Post Job Free
Sign in

Mechanical Engineer (HVAC, Plumbing, Firefighting) services

Location:
Kadapa, Andhra Pradesh, India
Salary:
15000
Posted:
August 05, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

SHAIK KHADER BASHA

Mechanical Engineer

E-Mail: ***********.***@*****.***

Mobile: +919*********

Sr. HVAC Project Engineer

PERSONAL STATEMENT:

I am a committed and hardworking individual who enjoys a challenge. In addition to very strong, communication skills, I am able to work effectively in a team. I can also demonstrate advanced Problem-solving skills and thrive under pressure. Having 15 years ‘of experience in HVAC

/Plumbing/Fire fighting works. Project Supervision of Commercial & On-shore/Off shore refinery Projects. HVAC_MEP (Construction, QA/QC, Commissioning, Preservation, Start-up, Maintenance, Training, worked in gulf countries (Dubai, Qatar, Kuwait) prestigious projects. my drive and ambition ensure I am valuable addition to any company. PROFILE SNAPSHOT

EDUCATIONAL AND PROFESSIONAL CREDENTIAL

B. TECH IN MECHANICAL ENGINEERING from J.N.T.U

HYDERABAD INDIA (India).

DIPLOMA IN MECHANICAL ENGINEERING from S .B.T.E.T HYDERABAD INDIA (India).

COMPUTER SKILLS

• Carrier E 20 II Hourly Analysis Software Programmed

• Auto Cad 2016

• Navis Work

• Duct size, Pipe size software

• BIM

• M.S Office

TECHNICAL PROFICIENCY

TECHNICAL TRAINING

Undergone 4 months Advanced Practical Training Course in HVAC (Design, Erection& Maintenance of Air Conditioning & Ventilation system) at S.S COOLING SYSTEM of Andhra Pradesh. India

EXPERIENCE IN PROJECTS

Refinery project

High Rise Towers-54F

Hospitals

Stadium

Sub Stations

Mosque

Warehouse

Harbor Control Tower

Hotels

HVAC SERVICES

• Engineering &Design

calculations.

• Project Supervision of

works.(Equipment

Installation, Ducting,

Chilled water pipe,

Insulation works..

• Material Selection

PLUMBING SERVICES

• Under & Aboveground

services.

• Drainage (Waste, Vent,

Soil)

• Potable water Services

• Sanitary Installation

FIRE FIGHTING SERVICES

• Sprinkler & Hydrant

system

• Fire Suppression System

Experience in Engineering Document Review:

• Project Documents:

- Specification, Shell & Dep Standards, MEW-6& MEW-7 requirement, Contract, BOQ.

• Design Documents:

- HVAC design Load calculation, Duct Static Calculation, Head loss calculation.

• Drawings:

- P&ID, D&ID, Piping Isometric drawing, Duct layout drawings, Control wiring drawing,

- Plumbing drawing, Fire fighting drawings.

• Procedures:

- Method Statement, ITP, WPS, Painting Procedure for fire fighting pipe. FAT &SAT

• Vendor document

- MAR (Chillier, AHU, PHU, CFU, STB, FAN, PUMPS, Tanks, pipe fittings,Heater )etc. Experience in HVAC Design:

Calculation:

o Heat load calculation by using –HAP-4.9

o Duct & Pipe Design

o Duct static calculation for AHU & FAN

o Pump head calculation

o Ventilation calculation

HVAC Equipment Selection:

o Air cooled Chillier,

o Air handling unit,

o Package handling unit

o Chemical filter Unit

o Chilled water Pump

o Pump

Experience in Supervision of Mechanical Construction works:

Responsibility’s

Review of terms & Conditions, Design, Drawings, Project Specification

Check Project Execution Plan – construction work program, material procurement schedule shop drawing submission, manpower histogram.

Attend Pre Construction Meeting of contractor during meeting review overall project plan -Materials /Tools & Machinery /Manpower/project start &End target/Summer Plan/QA/QC/HSE /Drawing submission and MAR submission.

Review &Approve the MAR Materials Approval Request and Drawings Approvals to proceed further work.

Review & Approve Method statements, work procedure. FAT & SAT

Check Material Vendor & Supplier should be from Client Approved Vendor List

Attend weekly meeting with Client

Attend coordination meeting with contractor

Monitor site construction progress work

Give weekly progress report to Manager

Check the contractor delivered material at site as approved.

Given approval of typical installations & Mock up flats for all Mechanical services to start contractor work.

Check zone wise and level wise Equipment schedule of building’s Air cooled chiller, Air handling units, etc.

Execution of work based on approved shop drawing, supervise and monitoring the works according to the local authority regulation

Ensuring the contractor site work carried out as per Project specification & Method statement.

During site observation contractor fail to meet quality stand, specification deviation issue NCR to contractor.

Attend HVAC installation work inspection, during inspection any found (damages, Miss out points, not matching with approval drawing) given punch point A&B to contractor for correct all given points.

Review the contractor payment Invoice and approved

Discuss with contractor QS for payment approval

Coordination with Contractor Construction Engineer & QA /QC

Weekly safety site walks with safety officer

Check ITR process for Mechanical Completion.

Check all given punch should be closed by contractor before false ceiling closed.

Attend FAT & SAT inspection

Mechanical Completion walk down with Client

Check TAB Activity’s for Commissioning works.

Site work Monitoring-

- HVAC, Plumbing, Fire fighting work

• Duct work Activity’s

Checking Ducting fabrication as per SMACNA standard

Duct installation as per shop drawing (duct sizes and level of ducts)

Duct insulation work

Duct damper VCD, Fire Damper, installation as per drawing and size

Duct leak test (Lighting Test)

After completion of installation request to subcontractor submit IN to QC for inspection.

Grills & Diffusers Installation.

Equipment (Chillers, Air Handling Unit, Fans, Pumps, etc.) Installation

• Piping work Activity’s

• Chilled water Underground Aboveground (C.S, M.S, Pre Insulated, GRE)

• Checking subcontractor delivery material pipe comply with project specification.

• Pipe painting work procedure follow

• Pipe installation & fabrication of spool pieces’ joints threaded & weld joint Valve package of FCU, AHU, Chillers, Pump, Hydro test Package Process

• Commissioning Activity’s

- Air Balancing & Water Balancing

• Plumbing Activity’s

Underground Pipe work supervision

Check excavation work for underground Drainage, Soil, Vent line, portable waterline.

Trench excavation size Depth, Width should be as per approved drawing

Check Installation of pipe sizes as per drawing.

Checking sand bedding level Sand padding level as per method statement.

Ensuring pipe joint area solvent should apply properly

Check P-trap S-trap connection with Drainage & Soil line.

Checking pipe Route, Level& Slop as per approved drawing

Checking Floor Drain, Floor clean out point location should be as per drawing.

Checking inside building drainage connection to Outside manhole connection Properly.

After Gravity Test, Sand padding work will be carried out.

Taking precaution on backfilling time installation main pipe should be not damage.

Inform supervisor and foreman to Site work carried out as per HSE regulation.

Aboveground Pipe work supervision

During Slab casing time Checking installation of Pipe Size of sleeve & Location should me matching with approved drawing.

Checking material should be (pipe, fittings, insulation, clamps, pumps, sanitary Items etc.) as per approved MAR.

Check pipe support maintain distance as per standard detail drawing.

Checking installation of Clamp as per standard drawing.

Checking Pipe installation work for Hot water supply & Return Line service

Checking bottom of pipe and size of pipe as per approved drawing.

Checking pipe route should be matching with coordination drawing.

Ensuring brazer should be certified brazer.

Checking brazing work at Pipe joint area.

Checking foundation sizes for PUMP & Water Heater, water storage tank.

Checking pipe Insulation work.

Inspect Hydro test for Hot water supply and return line as per method statement.

Installation of Booster Pump, Hot water circulation Pump, Submersible Pump.

Installation of Water Heater, Water Storage Tank

Sanitary installation

-WC,

-WB,

-Medical Sink,

-Pantry Sink,

-Janitor sink

-Emergency EYE wash & Shower

-Soap Dispenser,

-Hand Dryer,

Firefighting Activity’s

• Inspecting subcontractor delivery material at site comply with project specification.

• Pipe painting work procedure follow as per mention painting procedure.

• Pipe installation & fabrication of spool pieces’ joints threaded & weld joint

• Review Test package for sprinkler line & Hydrant line Hydro Test Process.

• Installation of sprinkler, valves, Landing, Test valve, check valve, etc.

• Installation of Fire Hose real, fire Department connection, Fire Hydrant,

• Extinguisher.

Fire suppression system (Clean Agent) Activity’s

• Checking subcontractor delivery material comply with project specification.

• Pipe painting work procedure follow as per mention painting procedure.

• Pipe installation in Communication, Rack room, Electrical room at raised floor& pipe connection with cylinder. FSCP installation.

Coordination with Civil, Electrical, QC, QS, Safety, Turnover Team Activity’s

Civil: Slab, block wall openings for services, floor clearance, ceiling clearance, material lifting. Scaffolding, Equipment foundation, Material storage etc.

Electrical: site Duct& Pipe clash, Equipment power data information etc.

QA/QC: Method statement, ITP, Work Inspection.

QS: BOQ, Work quantity, Company Payment approval.

Safety: Follow up HSE Rules Regulation at site, Work Permit, Risk Assessment.

Turnover: ITR, submission, MC walk down,

Experience in Maintenance of HVAC

Review all Equipment Vendor Documents

Review Operation & Maintenance Manuals

Review SPIR Documents.

Supervise maintenance department activities

Equipment Maintenance

Air Handling unit’s/Package units/ Air-cooled water chiller/Pumps/Split units/FCU/Fan

Supervise maintenance team.

Keeping daily logs and records of all maintenance functions.

Providing technical direction and instruction to technician Before start any work cover Fire Detector otherwise fire alarm system will be ON.

Cleaning adjusting and repairing system and performing warranty service

Cleaning filter weekly

Checking Motor belt monthly wise

Checking vibration spring of motor

Checking speed of motor

Checking inside ahu light performance.

Checking Cooling Coil of AHU

Checking damper on off position

Checking chiller compressor oil level and change as per vendor requirement.

Cleaning condenser coils

Maintain daily record of Equipment’s – Temperature, Pressure, Flow rate, etc.

Monitoring ALL equipment status with BMS

RUN, STOP, FILTER, TEMP, HUMIDIDTY, DAMPER ON/OFF

Setting schedule OF Chillers & Pumps, and monitoring through BMS.

Attend contractor project training

Receive complaint form client and send technician for repair work.

Coordination with equipment vendor for spare parts.

Follow HSE safety rules and regulation.

Issue work permit to vendor & Contractor at site before working SKILLS:

• FEED Design, Engineering, Construction, Modifications/ Installation, Updating, QA-

• QC, Commissioning, Maintenance projects for HVAC and Mechanical systems, alongside with the interface systems.

• Experienced in Project Management phases starting from Design/Engineering till Start-up/Maintenance and then Training /Assessing if requested.

• Very experienced in dealing with contracts, PMC, Client sub-contractors, vendors, planning and execution systems, HVAC _MEP proposed equipment, purchasing orders and procurement system, according to project design, standards and project/client requirements.

• Very experienced in HSE and work safe practices able to identify, mitigate, control HSE project hazards.

• Demonstrated capability to manage multi-discipline teams, ability leads people and work in a team.

• Acute sense of duty in any moment, day or night and very good educated.

• Self-motivated with the ability to work under pressure whilst achieving maximum productivity, Safety and quality standards.

• Ability to communicate technical quality issues with all levels of personnel internally and also externally with customers and suppliers in the languages: English, Russian, French, Italian.

• Organizational effective skills, ability to handle multiple tasks, Strong communications, presentation and planning skills.

• Fully familiar with on-shore/off-shore engineering drawings, standards, equipment, installation, inspection, QA/QC, preservation, pre-commissioning commissioning/start-up, maintenance

• Ability to adapt quickly at new installations and technology.

• Stress resistance and initiative; long term orientation and corporate thinking

• Very good background managing computerized maintenance planning systems PROFESSIONAL EXPERIENCE

Working as a Sr.HVAC Engineer with Hyundai Engineering &Construction Kuwait Project Al-Zour Refinery–Package-5 KIPIC. From12th

FEB 2017 to MAR 3rd

2020.

Worked as a Project Engineer with Mechel Engineering-project’s-1.QatarAspetar- Hospital2. Qatar University from2nd

Jan 2012 to Sep 9th

2014.

Worked as a Mechanical Engineer with ARABIAN Contracting Dubai. Project Irani Hospital Project - from04 Sep 2010 to 20 Dec 2011.

Worked as a HVAC Engineer with Bilt Middle EastL.L.C Dubaifrom May 2006 to 18th July

2010

Indian Experience

Worked as a Mechanical Engineer with S SCOOLING HYDERABAD from 18th Aug 2004 to

25th

Mar 2006.

Worked as a Mechanical Engineer with Pristine Comfort Kadapa Andhra Pradesh from 18th

Jan 2015 to 10th

Dec 2016.

PROJECTS IN -DUBAI

Name of the Project : GOLF Tower Phase -2

Building Description : (B+G+34Floors) x 2nos of Towers, B+G+5F,

Name of the Project : Trio Tower-

Building Description : (B+G+26Floors), (B+P+G+28), (B+G+27)- Towers

Name of the Project : Myden barns

Building Description : (G+2Floors)

Name of the Project : Irani hospital-

Building Description : (B+G+2F) 2 Buildings

Name of the Project : Marriott Hotel

Building Description : (B+G+2p+54 TYP) Tower.

Name of the Project : Golf Tower Phase -4

Building Description : (2B+G+24), (B+P+G+23) 2 Nos of Tower PROJECTS IN QATAR

Name of the Project : Aspetar Hospital

Building Description :(BF+GF+3Floors) (GF+MF+3F), GF swimming Pool.

Name of the Project : Qatar University

Building Description : (GF+3Floors) -10 Nos of Buildings, GF-3 Nos of Buildings.

Name of the Project : Burger Outlet Restaurant

Building Description : Ground Floor

PROJECT IN KUWAIT

Name of the Project AL- Zour Refinery Project

On Shore Buildings Off Shore Buildings

• Harbor Master control Tower o Unit 98 Substation

• Marine Operation Building o Unit 93 Substation Unit

• Marine Warehouse Building o Unit85 Substation

• Workshop Store Buildings o Unit 93 Operation facility Building

• Pollution Equipment Store Building

• Mosque

• Clinic & Custom Immigration Building

PERSONAL DETAILS

Name SHAIK KHADER BASHA

Sex Male

Date of Birth 5/05/1980

Marital Status Married

Passport No L3431098 (ECNR)

Date of Expiry 21/06/2024

Linguistic Abilities English, Hindi, Urdu

Contact Number India +91-949*******

What sup +919*********

I hereby declare that the above details furnished by me are true to my knowledge. Place:

Date:

Sr. MECHANICAL ENGINEER

(SHAIK KHADER BASHA)



Contact this candidate