MULTANI MOHAMMED AKIL (B.E.- Electrical)
*/**, ******** *******, ******** road, Bharuch-392001
Mobile: +91-989*******
E-mail: ***************@*****.***
Career Objective
To become a part of your renowned organization where I can grow myself as Electrical engineer and utilize my technical skills for achieving the targets and developing the best performance in organization. PROFILE
Electrical engineer with 2+ years of experience with thorough knowledge of Equipment Control System, PLC, Field Analytical electrical instruments, control systems and other systems.
Expertise in driving the Project Engineering, Erection, Installation, Commissioning, troubleshooting and maintenance operations of a wide range of instruments, equipment’s systems/machines.
Adept at conducting fault diagnosis and failure analysis to promptly overcome operational bottlenecks with demonstrated capabilities in handling the entire range of project management activities.
Highly motivated, positive and goal-oriented, with demonstrated professionalism, attention to details as well as the ability to be a good team member. Core Competencies
Project / Resource Management, commissioning, testing & trouble-shooting, Documentation management, Vendor Development, Safety Compliance, Team Management coordination, SAP documents work.
PROFESSIONAL EXPERIENCE
Graduate Apprentice Trainee (GAT) July 19 to 07/07/2020 BHARAT PETROLEUM CORPORATION LTD, Hariyala L.P.G. Plant, Kheda It is a MAHARATNA oil and gas company that function under control of government of India. The hariyala LPG plant is the first LPG bottling plant of BPCL in Gujarat. The bottling capacity of hariyala plant is 80 lakhs per year.
Electrical supervisor Jan 18 to June 19
FMC Cheminova India Ltd. Panoli, Ankleshwar
It is a MNC Company (USA based) which is globally ranking 5thposition in manufacturing agrochemical products. Its product is supplied to almost 25 countries of the world. 2
TECHNICAL SKILLS
Commissioning, operation, maintenance and fault finding of PCC, MCC, Lighting Panels.
Operation and maintenance of Transformer, circuit breaker like ACB, VCB, All type of motor.
Knowledge and experience of equipment and system in industry.
Experience with plant maintenance practice, policies and procedure.
Perform electrical engineering co-ordination in industry.
Scheduling of Preventive, Predictive & Breakdown Maintenance of plant.
Efficient Planning and Executing of Man Power for O&M Team. PROJECT ACCOMPLISHED
Implementation of SPWM Technique and design of single and three phase voltage source inverter.
Hardware implementation of SPWM inverter.
MATLAB Simulink model of SPWM inverter.
EDUCATIONAL DEVELOPMENT
B.E. in Electrical engineering (2017)
Gujarat technological university with 7.78 CGPA( 72%). PERSONAL DETAILS
Marital Status : Single
Date of Birth : 24/01/1996
Language known : English, Hindi, Gujarati
Computer knowledge : SAP, MATLAB, Computer operating system & Internet DECLARATION
I hereby declare that the above mentioned information is true to the best of my knowledge. Regards
Akil multani