Post Job Free
Sign in

ROV Pilot/Technician

Location:
Dapitan, Cebu, Philippines
Salary:
400-500 USD/dayrate
Posted:
August 05, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

NAME: REY DELIG OCAÑADA

POSITION: ROV SUPERVISOR /SENIOR ROV PILOT/TECHNICIAN

DISCIPLINE: ELECTRICAL ENGINEER

DATE OF BIRTH: SEPTEMBER 23, 1982

NATIONALITY: FILIPINO

MARITAL STATUS: MARRIED

PASSPORT NO: P4970465A

EXPIRY DATE: NOVEMBER 02, 2022

SEAMAN’S BOOK NO.: C1322403

EXPIRY DATE: SEPTEMBER 8, 2028

FOET +BT: MSTS ASIA (SINGAPORE) PTE. LTD, SINGAPORE

CERTIFICATE NO.: 52685808260219658282

EXPIRY DATE: FEBRUARY 25, 2023

OFFSHORE MEDICAL: ANGELUS MEDICAL CLINIC

(OGUK /2018/2582)

EXPIRY DATE: FEB. 4, 2021

CURRENT LOCATION: PHILIPPINES

CONTACT NUMBER: +(63-927-***-****

+(63-927-***-****

EMAIL ADDRESS: ***********@*****.***

QUALIFICATIONS & CERTIFICATES

Registered Electrical Engineer

‘O’ Levels: English Language

High voltage certificate

Fibre Optic termination competency

OFFSHORE CERTIFICATES & TRAINING

IMCA High Voltage Certificate

IMCA member Cert. no. SIPL151 (R.O.V Pilot Technician)

FOET – Further Offshore Emergency Training and Travel Safety by Boat (Course Code :5808)

LIUHUA Safety Pass

H2S Safety Training

Sunbelt Hydrogen Sulfide/Breathing Apparatus Awareness Certificate No. CO#8-251***-***

Shipyard Safety Instruction Course

JMJ / IFF Safety Training

MMI and Control System Training

MTCS High Voltage Safe Working Practice

RELEVANT EMPLOYMENT HISTORY

DATE POSITION EMPLOYMENT

March 2015 to Present ROV Supervisor / Snr. P/T PAGEO SubOcean

PT. PAGEO Utama

Oct. 2007 to Feb. 2015 ROV Senior Pilot Technician Sonsub Int Pte. Ltd.

May 2005 to Sept. 2007 Electrical/Mechanical SMC (San Miguel Company) Phil.

Maintenance

March to May 2004 Visayan Electric Company (OJT) Transformer maintenance

KEY EXPERIENCE

Experience in the ROV industry:

Mobilizing and Demobilizing R.O.V in different kind vessel

ROV Upgrading in Singapore workshop

Capable of piloting the ROV vehicle

Working with Oceaneering SWIFT R.O.V

Working with Fugro R.O.V at China for flow line cutting using Diamond wire cutter

Working with C.U.T for Diamond wire cutter

Working with Quasar ROV

Project experience:

Transportation and Installation of WSC, WHP and Gas Export and In-field pipelines and PLEMS Jacket Installation (using underwater hammering) and (underwater levelling tools)

Plug and Abandonment of ANOA subsea well, SA10, SA13, SA14 and SA20.

Pre/ Post Pipeline Installation surveys and support

Pipeline (As-Build and As-Laid) Survey

Benzene Removal Project

Touchdown monitoring (400 meter away from barge)

Pipeline Installation including beach pull

Riser Installation

Cutting of MLS (using 40” diamond wire cutter)

Flow line and Riser Removal

Grouting support

DFSC support

IWCP Installation

PISA Installation

Valve Operation using TDS

Jacket Installation

Spool installation

Seabed Debris Survey

Mattresses Installation

Choke Changes

LBL installation at 1500M depth

Sleeper Installation

Flexible flow-line Installation support

Special equipment experience:

Schilling Manipulators 7F Titan4 also (Titan 2, Titan 3, Orion, Conan)

5 Functions Manipulator (Schilling (Rigmaster,Rigmate),TA16

Survey Equipment’s

Octans Gyro Seanet Profiler

TritechSonar Blueview Sonar

Didson Sonar GEN5 mux

IPS DVL

TSS 340/350 Rovnav

Boom Cameras CP Probe

FlexJet

Hydraulic Cutter (75mm with intensifier) Hard line

Hydraulic Cutter (38mm and 18mm) Hard line

IVP (Intelligent Valve Pack)

Seanic VP 101

Torque Tool Seanic Smart (Class 1-4)

RAY 5 Torque tool

Torque Limiter

Juice Squeezer

Hot Stab Tool

VG 152 Graylock Gasket Tool

Jitter Pump

Hypro Low Pressure Pump

Stanley dredging pump

Under Water Levelling tool

Stanley GR29 Grinder and Cutter

Stanley BR45 Breaker and Driver

Neron High Pressure Pump

TP08 Trash Pump

MUL 1700 Underwater hammer

16” and 40” Diamond Wire Cutter

Multi Function Tooling package

DATES

CLIENT/LOCATION

ROV SYSTEM

VESSEL/TASKS

March 2007-APRIL 2007

Saipem / PTTC / Gulf of Thailand

Discovery 2 (Free Flyer)

M/V DEA Surveyor/167KM 42” Pipeline Survey

June 7, 2008-July 7, 2008

CNOOC / COOEC / Liuhua Oil Field / China

Endeavor 14

(Free Flyer)

M/V Huafa / 6” and 13” Flowline and Riser Removal Project

July 9, 2008-Sept. 20, 2008

CNOOC / COOEC / Liuhua Oil Field / China

Endeavor 14

(Free Flyer)

Fugro R.O.V

(freeflyer)

M/V Huafa / 6” and 13” Flowline and Riser Removal Project

Sept. 30, 208-Oct. 19, 2008

CNOOC / Liuhua Oil Field / China

Discovery 2

(Free Flyer)

Nanhai Tiao Zhan / DFCS Support

Oct. 19, 2008-Oct. 25, 2008

CNOC / Liuhua Oil Field / China

Triton 24 and 25

(With TMS)

Nanhai Tiao Zhan / IWCP Installation

March 27, 2009-June 2, 2009

LOC / (Samho Brother Wreck) / Taiwan

Triton 22

(With TMS)

M/V Miclyn Endurance / Smaho Brother Cargo Removal Project (Benzene Removal)

July 4, 2009-August 5, 2009

PTSC / Vietnam

Triton 22

(With TMS)

M/V Miclyn Endurance / Pipe Laying 6” and 10” Pipeline

March 29, 2010-April 7, 2010

BP Vietnam / BP Lan Tay 06.1 / Vietnam

Triton 22

(With TMS)

M/V Miclyn Endurance / Choke Change

April 17, 2010-July 17, 2010

PCVL / POS Vietnam / Topaz Field Development / Vietnam

Triton 22

(With TMS)

M/V Miclyn Endurace / PISA Installation

April 17, 2010-July 17, 2010

PTSC / POVO / 12W block Development Chim Sao Field / Vietnam

Triton 22

(With TMS)

M/V Miclyn Endurnce / Transportation and Installation of WCS, WHP, Gas Export and In-Field pipelines and PLEMS.

April 17, 2010-July 17, 2010

PTSC / POVO / 12W block Development Chim Sao Field / Vietnam

Triton 22

(With TMS)

Castoro 8 / PLEM Installation

January 29,2011 – March 15, 2011

NSEC / CHEVRON / Gulf of Thailand

Endeavour 14

(Free Flyer)

DBL KII / Pipeline and Matress (Sleepers) Installation

April 19,2011 – April 27,2011

NSEC / CHEVRON / Gulf of Thailand

Triton 4

(Free Flyer)

DBL KII / Pipeline Installation and Matress

July 9,2011 – September 30, 2011

McDERMOTT / EXXON / Sakhalin Island Russia

Discovery 8 / Discovery 2

(Free Flyer)

KP1 / Pipeline Installation Including Beach Pull

March 5,2012 – May 2,2012

NSEC / PPTEP / Bongkot Field Development Project / Thailand

Endeavour 14

(Free Flyer)

DBL KII / Jacket Installation, Riser Installation, 16” Pipeline Installation, Touchdown monitoring, Spool instalation

June 11, 2012- August 03, 2012

NSEC / PPTEP / Bongkot and Arthit Field Development Project / Thailand

Endeavour 14

(Free Flyer)

DBL KII / Jacket Installation, Riser Installation, 16” and 12” Pipeline Installation, Touchdown monitoring, Spool installation

August 24,2012 – September 14,2012

TJLOC / PTSC / Bein Dong and HSTD Development Project / Vietnam

Triton 17

(With TMS)

M/V Cristina Tide / Metrology, PISA Installation, As Build Survey, As Laid Survey, Touchdown Monitoring, GVI

October 31,2012 – November 24,2012

TJLOC / PTSC / Bein Dong and HSTD Development Project / Vietnam

Triton 17

(With TMS)

M/V Cristina Tide / Metrology, PISA Installation, As Build Survey, As Laid Survey, Touchdown Monitoring, GVI

February 15, 2013 – March 29, 2013

PTTEP / SOPL / Zawtika (Myanmar)

Triton 22

(With TMS)

Castorro Otto / Jacket Installation, Under water hammering, Observing Grouting Operation, Anode and Riser and Seabed Survey

April 7, 2013 – April 23, 2013

TJLOC / HSTD Field (Vietnam)

Endeavour 14

(Free Flyer)

Castorro Otto / Debris Survey

May 6, 2013 – June 6, 2013

Pearl Oil (SEBUKU) / Makasar Straits (Indonesia)

T22

(With TMS)

Castorro Otto / Jacket Installation, Under Water Hammering, Under Water Levelling, Observing Grouting Operation, Anode & Riser & Seabed Survey

Oct. 4, 2013 –

Nov. 20, 2013

Saudi Aramco / ARBI & HASBAH Field (Saudi)

T22

(Free Flyer)

Castorro Otto / Pipeline Installation, Seabed Survey, Anode and Riser Survey

Jan. 10, 2014 – March 26, 2014

Saudi Aramco / ARBI & HASBAH Field (Saudi)

T22

(Free Flyer)

Castorro Otto / Jacket Installation (2x), Anode and Riser Survey, Seabed and Mud Mat Survey, Boat-landing Installation, Grouting Operation Support

July 20, 2014 – September 23, 2014

TNS / NSENGI / Bongkot Field (Thailand)

D7

(Free Flyer)

DBL KII / PLEM installation (including Underwater Hammering), Jacket Installation, Riser Installation, Spool and Tie-In installation support,

Dec. 16, 2014 – March 31, 2015

Saudi Aramco / ARBI & HASBAH Field (Saudi)

T22

(Free Flyer)

Castorro Otto / Jacket Installation (2x), Anode and Riser Survey, Seabed and Mud Mat Survey, Boat-landing Installation, Topside Installation, Underwater Cutting (using Diamond Wire Cutter)

May 19, 2015 – May 30, 2015

Saudi Aramco / ARBI Field (Saudi)

T22

(Free Flyer)

Castorro Otto / Jacket Installation (2x), Anode and Riser Survey, Seabed and Mud Mat Survey, Boat-landing Installation, Topside Installation,

July 12,2015 –Aug. 19,2015

Saudi Aramco / ARBI Field (Saudi)

T22

(Free Flyer)

Castorro Otto / Jacket Installation (2x), Anode and Riser Survey, Seabed and Mud Mat Survey, Boat-landing Installation, Topside Installation,

Feb.10, 2016 – March 1, 2016

Sonsub Workshop (Singapore)

Testing all the ROV for turn-over.

June 24, 2017 – July 8, 2017

PREMIER OIL/ANOA FIELD(Indonesia)

Triton 04 (with TMS)

Jack up rig TASHA / ANOA Subsea well Plug and Abandonment Project

SA10, SA13, SA14 & SA20

July 22, 2017 – August 12, 2017

PREMIER OIL/ANOA FIELD(Indonesia)

Triton 04 (with TMS)

Jack up rig TASHA / ANOA Subsea well Plug and Abandonment Project

SA10, SA13, SA14 & SA20

September 9, 2017 – October 7, 2017

PREMIER OIL/ANOA FIELD(Indonesia)

Triton 04 (with TMS)

Jack up rig TASHA / ANOA Subsea well Plug and Abandonment Project

SA10, SA13, SA14 & SA20

Feb.28, 2018 – March 30, 2018

TOTAL / YADANA FIELD(Myanmar)

Triton 04

(with TMS)

M/V Miclyn Endeavour / As-built survey of 10”, 16”,24” and (330KM) 36” Pipeline to landfall and

Jacket Inspection with CP reading

May 5, 2018 – May 26, 2018

PATRA DIMANIKA/PATERMINA

PHE NSO-A PLATFORM

(Indonesia)

Triton 22

(with TMS)

PHE-A Platform Inspection and 30” Offshore Pipeline Inspection

June 20, 2018 – July 13, 2018

FRANKLIN OFFSHORE/MESS

BERGADING FIELD (Malaysia)

Triton 04

(with TMS)

FSO Mekar Bergading Installation Project

July 30, 2018 – August 11, 2018

FRANKLIN OFFSHORE/MESS

BERGADING FIELD (Malaysia)

Triton 04

(with TMS)

FSO Mekar Bergading Installation Project

Including 6” flowline recovery

March 2, 2019 – May 2, 2019

SAPURA/ONGC

MUMBAI FIELD

(India)

Triton XLX

Umbilical, Riser, and Spool Installation

Feb. 27 – March 24, 2020

ENI/Seascape

Jinrik field ENI

(Indonesia)

Triton 17

LBL installation support, As-build survey 18”( 2x) 13.4KM Pipeline survey

TOTAL FLYING HRS OF: 828:30 HRS

CAREER SYSTEM EXPERIENCE (SHOWN IN DAYS)

System Type

Construction

Support

Pipe Lay Support

Pipeline Survey

Flow line Recovery

Recovery

Trenching

Base Maintenance

MINI ROVER

SCORPIO

ENDEVOUR

66

75

60

TRITON

541

123

55

144

6

VIPER

DISCOVERY / SCORPION

20

81

60

FLEXJET

INNOVATOR

OTHER WORKCLASS

OTHER OBS ROV

OTHER TRENCHING

DIAMOND WIRE CUTTER

30



Contact this candidate