CARICULAM VITTA
PERMANENT ADDRESS: K.P. Vinod
Kalapurackal (H), Kottiyoor PO, Kannur
Email: ***********@*****.***
Mobile Phone No: +91-830*******
Qualification :
1. S.S.L.C (Department of Education of kerala).
2. B.A. Economics, Calicute University Kozhikode.
3. MS Office
4. Storekeeping Maximo
5. Warehouse Management Training
Total Experience – 15 Year
Objective:
To seek a challenging position as a Storekeeper, in order to utilize experience and proven expertise in Oil and Gas field to the optimum level to the benefit of my employer and also for my career development.
Training Programs:
H2S and BA Training from ADCO – Habshan
Fire Warden Training course from ADCO Asab
H2S and BA Training from GASCO – Habshan & Habshan 5
ROLL AND FUNCTIONING
1. Store keeping.
2. Material Request Raising.
3. Material receiving.
4. Material inspection.
5. Materials receive and dispatch to site.
6. Stock ledger updating and stocks maintaining our company policies. 7. Materials storing in advance for buffer stock clearing. 8. Assisting material Inspection to QC Engineer.
9. Materials visually inspecting and over shortage and Damage clearing . 10. Assisting store manager in stock auditing on quarterly basis . Assisting store manager in re- conciliation of stock and for casting / ordering of materials in advance. 11. Tools and Equipment stock ledger maintaining in our company policies. 12. Calibration materials updating and storing in company procedure. 13. Insurance material receiving, inspecting and issuing. GULF EXPERIENCE
Abu Dhabi Gas Industries Limited
Position Held : Material co-ordinate/Storekeeper
Duration : From August 2012 to August 2016
Work Description: GASCO main Warehouse Material co-ordination and management Alsa Engineering and Construction Co.LLC - Abudhabi Client : Abu Dhabi Company for Onshore Oil Operations (ADCO). Position Held : Material co-ordinate/Storekeeper
Duration : From July 2005 to June 2012
Epc For BAB North 3 New Water Injection Cluster
Client /Company ADCO - Abu Dhabi On Shore Oil Operation. Contract No – No -15173.01/
About Project :- The work is spread in 3 cluster namely Cluster 30, 31, and 32. 8” Trunk line Shall connected the cluster. 4 branch connection are taken from the trunk line to connect to water injection wells.Each cluster consist 6 water injection Wells 3 Gas injectors converted into water injectors at each of the clusters. GRE buried pipe line shall be laid from each cluster to the corresponding disposal wells.
Replacement of Well Kill Line for OGD "0" & OGD "1" Trunk Lines 6 Wells - Thamama-
'C' (30Wells).
Client/ Company – Abu Dhabi Company for Onshore oil operations (ADCO) Location – Habshan
About project: - Demolition of existing kill lines (annulus and tubing lines) along with instrument tubing, Providing new kill line connection to the X-mass tree non flowing wing valve, Installing Flange Adapter Assembly including needle valve to the annulus casing block valve, Providing depressurizing line for OGD ‘0’ (19 wells + 5 new wells).
Supply of Sales Gas to EMAL – New 36” Gas Pipeline. Client/ Company – Abu Dhabi Gas Industries Ltd. (GASCO) Location – Taweelah
About project: - EPC super paced project of National Importance. Installation of pipelines to Emirates Aluminium Co. (World’s largest single site smelter complex). Pipeline welding/ laying for about 16 kilometres of sizes 24” and 36”. Two piping stations with Gas filters, metering station, pressure reducing skid, ROV’s, MOV’s, Solar Panel, passive shelter, pig launcher/ receivers, LVDB, UPS, F&G System, HVAC installation were constructed. Project duration – 9 months.
Tie in of gas producers Bb741, 742, 743 and Associated Flow lines (Contract No. 7188/ EC10725).
Client/ Company – Abu Dhabi Company for Onshore oil operations (ADCO) Location – BAB/ Habshan.
About project: - EPC project scope include all relevant Engineering works, receipt of free issue materials from ADCO, procurement of all other items and construction works as applicable for 3 No. Gas Producer wells (Bb741, Bb742 Bb743), RMS 1 and DGM for tie-ins and flowline between wells and tie in locations. Total Flow line installation for about 15 kilometres for sizes 6” and 8”.
Effluent Water Re-Injection Pilot Project at Buhasa and Installation of Temporary MPFM Connection
Client/ Company – Abu Dhabi Company for Onshore oil operations (ADCO) Location – Buhasa.
About project: - Dismantling/ maintenance and modification of piping works and installation in accordance to the piping layouts, installation of 6” line pipe, perform one side outside fence tiled road crossing through 12” sleeve, preparation of marked up as-built drawings, modification of chemical injection piping and associated instrumentation and civil works.
Tie-in of Wells Dy-79 and Dy-80 at North East Bab (NEB) Client/ Company – Abu Dhabi Company for Onshore oil operations (ADCO) Location – North East Bab
About project: - Construction of Wellhead piping for 2 wells Dy 79 and Dy 80, including modification of existing manifolds to Tie-in of new wells.
Mechanical & Associated Services for installation of ESD Valves in Unit 42, 43, 44 & 24.
Client/ Company – Abu Dhabi Gas Industries Ltd. (GASCO) Location – Habshan
About project: - Construction included Installation of Emergency shutdown Valves in Unit 42, 43, 44 & 24 and associated Piping / Structural / Civil Works at GASCO Habshan plant.
Construction of Flowlines and wellhead installations in ADCO's Oilfields (Sahil / Asab / Shah), Client – ADCO
Client/ Company – Abu Dhabi Company for Onshore oil operations (ADCO) Location – Asab, Sahil, Shah, Qasawira
About project:- Construction of flow lines, well heads and Well head control panels for about 240 oil wells/ water injection lines including up-gradation of existing well heads by dismantling the existing ones and replacing the same with new ones. The pipe line sizes are 4 inches, 6 inches and 8 inches with different thicknesses. Flowline length - 450 kms. Execution period - 3 years.
Cathodic Protection of Well casings in ADCOs field Bab & Ruwais Client/ Company – EMDAD
The Project comprises of Installation of Cathodic Protection systems for 150 upgrade & new Oil & Gas wells in ADCOs bab & ruwais fields.
Cathodic Protection of Well casings in ADCOs field Bab & Ruwais,Buhasa, -Asab, shah, shahil .
Client / company -NPCC.
About project EPC of Cathodic protection well casing system .
Epc for Additional Manifolds at Bab RDS -2, Additional Manifolds at RDS -4, 5 & 6 and supply & Construction of Main Oil Pump Metering Skid . Client /Company - ADCO - Abu Dhabi on Shore Oil Operation. Contract No-7169.01/ec10722
About Project :- Engineering Procurement Construction Additional Manifold includes detailed engineering of RDS-2 having 18 slots ( 6” ) and residual engineering of RDS 4,5& 6 procurements includes except ADCO free issue materials. The construction includes the fabrication,erriaction of New Additional manifolds at RDS 2,4,&5 It also includes Engineering procurement construction of metering skid at C.D.S.
Previous employment details:
M/s Pan Arabian General Contracting, Abu Dhabi, UAE (From 11 th july 2003 to jun2005) Position Store Keeper &Supervisor
Job Executed
Cathodic Protection of ADCO Well Casings for ADCO Oil Field Bab- Asab
Construction of Flow line and Wellhead Tie in Asab Oil field . EXPERIENCE IN INDIA
5 Years from 16.04.1997 to 01.07.2002
Worked as a storekeeper and field supervisor in K.K Construction Company Peravoor,Kerala . MRPL OIL Refinery, Karnadaka (Fabrication yard Supervisor) As a store keeper I had to handle major Civil, Mechanical, Electrical and Instrumentation materials. Receiving Free Issue materials as per Advice from Concerned authority, maintaining proper record issue the same as per request with proper document,return the balance, if any, with proper documents
I had to receive and issue materials on daily basis maintaining of incoming and out going material register maintaining updated stock records. Coordinating with various department and Head office For material procurement for smooth execution of project. Assisting store manager in stock auditing on quarterly basis,assisting store manager in reconciliation of stock and forecasting / ordering of materials in advance . Monthly stock analysis, for casting of stock for advance entering .
Also got experience in purchasing and ordering of materials, office correspondence,routin office work, filing monitoring despatch and coordination with suppliers. Personal Data
Date of Birth 13.05.1966
Nationality India
Native State Kerala
Marital Status Married
Known Language English, Malayalam, Hindi. Arabic
Pasport Details
Pasport –No L 8211877
Date of Expiry 22.04.2024
Hobbies: - Reading.