PRAVEEN KUMAR JANJANAM
Address: Dno:*-***, bhargavapet,
Mangalagiri, Andhra Pradesh
India
Mob: +799*******, +966*********
Email: ***************@*****.***
ELECTRICAL & ENGINEER
Accomplished, proactive engineer with significant experience in high voltage substations and oil and gas petrochemical power projects, pharmaceutical project coordination, equipment installation, testing coordination and Maintenance. Possess extensive educational qualifications with bachelor’s degree in Electrical Engineer. Recognized for strong adherence to safety, ability to work well as team member and leader, and exceptional work ethic. Proven technical, interpersonal communication skills. Excellent client management skills with the innate ability to build strong, lasting, and mutually beneficial relationships. Core competencies and professional strengths include:
Project Execution/Planning/Mgmt. Documentation Report Preparation
Design, testing coordination Safety compliance Resource allocation
Material planning Cost controls Purchasing
Operation management Quality control Manpower supervision
CAREER SUMMARY:
Total 12 + Years’ experience in Project Management Planning, Installations, Testing & Commissioning Co-ordination of combine cycle power plants Substation Power Distribution Systems, Industrial Utilities Equipment’s, Systems up gradation / tie-ins in Oil & Gas field Equipment’s, Building Management services, substations.
Assist E&I manager in Proposal & estimation, project management.
Resource planning and material control of the project.
Providing input to Purchase Department for evaluating subcontractors on monthly basis, based on project progress achievement against planning and ratio of skilled and unskilled manpower.
Prepare procurement strategy, monitoring & expediting engineering, check engineering deliverables, procurement coordination & technical close out with suppliers, vendor expediting for on time delivery.
Having experience in HV and LV Equipment operation & Maintenance activities.
Successful Erection of AIS and GIS 380kv,132kv,33kV,11kV,4.16kv MV Switchgear, LV Switchgear, Control panels, Capacitor banks, NER’s, Power Transformers, Reactors, Batteries, HVAC Units, Fire Pumps, Fire water tanks sump pumps
Oil and Gas, Petro-chemical industries facilities shut down /turn around work installation and testing and commissioning and maintenance and operation works
Saudi electricity company and Saudi Aramco oil and gas utilities projects
Saudi Aramco petrochemical oil and gas separation plants.
PROJECTS SUMMARY:
Sabic ibnzahr petrochemical shut down project feb 2020-mar2020
Saudi Aramco shaybah GOS#4 plant Extension work AUG2017-DEC2019
Saudi Electricity company Riyadh combine power plant PP10 4300MW FEB 2015 -MAY 2017
Saudi Electricity company QURRAYAH COMBINE CYCLE power plant 4600MW 2014FEB-2015FEB
Saudi Aramco utility Juaymah wastewater & caustic system up gradation project JAN2013-JAN2014
Saudi Aramco Utility Juaymah GAS Plant MAY2012-JAN2013
Divis Laboratories ltd Pharmaceutical Company FEB2008-NOV2011
ACADEMIC QUALIFICATION:
Graduate bachelor’s degree in electrical and Electronics Engineering, Adams engineering college, Andhra Pradesh with an Aggregate of 60 % during 2004-2008
Diploma in Electrical and Electronics Engineering, State board of Technical education and training Andhra Pradesh with an Aggregate of 69 % during 2001-2004
Secondary school of education Andhra Pradesh in SSB convent 75.6% during 2000-2001
Designation: E&I ENGINEER
M/s GAS ARABIAN SERVICES LTD Feb-2020-jun2020
Assignment Project: 1) Client: Client: Sabic ibnzahr petrochemical plant shut down work/TA projet MTBE-II(220-H-01)
This project consists of heater RTD and thermocouple maintenance work
Manage and oversee the day to day construction management of the project and report to Project Manager of details, including progress, risks, and opportunities in a timely manner
Coordination with client in appraising the progress & plan and for arranging necessary clearance/permits required from client for completing the planned activity.
control P&ID red-markup calibration loop testing
thermocouple installation and commissioning handed over to client ibnzahr
To lead in executing a strategic plan in line with the project schedule by establishing priorities and determining resource allocation for efficient and effective delivery of the project.
Review of engineering drawings to make sure that all specifications and regulations are being followed.
Monitor construction and commissioning productivity and schedule performance and investigate reasons for less than satisfactory performance. Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions
Supervise & manage project staffing and schedules related to the day-to-day vertical construction aspects of projects. Review progress reports check on any reported difficulties and correct any safety violations or other reported deficiencies.
Define clear roles & responsibilities and deliverable requirements in terms of both scope and schedule to all the construction team members.
Ensure all the work stoppages are recorded and communicated to the client.
Reviewing and approving of sub-contractors Bill and issue measurement certificates as appropriate.
Records changes with respect to the scope of work and ensures that work is being carried out after necessary
Designation: E&I ENGINEER
M/s SEPCO-II SHANDONG ELECTRIC POWER CHINA CONSTRUCTION CO SAUDI ARABIA LLC MAY-2017-DEC 2019
Assignment Project: 1) Client: Saudi Aramco shaybah GOS#4 plant Extension work
This projects consists of Two blocks in (3+3+1)configuration each block has 4 65 MW frame GT GE 7EA,3 OTSG’s/NEM vertical type 1 130 MW Siemens generator STG surface condensers balance of plant includes closed cooling water circulating pumps and motors Demin water treatment and Raw water treatment plant lube oil shelter BSDG diesel Generators erection and testing & commissioning
Project Execution Exposure:
Manage and oversee the day to day construction management of the project and report to Project Manager of details, including progress, risks and opportunities in a timely manner
Coordination with client in appraising the progress & plan and for arranging necessary clearance/permits required from client for completing the planned activity.
Electrical single line, three line drawings and instrumentation & control P&ID red-markup calibration loop testing and motor testing,motor solo run test switch gear testing MCC panels instrumentation TCS-3000 panel HMI start up and SAT test valves, pneumatic control valves,actuators, flow meters, transmitters
Battery systems inverter and rectifier installation and commissioning
Generator winding test and Instrument and motor testing and generator relays testing configuration and PSA & PMS systems generator startup and short-circuit test (stability test) Generator signals testing TCS load rejection and PSS test and final performance test excitation AVR load test
commissioning, transformers generators lube oil skids cooling fans, gas separation skids air compressors.
Oversee selection and coordination of subcontractors working in various phases of the project
To lead in executing a strategic plan in line with the project schedule by establishing priorities and determining resource allocation for efficient and effective delivery of the project.
Review of engineering drawings to make sure that all specifications and regulations are being followed.
Monitor construction and commissioning productivity and schedule performance and investigate reasons for less than satisfactory performance. Provide recommendations and institute measures for improvement by modification to operating procedures/work instructions
Supervise & manage project staffing and schedules related to the day-to-day vertical construction aspects of projects. Review progress reports check on any reported difficulties and correct any safety violations or other reported deficiencies.
Define clear roles & responsibilities and deliverable requirements in terms of both scope and schedule to all the construction team members.
Ensure all the work stoppages are recorded and communicated to the client.
Reviewing and approving of sub-contractors Bill and issue measurement certificates as appropriate.
Interacts with governmental branches and regulatory agencies as required to ensure that projects comply with all applicable legal requirements and regulations. Coordinates with efforts of other internal departments such as Planning, Supply chain management, Engineering and Finance related to the project.
Records changes with respect to the scope of work and ensures that work is being carried out after necessary approvals both from management and client.
Ensures that project is completed within budget and schedule while meeting client needs, business objectives and design guidelines
Ensures the availability of all approved design, material, and manpower availability at site as per requirement.
Ensures the work to be done as per approved drawings.
Control over the construction managers/Engineers and coordination with quality and safety managers for safe and qualitative delivery of project.
Should have rich experience in handling Saudi Aramco projects (HV Substation) and should be well versed in Saudi Aramco standards, specifications, and procedures.
Responsible for safe & healthy working atmosphere at site.
M/s Arabian Bemco contracting co ltd Riyadh, KSA(PPD) MAY2012-2017
Designation: Electrical Engineer
Assignment Project: 4) Saudi electricity company Riyadh power plant PP10 4300MW FEB 2015 – MAY 2017
This projects consists of TEN blocks in (4+4+1) configuration each block has 4 65 MW frame GT GE7EA,4 HRSG’s/NEM vertical type 1 130 MW BRUSH generator D-11 STG surface condensers balance of plant includes closed cooling water circulating pumps and motors Demin water treatment and Raw water treatment plant lube oil shelter BSDG diesel Generators erection and testing & commissioning
Project Execution Exposure:
Power cable single line diagram cable routing layout motor data sheets cable boxes cable calculation cable schedule main control panels and local control panel & starter panel VFD panels Emergency push button wiring diagrams electrical grounding layout interconnection loop diagram electrical cable tray layout BOM
Electrical single line, three line drawings and instrumentation & control P&ID red-markup calibration loop testing and motor testing,motor solo run test switch gear testing MCC panels instrumentation DCS Markvi panel HMI start up and SAT test valves, pneumatic control valves,actuators, flow meters, transmitters
Battery systems inverter and rectifier installation and commissioning
Generator winding test and Instrument and motor testing and generator relays testing configuration and markvi dcs systems generator startup and short-circuit test (stability test) Generator signals testing TCS load rejection and PSS test and final performance test excitation AVR load test
Prepare test plan supervise and coordinate commissioning activities for power transformers voltage regulators CB’s, PTs, CT’s, HV switches and station service equipment and AC/DC system such as ups chargers’ batteries and transfer switches
Perform primary and secondary testing of instruments transformers (current and voltage transformers) polarity and ratio and burden check
Oversee relays settings and coordination testing protection relays for HV feeders, powers transformers and generators and motors handles testing of MV switchboard including the apparatus eg circuit breakers disconnecting switches, VT’s etc protection devices such as earth fault devices
Responsible for testing dc power supply system including the batteries banks chargers’ inverters handles testing and function checks loop test to control and supervise the computerized system fault recorder
Perform scheme test or functional test testing of inter trip and interlock and trip matrix and monitor testing of mechanical and electrical interlocks schemes
Supervise the settings and testing of protection main step up transformers and auxiliary power transformers oil and winding temperatures and gas pressure, remote tap changers monitor the testing offload and on load
Prepare and submit to Consultant/Client Work Inspection Request, Three-week program, Executive Summary of the project for approvals.
Designation: Electrical Engineer
M/s. Arabian Bemco Contracting Co Ltd, Dammam,KSApower projects division
Assignment Project: 3) Saudi Electricity company Qurrayah power plant (QCPP) 4600 MW FEB 2014 – FEB 2015
This projects consists of six blocks in (3+3+1) configuration each block has 3 165 MW frame GT GE7FA,3 HRSG’s/Doosan vertical type 1 250 MW D-11 GE STG hydrogen cooling surface condensers balance of plant includes 12 70 10000 meter cubic per hour sea water circulating pumps and motors with drum screen trash racks MSF desalination plant hypochlorite plant Demin water treatment and Remin water treatment plant hydrogen building co2 building lube oil shelter BSDG diesel Generators testing and commissioning
Project Execution Exposure:
Reporting to the client Daily/weekly progress report of Site work
Assessment of contractor’s Project Bi-weekly report and ensuring that the Project activities are being carried out according to the submitted over all schedule programs.
Supervision of site activities and provide guidance to site Supervisor.
Involved power cable tray raceway installation as per approved Drawings
Interaction with Consultant/Client (Saudi Electricity Company) Project Management to sort out the urgent issues without affecting the site progress in line with the overall schedule
Monitor the work progress in line with SEC standards procedure
To prepare the Bi-Weekly progress meeting with Client, Consultant to resolve the site issues
Coordination with T&C for smooth execution of testing & commissioning activities
Coordination with other services (Civil, HVAC, Fire Alarm, communication)
Gas based turbine protection and control wiring and GCB and step up/ step down transformers protection and control wiring installation works incomers and outgoing feeders’ motors mov’s instrument cable laying and termination pre-commissioning and
Reviewing and authorizing document as defined in Erection Quality procedure
Prepare markvi and dcs control cable laying termination and lighting layout and lighting JB installation
Prepare and submit to Consultant/Client Work Inspection Request, Three-week program, Executive Summary of the project for approvals.
Designation: Electrical Engineer
Assignment Project: 1) Client: Saudi Aramco utility juaymah Gas Plant contract NO:660*******
MAY-2012-JAN 2013
2.client: Saudi Aramco Wastewater and caustic system up gradation project JAN 2013-JAN 2014
Project Execution Exposure:
Being first point of contact for client, consultant, Project team and subcontractors at site with regard to all activities
Monitoring and ensuring necessary co-ordination between site and engineering process throughout the project
Planning & ensuring the allocation of necessary erection, testing & commissioning resources to meet the requirements
Co-coordinating with HVAC, Fire Protection and other subcontractors for proper co-ordination with electrical systems and instrumentation system pressure switches automation valve operation vibration sensors RTD instruments fire detection and heat absorption equipment and auxiliaries’
Achieved zero accidents in all projects
Planning, monitoring and controlling material and manpower at site
Obtaining Safe receipts for materials from Consultant/Authority
Rising inspection requests for consultant/client’s approval
Preparing Progress certification and getting approval from consultant/client.
Co-coordinating with testing team for conducting HV test on 33kV GIS, 11kV Cables laying and termination etc.,
HV/MV/LV Cable laying and terminations at Switchgears and transformers
Conducting Training for sub ordinates/low level staffs for company’s growth
Prepare method of statement for shutdown activity
Coordination with manufacturer ( ABB,Siemens,Power Economy) to resolve equipment problem
Attending weekly progress meeting with client/consultant
Prepare and submit Monthly progress report with all supporting document to Consultant/Client
Ensure that all activities carried out by the contractors/service providers used on site are completed in a Safe and Environmentally acceptable manner, as well as understanding and maintaining an up-to-date awareness of the HSE Policy
Designation: Electrical Engineer FEB 2004 – NOV 2011
M/s Divis laboratories ltd –vizag, Andhra Pradesh India www.divislaboratories.com
Assignment Project: 1) 132kv /6.6kv Substation and distribution electrical works in pharmacy company
Project Execution Exposure:
Power transformers & Auxiliary power transformers double structure bay single feeding 132/6.6kv substation construction and commissioning work activities
132kv-switchyard equip. like CT, PT, SF6 BREAKER, LA etc.
132kv & 6.6kv HT/LT. Switchgears.
6.6kv HT/480v LT. Motors installation and commissioning
110V D. C. system, include Battery & chargers’ installation and commissioning functional
Laying termination of power, control cable in underground trenches.
Power Systems Control (PLC) integrity of Infrastructure Power System pre startup and Maintenance team.
Installation and Startup of Lighting JB, Power DB, control panels, MCC, Power/Distribution Transformers, Lighting Panels, Distribution Panel, Switchgear Panels and Wiring system
6.6kv distribution lines erection and 480v parallel step-down transformer and installation and commissioning
480v incomer switchgear interlocks and function checks mechanical trips of transformer end to end test ATS function checks and breaker and relay settings and coordination
PERSONAL DETAILS:
Date of Birth : 06thjuly 1986
Gender : Male
Marital status : Married
Nationality : Indian
Languages Known: English, Hindi, Telugu
Passport No : M4453908
Place of Issue : Dammam, Saudi Arabia
Date of Issue : 05thjan 2015
Date of Expiry : 04th jan 2025
I assure the correctness of the above and request your kind attention in considering my CV for suitable position into Electrical Engineer
I wait to hear your kind communication at the earliest and assure you the best of my ability towards the growth of the organization on appointing me. Warm Regards
J.Praveen kumar
Electrical Engineer
Mob:+966*********