Post Job Free
Sign in

Engineer Construction, Architect, technical engineer

Location:
Dubai, United Arab Emirates
Posted:
August 12, 2020

Contact this candidate

Resume:

CHARLITO C. MONREAL

***************@*****.***

+971-********* / +971-*********

Passport number: EB5295087

Dubai Driving License: 1834556

Citizenship: Filipino

Marital Status: Married

PROFILE:

I am very conscientious, committed

and hardworking person who works well

very well with side of the Top Management

and Subordinates. Always up to something

that will give me a new challenge that would

help me to explore my confidence and trust

with what I do. I am flexible, adaptable and

aware. Can work well under pressure and

communicate well withothers.

EDUCATIONAL BACKGROUND

Bachelor of Science in Architecture

Adamson University, Manila Philippines

Year 1985-1992

PROFESSIONAL QUALIFICATIONS

Over 15 years of Gulf experience in

Various Fields of Construction

Industrious and adaptable to the

continuous advancement of global

trends in architecture and construction.

Motivated, articulate, creative,

organized and aspires for excellence

even in the simplest of tasks.

Has exceptional leadership and

organizational skills.

Knowledgeable in construction,

coordination and practice.

Attends seminars and workshops

sponsored by various organization and

establishment to achieve both personal

and professional growth.

Forthright and assertive and;

Proficient in Autodesk AutoCAD 2016

TRAININGS AND ACCREDITATIONS

EHS Blue Code Accreditation

EHS Turquoise Code Accreditation

Estidama Pearl Building Rating

System

Trakhees Accreditation Program on

EHS Green Building Regulations

Affiliated Member- Society of

Engineers UAE

EMPLOYMENT HISTORY AND BACKGROUND

FUJAIRAH NATIONAL CONSTRUCTION CO. LLC

Project Architect, Technical Engineer, QA/QC

P.O Box 16269, Dubai

United Arab Emirates

April 2016– Present

Duties and Responsibilities:

Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site. Cary out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan. Coordinate with the consultant’s representative and Site In-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report and Site Instruction. Monitor all activities related to Quality Management. Responsible for the quality and workmanship of every activity, thorough knowledge of all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary operations.Liaise the Technical Engineer for submission of material submittals to Consultant. PROJECTS ATTENDED:

Commercial Residential Building (B+G+6+R) is a Project owned by M/S Makeen Properties LLC designed to produce the highest grade – international standard – Flats, Offices & Shops. The development is located on International City #3 on plot no. IC3-L-22 in Al Warsan 4th – 624, Dubai United Arab Emirates.

Designation : QA/QC Engineer

The Project has a total of 61 units consist of the following: 1. Ground and Basement Parking = 93 parking

2. Studio & One Bedroom flats = 44 units

3. Two Bedroom flats = 25

4. Swimming pool + Gym

Construction Commencement Date: 01 October 2018 – 30 March 2020 4 Star Hotel Building (B+G+M+3+R) by M/S Abdulla Saif Obaid Alhathboor . Total area of 19,606m2 on Plot no.2210130 at Dubai International Airport- Dubai, United Arab Emirates Construction Commencement date : 05 March 2018 – 02 December 2019 Designation : Project Architect / Technical Coordinator The Project comprises of the following:

1. Shops, Offices, Meeting rooms, A Banquet hall and All day dining at Ground Floor 2. Typical room is consist of (225 hotel rooms and 11 suites) 3. Management Office at Mezzanine

4. VIP lounge at Third floor

5. Gymnasium area at Roof and Swimming pool at Upper roof deck 6. Total parking 99 cars

Zabeel Feedmill Project owned by M/s. AL MEYDAN L.L.C is a large-scale plant designed to produce highest grade – international standard – horse, camel and birds feed to service both performance and stock animals. Moreover, bird feed will be produced as a byproduct of the two primary service lines.The development is located on Dubai-Al Ain highway on plot no. 814- 3156 in Al Margham area, Dubai, United Arab Emirates. Zabeel Feedmill (Phase 1) consists of an energy center (G+R) that mainly includes 3 chillers for air conditioning system along with a water tank.

An underground tunnel will provide a mutual access between a production building and a PRE- production building that will both enclose heavy equipment installed for feed production. The production building is composed of 3 blocks: block A (G+R), block B (G+7+R) and block C

(industrial warehouse G+M) while the PRE-production building consists of 4 blocks as following: block A (industrial warehouse G+M), block B (silo area B+G), block C (B+G+6+R) and block D (G+R).

As for the external buildings, they include guard rooms, RMUs, hay commercial offices, fuel and sceptic tanks.

A network of asphalt roads along with full infrastructure works related to MEP, constitute the scope of external works.

Construction Commencement date : 29 March 2016 – 24 January 2018 Designation : QA/QC Engineer / Technical Engineer

The project is a showroom and workshop which consists of B+G+M+1+R for M/s. Al Tayer Real Estate at Al Quoz Ind.3rd, Dubai, United Arab Emirates. The building contains car showrooms, workshops and offices with a total area of 14,354.91sq.m Contract duration from : 11 November 2015 – 21 January 2017 Designation : Project Architect / Technical Engineer DESIGN CENTER ARCHITECTURE AND ENGINEERING CONSULTANT Project Architect

P.O Box 29175, Dubai

United Arab Emirates

December 2014 –May 2016

Duties and Responsibilities:

Involves in all stages of design and manage the preparation of construction documents and the implementation of the work. Coordinate the project development and lead a team ensuring that the project is running within the agreed time scale. Site supervision and inspection, ensures before commencing the work shop drawings are properly coordinate to other disciplines such as MEP, Structural, Interior Design drawings, Materials Supplier/Vendor and as per site conditions to avoid any discrepancies, discuss to resident Engineer unanticipated site issues and provide solutions accordingly to avoid delays and loss of man hours.

PROJECTS ATTENDED:

Residential Villas at Jumeirah Village

Al-Shaya Warehouse at Jebel Ali Freezone

GEO - GLOBAL ENGINEERING OFFICE (Design Consultant) Project Architect

P.O Box 29175, Dubai

United Arab Emirates

May 15, 2011 – December 10, 2014

Duties and Responsibilities:

Supervise of Construction to Handover of Project. Attend meetings and coordination with Client, Contractors, Subcontractors, Material Suppliers and Authorities, Ensure that all regulations and construction practice as per the regulations. And as LEED certified project all the requirements asper EHS/ Green Building are closely monitored and implemented from the materials to installation. Coordinate with MEPS requirements, Structural Design, Interior Designer for Development details and Material Supplier. As Project Consultant review all the shop drawings prior to construction to ensure that all are coordinated with other discipline to avoid and anticipate discrepancies.

PROJECTS ATTENDED:

Project Location Description

Works

value

AED(M)

Date Mission

Al Furjan

Community

AFC 023

2B+G+7

Al Furjan

Community,

Dubai,

U.A.E.

Construction of

2B+G+7 Hotel

Apartment

2014 Design +

Approvals

Supervision

Al Furjan

Community

AFC 022

Al Furjan

Community,

Dubai,

U.A.E.

Construction of

1B+G+ Podium 11

2014 Design +

Approvals

Supervision

Drinking

Water Bottling

Facility Mai

Dubai LLC

Al Yalayis 2,

Dubai

Construction of

Water Bottling

2013 Design +

Approvals

Supervision

Paramed

InternationalF

ZCO

JAFZA,

Dubai

Construction of

Workshop Facility

& Office

2013 Design +

Approvals

Supervision

Man Diesel &

Turbo

Middle East

LLC

Fujairah Construction of

New Office and

Workshop Facility

2013 Design +

Approvals

Supervision

ACME

Building

Materials

Trading LLC

Ras Al Khor,

Dubai

Construction of

G+M and Open

Shed

2013 Design +

Approvals

Supervision

Mobis Parts

Middle East

Second

Warehouse

Jafza Dubai Construction of

Warehouse on Plot

No. S60108 in

Jafza

2011-

2012

Design +

Approvals +

Supervisionup to Building Completion

Caterpillar

Logistics

Services

International

Jafza Dubai Construction of

Warehouse on Plot

No. S50911 in

Jafza

with43,262sq.m

area

2011-

2012

Design +

Approvals +

Supervisionup to Building Completion

OGER ABU DHABI L.L.C

Site Architect / AutoCAD Designer

P.O Box 35656, Abu Dhabi

United Arab Emirates

April 18, 2007 April 30, 2011

Duties and Responsibilities:

Overseeing submissions, schedules and pending jobs. Preparing sketches, diagrams and other drafting related duties, utilizing manual drawing skills as well as computer aided applications. Responsible also in giving site instructions based on reviews of construction plan. Visit site for further inspection. Perform other applicable task assigned by Project Manager and or the Management, Team leader Auto Cad Department UAE University New Campus Project.

PROJECTS ATTENDED:

Al Sowwah Square formerly known ADFC

(November 2009 - April 30, 2011)

Al Sowwah Square, Abu Dhabi UAE

ABU DHABI FINANCIAL CENTER – Al Sowwah Square Island, Abu Dhabi U.A.E.

• This buildings are part of the Sowwah Square complex with emphasizes a sustainable design approach throughout and looks beyond the LEED certification process to integrate both active and passive sustainable design strategies.

ADFC TOWERS

• Tower’s 1 and 2 are class A buildings that consist of 31 stories and Tower’s 3 and 4 that consist of 37 stories. The first full office floor of the building start 33m above the ground level, providing a highly transparent open lobby and elevating the views on all tenant floors. Sitting on the top of two Retail level, the Office floors of this buildings overlook the water and the surrounding landscaped spaces.

ADFC RETAIL

• The Retail asset of the project is located below the four Towers and the Stock Exchange and is spilt over two levels of +3.00 and +8.00 spreading over 23,215m2. The Retail accessed from North and South Carpark at level +8.00 via three scenic lifts and two escalators each, and via four VIP corridors from the carpark at +3.00 level. UNITED ARAB EMIRATES UNIVERSITY NEW CAMPUS PPP DEVELOPMENT – Al Ain

The new campus, comprising 280,000 square meters of newly built accommodation, will include state of-the-art educational, sporting and residential facilities. These include 10 five- storey buildings for female residences, brand new academic facilities and shared laboratories, a diverse range of recreational offerings and a grand ceremonial building. The overall project consists of 32 buildings that will include the academic, administrative and services. MIDMAC CONTRACTING COMPANY LLB

Architectural AutoCAD Designer/ Site Engineer

Doha, State of Qatar

February 2005 – May 2006

Duties and Responsibilities:

Prepare and responsible in Architectural, Structural and Civil Shop Drawings, Coordinate and involve with Site Engineers in weekly site meeting, ensuring that all Shop Drawings are properly coordinated. Provide interpretation and development details of designs in shop drawings, Work closely and extensively on the resolution for the redesign of the Clubhouse and Reporting the status of the project to the management. Perform other task assign by the management.

PROJECTS ATTENDED:

RESIDENTIAL COMPOUNDWEST BAY, DOHA QATAR

With total built up area of 86,990 square meters. The area is comprises of 200 Villas and divided in (4) Four Types and a state of the art Clubhouse as the focal point INTERNATIONAL CENTER FOR COMMERCE AND CONTRACTING

(I.C.C.C.)

Supervisor AutoCAD/Micro station Operator

Jeddah and Al Khobar K.S.A (Eastern and Western Region) October 1998 to March 2003

Duties and Responsibilities:

Responsible to all shop drawings for ongoing projects. Prepare and review all drawings. Coordinate all drawings with Site Engineers. Attend meetings on site with clients, consultants, sub contractors and project manager. Coordinates, organize and oversee the workflow of CAD team and ensure drawings are properly coordinated with all the specified discipline. Prepare Technical drawings and sketches. Support all team members in all project efforts. Perform other administrative task within the department and provide work direction and assist less experience staff as necessary.

CHARLITO C MONREAL

Applicant



Contact this candidate