Curriculum vitae
NAME: MOHAMMED JAWWAD HUSSAIN
ELECTRICAL ENGINEER, B. Tech (E.E.E)
*** QR Scanner Code to open LinkedIn profile.
REFERENCE’s –
1) Eng. Amr Aziz – Project’s Manager @ Shannon Eng. Co. (Phone - +974 / 66311369 / 44155107) Email I.d
(*.****@**********.***).
2) Eng. Hossam Mahmoud – Sr. Construction Manager @ Shannon Eng. Co. (Phone - +974 / 66895513)Email I.d (*.*******@**********.***).
3) Eng. Siyad Kasim – LuLu Project’s In charge Engineer @ LuLu Group International (Phone - +974 / 66400887) Email I.d (******@**.*******.***).
4) Eng. Sajith Edavana Aravindan – Resident Engineer @ (AEB) Arab Engineering Co. (Phone - 55868306) Email I.d (******@***-*****.***).
5) Eng. Benny – Sr. Electrical Engineer @ (AEB) Arab Engineering Co. (Phone – 70777579) Email I.d
(*****@***-*****.***).
6) Eng. Hilal Uddin – Sr. Mechanical Engineer @ (AEB) Arab Engineering Bureau Co. (Phone – 33522977 / 70020513) Email I.d (*****@***-*****.***).
7) Eng. Ibrahim Ferghany – Executive Manager @ Flame Qatar Co. (Phone - +974 / 66718552) Email I.d
(*******.*******@**********.***).
8) Eng. Jubair Ahmed – Sr. Estimation Engineer @ Insha co. / Al Sarh Holding co. (Phone - +974 / 30091598) Email I.d (******@******-*******.***)
9) Eng. Ali Azgar Shareef – Sr. Electrical Engineer @ Dar Engineering Co. (Phone - +966 / 534825254 ) Email I.d (***.*******@***-***********.***).
10) Eng. Yaqoob bin Aleem – Sr. Mechanical Engineer @ Saudi consulting services Co. (Phone - +974 / 557407738) Email I.d (***************@*****.***).
[Note: This Curriculum Vita contains a Cover letter and the main abstract]. Page 2 of 5
Cover Letter
Dear Sir/Madam,
Electrical Engineer with Twelve [12] years of
diverse experience.
I Graduated in 2005 from Jawaharlal Nehru
Technological University (J.N.T.U), Hyderabad,
INDIA with a Bachelor of Technology in
Electrical & Electronic Engineering.
During this period, I have worked as a Trainee
Electrical Engineer / Project Engineer /
Technical Engineer / Electrical coordinator /
QA/QC Electrical Engineer in India, K.S.A and
Qatar.
Experience of significant projects such as
Emergency Hospital Towers, Industrial support
facilities for O&G fields, High standard
Competitive Sports club (Al-Shamal Football
Stadium, QATAR), Environmental Laboratory
for O&G fields Electrical substations and
various other Development of Site facilities.
Why I feel suitable / preferred for this job is
because I am capable to manage a turnkey
project, sub-contractors, and system
specialists, as such my experience is wide-
ranging from the Design stage till final
Handover. I am soluble in the toughest
situations and working atmospheres and come
out with a result.
“My ability to look at any project electrical
systems with Simplicity, Efficiency, and Robust
nature to ever last”.
“My view of seeing Life and Job is by coming
out with a solution for every problem and I
strongly believe that for every problem there
is a better solution”.
I am well positioned to work effectively in MEP
sector.
Thanking you,
Mohammed Jawwad Hussain
Electrical Engineer, B.Tech.
Email: *******************@*****.***
Phone: [QATAR]-009**-********
MOHAMMED JAWWAD HUSSAIN
ELECTRICAL ENGINEER, B. Tech
(E.E.E)
MMUP / UPDA CERTIFICATION -
17027
Eligible Roles: -
1) Project Electrical Engineer
2) Technical Office Engineer
3) Electrical Engineer – Consultant
Page 3 of 5
CURRICULUMN VITAE
PERSONAL DETAIL
Name Mohammad Jawwad Hussain
D.O Birth 08-June-1982
Marital status Married
Children Three (3)
Nationality Indian
Passport No. M7318323
Date of issue 14/05/2015
Date of expiry 13/05/2025
Language known Hindi / English / Urdu.
Email *******************@*****.***
Skype ID Jawwad01237
MMUP/UPDA 17027 (EXPIRY - 27/02/2021)
Saudi Council of
Engineers 136294 (EXPIRY – 04/04/2019)
Contact info. +974-********–Qatar)
Driving License Qatar, K.S.A, India.
EDUCATION & TRAINING
Graduation B.Tech. Degree (ELECTRICAL & ELECTRONICS ENGINEERING). Intermediate (10+2) Math, Physics, and Chemistry.
S.S.C Secondary School Certified (10th standard).
Industrial Training &
Certificates
• PMI- PMP (35 Hrs. PDU Certificate) Jan-2020
• I.T.I (Industrial Training Institute) Govt. of INDIA certified in “House.
• Wiring” & Advance Diploma in Electrical Design
Engineering.
Computer skills Computer software skills MS-OFFICE, AUTOCAD. CLIENTS with whom I’ve Worked for as a main contractor: - 1) 2) M.O.H - K.S.A 3) 4)
5) 6) 7) 8)
Page 4 of 5
Job Responsibilities worked as a Project Engineer cum Coordinator: -
Represented the Electrical Engineering Department at Internal (Monthly/Weekly/Sub-contractors) technical / progress meetings and a new project - kick-off meetings.
Assisted project manager, construction manager, and planner in identifying and sequencing of scope activities, estimation of each activity duration for the preparation of baseline schedule.
Provided regular updates on validation of project scope to Project manager, construction manager as per agreed baseline.
Assisted technical team in the preparation of contract document clauses for sub-contractors.
Supported sub-contractors / specialist during equipment failures finding root cause analysis and provided recommended preventive actions.
Planned &Coordinated...
o Operational requirements and philosophies with the client and consultant representatives. o With the technical team in providing electrical technical support on strategies related to energy efficiency and sustainability.
o HVAC equipment’s / Motors / pumps / Transformers / LV / MV panels / Diesel generators arrangement layouts along with consultants prior to submission for final approval to governing authorities.
Planned & identified…
o The project risks and claimed an extension of time for delayed and newly added activities. o The HSE risks (Height works / Hot and Cold permits).
Planned, Managed & conducted…
o Workshop meetings with the team before the start of any new activity. o Value engineering in order to reduce the overall cost of the electrical systems and project materials. o Long lead equipment’s procurement and deliveries.
Developed, prepared and reviewed material submittals/method Statements of works.
Reviewed and evaluated technical documents submitted by vendors.
Reviewed and provided necessary inputs to the system specialists on the extra-low voltage interfacing drawings.
Extracted information from tender drawings and issued for construction drawings.
Interacted with manufacturers & suppliers for the availability/negotiation of prices and delivery of materials as per the correct schedule time, project specification, local and international standards.
Reviewed and developed drawings with the help of electricity governing authority’s guidelines (Kahramaa / Ooredoo / Qatar construction standards / Qatar civil defense department / NEC/ NFPA/ IEC/IEEE) … o Cable and cable tray distribution layouts for LV power / Tel-Data / Fire Alarm / BMS. o Shop drawings using auto cad software, Revit MEP and with reference to QCS standards, project specifications. o Builder work, MEP coordination drawing, equipment arrangement layouts, electrical rooms and ELV room’s layouts
(Server rooms, BMS room, Telecom rooms) with details of each service. o Lighting layouts by arranging lights with reference to the power source i.e. (Essential and Non-Essential loads) and reviewing lux level calculations submitted by a lighting specialist. o Small power layouts, developing and balancing the loads schedules, cable calculations, and panel board schedules.
Coordinated…
o And attends workshop meetings with consultant and system specialists to get approval on ELV system layouts and interface drawings.
o With the System specialist sub-contractors (System Integrators) in installation, testing & commissioning. o Construction activities with the site team for the operational readiness and quality assurance process including commissioning and start-up.
Monitored and controlled…
o The site work and validated the scope as per the baseline schedule. Acts as a whistle-blower when noticed delays in work activities.
o Vendors and sub-contractors during testing, pre-commissioning and commissioning phase.
Coordinated and Interfaced…
o Project performance and deliverables with the project manager / PMO to meet the project schedule. o With the project consultants, engineering departments, local governing authority inspectors, for works inspections, civil defense inspection, and Kahramaa inspection.
Witness…
o The installation, testing, and commissioning of electrical cables, distribution boards, sub mainboards, 11kv switchgear, dry-type transformers(1600kva), diesel generator(2000kva), CCTV system, fire alarm system, etc., o The installation, testing, and commissioning of interior and exterior dry utilities. o The work inspection on-site, wherever it is necessary and on-demand along with QC Eng. & consultants. o Attended factory acceptance tests, and site acceptance tests and during Execution sages.
Supervised, monitored and controlled the work on-site as per approved drawings, project scope, and specifications related to electrical 11kv / 415v and ELV systems.
Reviewed cost and time impact by studying the work change requests provided by the clients and subcontractors.
Prepared monthly bills for the client and approved bills raised by sub-contractors.
Raised technical queries as and when required.
Managed & reviewed contracts claims, variation orders and site instructions raised by sub-contractors.
Closing out project and handover process.
Page 5 of 5
Last working Experience.
S.no.
Present
Company I
am working
for.
COUNTRY,
City PROJECT
JOB
POSITION CLIENT
JOB
DURATION
EXP. [Years.
Month]
1
Shannon
Engineering
Co.
QATAR,
DOHA
1) LULU –
Commercial Mall,
Abu Sidra
Sr.
Electrical
Engineer
H.E.SH.
Mohammed
Bin Hamad Al
Thani
01-JULY-2017
To 20-JAN-
2020
[2.6] Years
1A
Shannon
Engineering
Co.
QATAR,
DOHA
2) Lexus
Showroom
Project and
Offices(4B+G+2)
Sr.
Electrical
Engineer
Abdullah
Abdul Ghani &
Bros. Co. Wll.
20-JAN-2018
To 02-
MARCH-2018
2 REDCO Intl.
CO.
QATAR,
DOHA
FLORESTA
TOWERS
Sr.
Electrical
Engineer –
TEMPORARY
POSITION
PEARL AZURE 10-JULY-2020
To till Date [0.1 Months
Past Experiences.
S.no
Previous
Company I’ve
worked for.
COUNTRY, City PROJECT JOB
POSITION CLIENT
JOB
DURATION
EXP.
[Years.
Month]
1
Al Fouzan
Trading &
General
Construction
Co.
K.S.A, Riyadh
1) Al Iman
Emergency
Hospital -200
Bed
Project
Electrical
Engineer
Ministry of
Health
05-Feb-2013
To 20-
APRIL-2017
[4.3]
years
2
Insha
Contracting &
Trading co.
Qatar, Ras
Laffan
3) New
Environmental
Laboratory- Ras
Laffan
Project
Electrical
Engineer
Qatar
Petroleum
18-March-
2008 To 01-
February
2012
[3.11]
2a Years
Insha
Contracting &
Trading co.
Qatar, Al -
Shamal
2) Al Khor Public
Park
Project
Electrical
Engineer
Ashghal
2b
Insha
Contracting &
Trading co.
Qatar, AL-
Khor
1) Al Shamal
Sports Club
Project
Electrical
Engineer
Qatar Olympic
Committee
3
Contracting
and
Construction
Enterprises
K.S.A,
Khursaniyah
Khursaniyah
Industrial
Support Facility
Area Lead
Engineer Saudi Aramco
11th July 2006
To June 2007
[0.11]
Months
4 Sirpur Paper
Mills Ltd.
India, Sirpur –
Kagaznagar
Rag Plant
Maintenance
Worked as
an
Apprentice
Engineer
Sirpur Paper
Mills Ltd.
23rd March
2006 To July
2006
[0.4]
Months
Total Exp. [12] Years & [00]
Months
Project's Experience - Portfolio
Profile
Eng. Jawwad M.H
Electrical Engineer, B.tech
(12) years GCC
Experience.
Project Details
Project – LuLu Commercial Mall Project, Abu Sidra, Doha-Qatar.
Project – Lexus Showroom, Doha-Qatar.
Project – Al Iman Emergency Hospital Project, 200 Beds, M.O.H, Riyadh, K.S.A.
Project – New Environmental Laboratory Project, Ras Laffan – QP, Doha-Qatar.
Project – Al Khor Public Park, Ashghal, Doha-Qatar.
Project – Al Shamal Sports Club, Qatar Olympic Committee, Doha-Qatar.
Project – Khursaniyah Industrial Support Facility, Saudi Aramco, K.S.A.
Trainee – Sirpur Paper Mill, Rag Plant Maintenance, Kaghaznagar, Telengana, India.
Project – LuLu Commercial Mall Project, Abu Sidra, Doha-Qatar.
Client – H.E. Sheikh Mohammed Bin Hammad Al
Thani.
End-User – LuLu Hypermarkets / Group International.
Main Contractor – Shannon Engineering Co
Job Duration – 01-07-2017 till 20-01-2020.
Original Contract Sum – QAR 282 Million. Total Plot Area – 127,259 sq. Mt. & Total Building Area –
(BF+GF+MF+Roof) – 91,709 Sq. Mt.
My work Scope – Main Building (fit-out –
HV/LV/CCTV/FAS/PAS/Tel-Data), Internal, External
(dry utilities), coordination with end-user and Car parking area/road works/street lighting/duct banks, etc.
Electrical Substations – 11kv / 415 volts, Substation -1
– Load – Total Connected Load – 10.64 MW and
Substation – 2 – Load – Total Connected Load – 4.64 MW. Installation & Commissioning of 1600 kva Dry-
type transformers & (3) nos. Diesel Genset-2000 KVA capacity.
Electrical Rooms – 24 nos. And Extra Low Voltage Rooms – 12 nos.CCTV server and monitoring rooms –
5 nos.
Project – Lexus Showroom, Doha-Qatar.
Client – Abdullah Abdulghani & Bros. Co.
End User – Lexus - Toyota.
Main Contractor – Shannon Engineering Co.
Job Duration – 20-01-2018 till 02-03-2018.
My Work Scope – QCDD documentation collection /
arrangment / Filing / Coordination with Consultant / Sub-contractors / Specialists / Client and End user representatives / Attending progress meetings /
attendending QCDD inspection / follow up with QCDD comments and closing.
Project – Al Iman Emergency Hospital Project, 200 Beds, M.O.H, Riyadh, K.S.A.
Client – Ministry of Health (K.S.A)
End User – Al Iman Emergency Hospital – 200 Bed.
Main Contractor – Al Fouzan Trading & General
Contracting Co.
Job Duration – 05-02-2013 till 20-04-2017.
My Work Scope – Main Building (fit out –
HV/LV/CCTV/FAS/PAS/Tel-Data), Internal, External
(dry utlitlies), coordination with end user and Car parking area / service underground tunnel (350 meters) and Car parking area / Substations (2) nos. - 13.8 kv / 380 volts / Construction of Helipad and dry utilities / Rerouting of existing underground utilities / road works
/ street lighting / duct bank etc.,
Construction of Chiller yard area complete with dry and wet utilities / Installation of switch gear and
transformers.
Project – New Environmental Laboratory Project, Ras Laffan – QP, Doha-Qatar.
Client – Qatar Petroleum, Ras Laffan
End User – QP, Environmental Laboratory team.
Main Contractor – Insha Contracting & Trading co.
Job Duration – 18-03-2008 till 01-02-2012.
My Work Scope – Main Building (fit out –
HV/LV/CCTV/FAS/PAS/Tel-Data), Internal, External
(dry utlitlies), coordination with end user and Car parking area / road works / street lighting / duct banks / coordination with QP, raising permits etc.,
Telecom underground services from Gate – 01 and
Main Telecom Building to Laboratory building.
Laying & Tapping of main power supply LV cables
from nearest substation.
Construction of chiller yard area and pump room.
Raising (hot and cold) Permit to Work.
Project – Al Khor Public Park, Ashghal, Doha-Qatar.
Client – Ashghal
End User – Ashghal, Road works Authority.
Main Contractor – Insha Contracting & Trading co.
Job Duration – 18-03-2008 till 01-02-2012.
My Work Scope - Construction and Development of public park.
Selection of Lighting fixtures / Poles etc.,
Designing and arrangment of Electrical and Lighting system on Approved Landscape layouts.
Quantity Estimation of Electrical systems.
Project – Al Khor Public Park, Ashghal, Doha-Qatar.
Client – Ashghal
End User – Ashghal, Road works Authority.
Main Contractor – Insha Contracting & Trading co.
Job Duration – 18-03-2008 till 01-02-2012.
My Work Scope - Construction and Development of public park.
Selection of Lighting fixtures / Poles etc.,
Designing and arrangment of Electrical and Lighting system on Approved Landscape layouts.
Quantity Estimation of Electrical systems.
Project – Al Shamal Sports Club, Qatar Olympic Committee, Doha- Qatar.
Client – Qatar Olumpic Committee
End User – Al Shamal Sports club.
Main Contractor – Insha Contracting & Trading co.
Job Duration – 18-03-2008 till 01-02-2012.
My Work Scope – Construction of stadium, 5000
spectators capacity. Substation – 01 no. Under ground
(Dry / wet utilities), Administration building, Staff building, Indoor stadium. Telescopic High Mast (4) nos., Practice field (2) nos. And high Mast Lights, Utilities Building.
Substaiton – Total Connected Load – 3.2 MW.
1600 kva Dry type transformers – 2 nos.
ABACUS - Telescopic High Mast Electrical and
Control Rooms.
Project – Khursaniyah Industrial Support
Facility, Saudi Aramco, K.S.A.
Client – Saudi Aramco
End User – Khursaniyah Industrial Support Facility.
Main Contractor – Contracting and Construction
Enterprises.
Job Duration – 11-07-2006 till 11-06-2007.
My Work Scope – Main Building (fit out –
HV/LV/CCTV/FAS/PAS/Tel-Data), Internal, External
(dry utlitlies), coordination with end user and Car parking area / road works / street lighting / duct banks etc. of Support Facility for O & G.
Workshop Buildings, Store Buildings, Electrical
Rooms, Installation of Low voltage switchgears, dry type transformers,
END of Projects Portfolio.
Continuing Professsionl Dsvs opmesnt:e Mohlmemesd Jlwwld Husslin SR No.
Title
(Training/Se
minar/Works
hop/ Course)
Topic
Date
(Start to Duration Venue
End)
1 Training House Wiring - Basic House wiring types and techniques.
01-July-
2004 to
30-Sep-
2004.
90 days
Industrial Training
Institute,
Hyderabad, India
2 Training AutoCAD 2d - Basic AutoCAD training
Aug-2005
to Sep-
2005 30 days Hyderabad, India.
3 Training Auto Electrician - Basic of Automobile Electricals Aug-2005
to Jan-
2006
6 months SETWIN,
Hyderabad, India
4 Seminar Holistic approach to Sustainable Design & Extra Low Voltage system design.
20-June-
2008 1day
IIEC-Institute of
Integrated
Electrical
Engineers, Qatar.
5 Seminar
Broadband Solution-Triple Play, Importance of
Short Circuit Analysis with Basic Calculation and
Building Permit Procedures (Kahramaa, Q-Tel &
Civil Defense)
01-May-
2009 1 day
IIEC-Institute of
Integrated
Electrical
Engineers, Qatar.
6 Course
Advance Diploma in Electrical Design,
Installation & Maintenance Engineering course
from
12-02-
2012 to
27-03-
2012
1 month Hyderabad, India.
7 Training /
Workshop Project Management Workshop (35 hours)
21-July-
2016to 29-
July-2016
9 days Riyadh, K.S.A
8
UPDA-MMUP
Exam
(Engineering
& Consulting
offices
accrediting
committee)
Engineering Registration Exam 28-02-
2018 1 day Doha-Qatar
9 Training /
Private Study
PMP Exam Training (using study guide by
Kim Heldman (7th Edition), PMBOK guide
(6th Edition), Ongoing Ongoing Doha-Qatar
10 Training /
Private Study LEED GA (Mock Exam guide by Gang chen). Ongoing Ongoing Doha-Qatar 11 Certificate PDUs/Contact
Hours: 1.00
Construction Management: Introduction
to Lean Construction
30-03-
2020
1 hour 2
minutes LinkedIn - Online
12 Certificate CPE/ Credit: Critical Thinking 31-03- 2020
1 hour 6
minutes LinkedIn - Online
13 Certificate On the Job Site: Construction 31-03- 2020
40
minutes LinkedIn - Online
14 Certificate Strategic Thinking 31-03-
2020 38 minutes LinkedIn - Online
15 Certificate Electrical Systems: Panel Boards,
Frequency Drives, and Transformers
01-04-
2020 29 minutes LinkedIn - Online
16 Certificate PDUs/Contact
Hours: 2.25
Construction Management: Reading
Drawings & Specifications 01-04-2020
2 hours 20
minutes LinkedIn - Online
17 Certificate Electrical Systems: Reading Drawings 01-04- 47 minutes LinkedIn - Online and Schematics 2020
18 Certificate Cert. Prep LEED GA course 05-04-
2020
2 hours 15
minutes LinkedIn – Online
19 Certificate Cert. AutoCAD Electrical Essential Training 04/10/20 5 hours 58 minutes
LinkedIn – Online
20 Certificate Cert Prep_ Revit Architecture Certified Professional
04/10/20 3 hours 29
minutes
LinkedIn – Online
21 Certificate Cert Prep_ Revit MEP Electrical Certified Professional
05/19/20 2 hours 45
minutes
LinkedIn – Online
22 Certificate Cert_ Construction Estimating Extension 04/14/20 17 minutes LinkedIn – Online 23 Certificate Cert_ Construction Estimating Takeoff 04/13/20 23 minutes LinkedIn – Online