Post Job Free
Sign in

Plant Power

Location:
Qatar
Posted:
August 10, 2020

Contact this candidate

Resume:

RESUME

Prashant v. wani

Instrument Technician

Gayatri Niwas,Bld.no-1/202, Behind Police Station, Omkar Vasahat, Manda, Titwala (west), Pin

- 421 605.

Dist – Thane, MAHARASHTRA, INDIA.

Cell : 91/ 981**-*****

Email : ****************@*****.***

Objective

I have a systematic approach towards works & adapt quickly to new environment, which is

one of my asset.

Always ready to perform the given task.

Education Qualification

EXAM INSTITUTE YEAR %

NCVT Hindustan Petroleum Corporation NOV 2001 74

INST. Ltd,Mumbai Refinery

MECHANIC

GOVT. ITI SEPT 2000 72.32

ITI Ambarnath, MAHARASHTR ITI

INST. MECHANIC

HSC Mumbai Board MARCH 1998 65.53

SSC Mumbai Board MARCH 1996 62.32

Undergoes A.V.T.S. training in Process Instrumentation.

passed Diploma Engg. In Electronics & Telecommunication from Distance Education, RVD

University, Mumbai region, Mumbai in 2011-12.

Computer Literacy

MS Office, Internet Access, Operating systems –Windows 98/2000/XP

KNOWLEDGE OF CALIBRATION AND MAINTENANCE OF FOLLOWING

INSTRUMENT….

Control Valve, Smart Transmitter, Valve Positioner, Pressure, Vacuum & Temperature Gauges

I/P Converter, Level, Flow, Pressure, Vaccum & Temperature Controller and Transmitter,

All type Switches, Solenoid Valve, Thermocouple & RTD Sensor, On-off Valves, Radar&

Ultrasonic level transmitter, Mass flow meter, Analytical instrument like

ph/conduct.meter,o2,no,n2o analyzer, weighing balance, vibration probe,RPM sensor.

Working Experience on DCS & PLC Systems…

TATA – HONEWELL. TDC-3000

YOKOGAWA CS-3000 with FF INSTRUMENT

ALLEN BRADLEY PLC SYSTEM

ROCKWEL LOGIC 555/5555 DCS BASE PLC

SCHNEIDER PLC SYSTEM

YOKOGAWA PROSAFE PLC SYSTEM

EMERSON (DELTA V) VERSION-10.2, 9.0, 8.0

FIELDBUS & MODBUS SYSTEM.

ABB DCS VERSION-8

Erection, Installation as per P&ID,

Calibration as per ISO requirement,

Continuity testing, hot & cold loop checking,

Panel wiring as per detail,

troubleshooting in MCC, Instrument Marshalling Panel as well as field Instrumentation.

Project Commissioning, Maintenance, Documentation.

Familiar with HART Communicator 275,375

Fire and gas detection and alarm systems on separate PLC

Working experience on foundation field bus & profibus systems

Fault finding and rectification for instrumentation systems.

carrying out isolations of instrument and control systems

Working independently in rotating shift as and when required by operation and take care of

Instrument systems.

To calibrate, Maintain Instruments and work according to Permit Systems in the Plant.

To update the log books after completion of jobs and update other records as required by client

Maintenance of all Vibration monitoring equipment on rotating machines

Help devise and implement preventative maintenance procedures, based on vendor technical

information and manufacturers specifications.

working last nine years in oil, petro chem. pharma, chemical & gas Industries through Projects...

Tank gauging system maintenance and attending to Enraf level gauge.

Repairing and calibrating all fire and gas system.

Personal Details

Name: Mr.PRASHANT VASANT WANI

Date of Birth: 15th Oct. 1980

Languages Known: English, Hindi & Marathi.

Marital Status: Married

Nationality: INDIAN

Religion: Hindu

Passport: E 3193081…. Expire on 28-09-2012

Declaration

The information given above is true to the best of my knowledge and I will be responsible for

any flaws in it.

Date:

Place: Mumbai

Prashant Wani

Experience

Sr. Name of Companies Responsibilities

1 EGTL GAS PROJECT Joined for Pre Commissioning under project dept.

NAIGERIA (Instrumentation)

Sr.Instrument Technician WORK ON FF INSTRUMENTS

(under contract with Techint cimimontubi Done pre loop & final loop checking with CNL witness

ITALY AND Chevron naig.ltd) calibration of field instruments, interlock checked by

Since DEC. 2012 operating Shutdown.

Done Troubleshooting in MCC, Instrument Marshalling

Panel as well as field Instrumentation while

Commissioning.

( yokogawa prosafe)

Familiar with HART Communicator 475 And

Yokogawa CS- 3000 DCS Systems.

2. Deepak Fertilizers & Petrochemicals Working in Maintenance Dept.

Corporation Ltd. Taloja, Mumbai. Doing routine calibration of field instruments as per ISO

Sr.Instrument Technician requirement. Update the log books after completion of

(Employee) jobs and update other records as require.

Since NOV. 2011 TO DEC.2012 Maintain Instruments and work according to Permit

Systems in the Plant independently in rotating shift.

Troubleshoot in MCC, Instrument Marshalling Panel as

well as field Instrumentation online.

Familiar with HART Communicator 275,375.

Honeywell & Emerson DCS Systems.

3. Galaxy Surfactants Ltd. Taloja, Working in Maintenance Dept.

Mumbai. Doing routine calibration of field instruments as per ISO

Ethylene oxide processing plant. requirement. Update the log books after completion of

Instrument Technician jobs and update other records as require.

(Employee) TPM activity follows for preventive Maintenance.

JAN. 2008 TO NOV.2011 Maintain Instruments and work according to Permit

Systems in the Plant independently in rotating shift.

Troubleshoot in MCC, Instrument Marshalling Panel as

well as field Instrumentation online.

Also involve in project work.

Familiar with HART Communicator 275,375. &

ROCKWEL LOGIC 555/5555 DCS BASE PLC,

Emerson 10.3 DCS Systems.

4. Bombay Dying Rasayani, Panvel. Joined for Erection & Commissioning under project

Instrument Technician cum supervisor dept. (Instrumentation)

(under contract with Supertech inst. Pvt. Done cold & hot loop checking, calibration of field

ltd, Mumbai) instruments, interlock checked by operating Shutdown.

JUNE 2007 to DEC. 2007) Done Troubleshooting in MCC, Instrument Marshalling

Panel as well as field Instrumentation while

Commissioning. Fire and gas detection and alarms

system checked on separate PLC.

( yokogawa prosafe)

Familiar with HART Communicator 275,375. And

Yokogawa CS- 3000 DCS Systems.

5. Deepak Fertilizers & Petrochemicals Shutdown of Ammonia Plant- Done carrying out

Corporation Ltd. Taloja, Mumbai. isolations of instrument and control systems, calibrated

Instrument Technician cum supervisor of field instruments, reinstalled back.

(under contract with Safetech industries, Assist to operation people for Commission of plant.

Mumbai)

APRIL 2007 To MAY 2007

6. ThyssenKrupp Electrical Steel India Pvt. Erection & Commissioning of HYDROGEN Plant

Ltd.Igatpuri Erection, Installation done as per P&ID, Assist to Inst.

Instrument Technician & supervisor Engg. & operation people for Commission of plant

(under contract with Supertech inst. Pvt. Done cold & hot loop checking calibration of field

ltd, Mumbai) instrument interlock checking by operating shutdown.

JULY 2007 to APRIL 2007) Done Troubleshooting in MCC, Instrument Marshalling

Panel as well as field Instrumentation while a Handled

maintenance of system. And work on Yokogawa

CS- 3000 DCS Systems.

7. Ranbaxy India pvt.ltd.Tonsa-Panjab. Erection & Commissioning of mention Plant,

Erection, Installation done as per P&ID, Assist to Inst.

Instrument Technician cum supervisor

Engg. & operation people for Commission of plant

(under contract with Supertech inst. Pvt.

Done cold & hot loop checking calibration of field

ltd, Mumbai)

instrument interlock checking by operating shutdown.

JULY 2006 To JUNE 2007

Done Troubleshooting in MCC, Instrument Marshalling

Panel as well as field Instrumentation while Handled

maintenance of system. And work on ABB DCS

Systems.verson-8.2

8. Deepak Fertilizers & Petrochemicals Erection & Commissioning of I.P.A. Plant

Corporation Ltd. Mumbai. Erection, Installation done as per P&ID, Assist to Inst.

Instrument Technician cum supervisor Engg. & operation people for Commission of plant

(under contract with Supertech inst. Pvt. Done cold & hot loop checking calibration of field

ltd, Mumbai) instrument interlock checking by operating shutdown.

MAY 2005 To JUNE 2006 Done Troubleshooting in MCC, Instrument Marshalling

Panel as well as field Instrumentation while Handled

maintenance of system. And work on Emerson Delta v

DCS Systems.

9. IPCL THANE Working in Maintenance Dept.

Instrument Technician Doing routine calibration of field instruments as per ISO

(Under contract with Miraj Instruments, requirement. Update the log books after completion of

Mumbai.) jobs and update other records as require.

MARCH. 2004to MARCH 2005. Maintain Instruments and work according to Permit

Systems in the Plant independently in rotating shift.

Troubleshoot in MCC, Instrument Marshalling Panel as

well as field Instrumentation online.

10. Bombay High Off-Shore Erection & Commissioning of mention Plant,

(SHP,SHG,SHQ,SHW,ICP,ICW) Erection, Installation done as per P&ID, Assist to Inst.

Instrument Technician Engg. & operation people for Commission of plant

(under contract with O.H.C.S chembur) Done cold & hot loop checking calibration of field

NOV. 2003 To MARCH. 2004 instrument interlock checking by operating shutdown.

Done Troubleshooting in MCC, Instrument Marshalling

Panel as well as field Instrumentation while Handled

maintenance of system. And work on Emerson Delta v

verson-8.2/Honewel DCS System

11. A E S Kelanitissa Power Plant, Erection, Installation commissioning done as per P&ID,

Colombo. Sri lanka. calibration of field instruments. Done Troubleshooting

Instrument Technician in MCC, Instrument Marshalling Panel as well as field

(Under contract with Miraj Instruments, Instrumentation while Handled maintenance of system.

Mumbai.) Familiar with HART Communicator 275,375. And

APRIL 2003 To OCT. 2003 Yokogawa CS- 3000 DCS Systems.

12. Bharat Petroleum Corporation Ltd., Done carrying out isolations of instrument and control

Mumbai Refinery (Shut Down Project) systems, calibrated of field instruments, reinstalled back.

Instrument Technician Assist to operation people for Commission of plant.

(under L&T ECC division) as well as field Instrumentation while Handled

MARCH 2002To MARCH 2003 maintenance of system.

13. Indian Oil Blending Ltd., Mumbai (Auto DHDT & FCC Plant Commissioning

Batch System) Erection, Installation done as per P&ID, calibration of

Instrument Technician field instruments. Assist to Inst. Engg. & operation

(under contract) people for Commission of plant.

NOV. 2001 To MARCH. 2002



Contact this candidate