RESUME
BALAGURU.M
Mobile: 751*******
Email: ****************@*****.***
CAREER OBJECTIVE
To become a part of a growing organization and apply my professional, managerial and interpersonal skills,thus align myself and work towards the goal and vision of the company to engage myself in reputed organization which encourages enhancing my knowledge and my work will be diligent and deserved with dedication towards the betterment of concern.
EDUCATIONAL QUALIFICATION
COURSE
ACADEMIC
CAMPUS
BOARD
/UNIVERSITY
ACADEMIC
YEAR
PERCEN.
OF MARKS
B.E
(ECE)
Fatima Michael College of
Eng. &Technology
Anna University
Of Chennai
2009 –2013
63.50%
HSC
SBMHSS
Matriculation
2008 –2009
61.01%
SSLC SBMHSS
Matriculation
2006 –2007
71.08%
PROFESSIONAL WORK EXPERIENCE:
1.M/S. Sopan O&M Pvt. Ltd: (Since Jan-2020)
Composite work of JLPL project, GAIL India Ltd, Jaipur Job Title : Sr. ENGINEER Period : 01.01.2020 to till date Project phase : E&I - Commissioning
PMC : M/s. Engineers India Ltd (EIL)
Involved in commissioning activities of Pump, MOV’s & field instruments with PLC panel. 2. M/S. PIONEER E SOLUTIONS PVT LTD (PES): ( 1 YEARS AND 8 MONTHS- ) KKBMPL project of GAIL India Ltd, Kannur, Kerala. Job Title : SITE ENGINEER Period : 07.02.2018 to 31.10.2019 Project phase : Inspection Work
PMC : M/s. Mecon Limited
DUTIES &RESPONSIBILITIES:
Having around 1 year and 8 months of experience in pipeline activities. Responsible for witnessing contractor’s various inspection activities such as fit up using internal & external clamps, weld visual, Tie-in joints, incoming material inspection, Hydro testing, Field joint Coating(FJC) and Holiday testing. Witnessing contractor’s various construction activities such as trenching, lowering, pre padding & post padding, backfilling, road crossing, railway crossing & River crossing by HDD. Witnessing of OFC blowing, OFC testing and splicing. Incoming material Inspection of supplied instruments, installation, testing and commissioning of field instruments like Pressure Gauges, Temperature Gauges, Pressure Transmitters, and Temperature Transmitters, RTD (Skin and Thermo well) as per P&ID. Inspection of Electrical termination, Testing & Commissioning of actuated valves(MOV), metering skids including metering panel. Witnessing of Calibration of Pressure Safety Valves. Inspection of installation, testing and commissioning of LEL Detectors. Inspection of Loop checking and Megger testing of cables. Witnessing of Hydro testing of instrument impulse lines. 3.M/s. OFFSHORE INFRASTRUCTURES LTD (OIL): ( 3 YEARS AND 11 MONTHS ) Having around 4 years of experience in refinery instrumentation works from installation to commissioning.
Work History:
1.M/S. OFFSHORE INFRASTRUCTURE LTD (OIL): 12.04.2014 to 03.02.2018 DDP Project, ONGC refinery, Hazira, Surat.
Job Title : Engineer-Instrumentation Period : July 2017 to Feb 2018 Project phase : Electrical & Instrumentation (E&I) work PMC : M/s. Engineers India Ltd (EIL)
I have associated with Instrumentation works.
CPP Plant, BPCL refinery, Cochin, Kerala.
Job Title : Engineer-Instrumentation Period : Sept 2016 to July 2017 Project phase : Electrical & Instrumentation (E&I) work PMC : M/s. Engineers India Ltd (EIL)
I have associated with Instrumentation works from installation to commissioning. NHT/ISOM project of BPCL Refinery, Mumbai, Maharashtra Job Title : Engineer-Instrumentation Period : Dec 2015 to Aug 2016 Project phase : Electrical & Instrumentation (E&I) PMC : M/s. Engineers India Ltd (EIL)
This is E&I works for the above said project and I have associated with Instrumentation works. CPP Plant, BPCL refinery, Cochin, Kerala.
Job Title : Engineer-Instrumentation Period : April 2014 to Dec 2015 Project phase : Electrical & Instrumentation (E&I) work PMC : M/s. Engineers India Ltd (EIL)
I have associated with Instrumentation works.
DUTIES &RESPONSIBILITIES:
1. Responsible for instrumentation drawings, specifications, calculations, charts and graphs 2. Coordinating with the other departments, clients and contractors 3. Installation of Junction Box as per Layout view verified EIL drawings 4. Cable laying done from control room to Junction Box Field Side 5. After laying of cables, dressing and continuity test carried out at site. 6. Megger test carried out before laying of instrument cables. 7. Erection of instrument GI tray as per as Client specification & drawing 8. Cable Glanding and termination of field side and control room side carried out. 9. Preparation of inspection reports and document approval from client. 10. Trouble shooting and simulation of field instrument loops with control panel 11. Loop checking and functional test of field instrument carried out at site 12. Acquainted with P&ID, Hookup drawings and instrumentation drawings. 13. Hydro testing of impulse piping carried out.
4.M/s. Hamon Shriram Cottrell Pvt. Ltd : (4+ MONTHS ) Cooling Tower & CWTP Project of MRPL, Mangalore
Job Title : Engineer-Instrumentation Period : 10.11.2013 to 07.04.2014 Project phase : Electrical & Instrumentation (E&I) work PMC : M/s. Engineers India Ltd (EIL)
I have associated with Instrumentation works during training periods. SOFTWARE SKILLS
Software Packages : MS Office, Java, C, C++, DCA,
Instrumentation Packages : PLC and SCADA Software. PERSONALDETAILS
Name : M. Balaguru
Father’s Name : K. Murugan
Mother’ Name : M. Vasantha
Date of Birth : 19-07-1991
Sex : Male
Marital Status : Single
Languages known : English, Tamil & Hindi
Permanent Address : S/O K.Murugan, No.9/103,
Sivanthi vinayagar street,
Sivanthipatti,Palayamkottai,
Tirunelveli Dist. Tamil Nadu.
Passport No : N7515032
Date of Issue : 12.02.2016
Date of Expiry : 11.02.2026
knowledge and belief.
I hereby declare that the information furnished above is true to the best of my DECLARATION:
(M.BALAGURU)