure of Non-Compliance Report.

Reviewing the shop drawings and installation according to it.

Cable pulling of mv cables for infra at south zone.

Reviewing all the material submittals of mv cables 8.7-15 kv, lv cables, wiring devices, EMT conduits, pvc conduiting boxes.

Reviewing prequalification for the project and submitting to the client for approval.

Performing the megger test in witnessing of the consultant.

Installation of earthing and lightning protection system.

Installation of Y/G Cable of different sizes and earthing terminal depending on the design requirement.

Inspection of installation of lv cables for south zone infra.

Inspection of 1st fix 2nd fix,3rd fix of power and lighting of various service and royal buildings of south zone for Al Dirayah Farm.

Inspection of installation of cable trays and cable trucking.

Inspection of 1st fix of fire alarm system for various buildings in south zone.

Inspection of first fix of Structure cable system, access control system.

Inspection of termination of LV panels installed as per the load schedule.

Quality control engineer (ELECTRICAL)

HUTA Hegerfeld

Jan 2016 to – June 2019

Metro tunnel & Mosque station (MAKKAH)

Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including closure of Non-Compliance Report.

Develop method statement for the electrical activities including risk assessment and job safety environmental analysis.

Reviewing supplier`s pre-qualification and submitting and taking approval from consultant.

Reviewing material submittal for Electrical items such as lighting fixture, MV cables, LV cables, boxes, emt and pvc conduits, earthing and lightning protection.

Installation of 1st fix 2nd fix of the lighting fixtures.

Making the inspection test plans along with the checklist for the earthing system.

Supervising the Installation of clamps and earthing terminal at metro tunnel Stretch 3 by sub-contractor.

Preparing single line drawing for the concrete BCS concrete batching plant.

Ensuring proper terminating and routing of the kv HV cable for temporary diversion in coordination with Saudi Electric Company.

Cable pulling of MV cables from the substation to the mosque station.

Installation of panels for logistic purpose for the contractor.

Installation of copper tape and mild steel earthing mesh for mosque station.

Witnessing and coordinating with sub-contractor for electrical resistivity test required for the earthing design.

Coordination with main contractor to ensure completion of work as per approved shop drawings.

Reviewing the design drawings and implementing according to it.

Responsible for the installation of the CCTV systems in accordance with the KEO instructions.

Ensures the quality records, acceptance certificates, electrical completion certificates and the documentation for specific systems and areas are prepared and collated in accordance with project requirements.

Coordinate with the site QC manager for the completion of as-built turnover documentation.

QC ENGINEER (ELECTRICAL & COMMUNICATION)

June 2013 – Dec 2014

KAIA (KINGABDULAZIZ INTERNATIONAL AIRPORT)

HUTA Hegerfeld

Schedule preparation, pre-planning and resource forecasting for subcontractors for electrical activities relating to the project.

Infrastructure & cable containment for ELV systems.

Making inspection of installation of cable trays Ladders and Cable trunks at Passenger Terminal Building Zone F.

Inspection of installation of 1st fix 2nd fix 3rd fix of power and lighting of passenger terminal Zone F.

Installation of main earthing terminal where required.

Installation of LV cables for passenger terminal building zone F.

Installation of copper tape for the earthing mesh.

Responsible for installations such as (Data Network, Fire Alarm, Audio Video system, structural cabling system, Security Systems) at Site.

Installation of lv panels along with termination as per the approved load schedule.

Provide Technical support for the installation of access control systems.

Supervision of the Implementation and installation of the approved shop drawings on site as instructed.

Coordination with main contractor to ensure completion of work as per approved shop drawings.

Making the inspection test plan for grounding systems.

Providing the technical support and problem-solving techniques for site team members.

Review and respond to contractors’ technical queries and coordinate with Engineering Department on technical issues faced by the team.

Provide technical support to the preparation of Field Change Requests and Change Orders.

Familiar with International Codes & Safety Standards.

Drawing review, give input regarding design to engineering group and field technical adjustment experienced.

Ensures the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements.

Coordinate with the site QC manager for the completion of as-built turnover documentation.

Resolve any discrepancies between the completed milestone and quality documentation.

Provide progress information for incorporation into project reports.

Monitor and control the status of punch list and exception lists relevant to quality dossiers.

Attend the weekly QA/QC and commissioning meetings.

Provide progress data to the planning and scheduling department.

Hands on experience in preparing technical specifications, material selection, sizing, and performance evaluation of electrical equipment.

Trainings & Projects

IRCA Lead Auditor ISO 9001: 2015 Quality Management System April 2017

Metro tunnel stretch 3 and stretch 4

Mosque station

King Abdulaziz Airport project

Al Diriyah farm ROSA Palace

personal Details

Father name : Syed Shaukat Jawed (Late)

Date of Birth : 22nd April 1988

Nationality : Pakistani

Marital Status : Married, 3 dependents

Languages : English, Urdu

Holding : Saudi Iqama# 233-***-**** (Transferable)

Relocate : Anywhere in Saudi Arabia

License : Saudi Driving License



Contact this candidate