Marciano M. Andasan
Dubai, UAE
Contact No: +971**-****-***
E-mail add: ***************@*****.***.**
WORKING EXPERIENCE:
GECO MECHANICAL AND ELECTRICAL LIMETED (SEPTEMBER 4 2016 TO January 20.2020)
Position: Electrical Engineer
Project handled:
• Burj Nahar Mall (2B +GF+2Mezzanine +4F + Roof) Commercial and Residential
Preparation of Load Scheduled Calculation, Cable Sizing Circuit Breaker Rating, Voltage Drop Calculation and Single Line Diagram as per Rules and Regulation of Government.
Preparation and Submission of Electrical Inspection and Coordinate with Consultant on time of Inspection.
Review, Analyzed the ELV Drawing with coordination to specialist prior to implementation of Low Current System. (Fire Alarm, emergency light, BMS, Structured cabling, CCTV and intercom)
Preparing details of Variations works whether negative or positive as required of consultant
Ordering of Materials as per progress of the project and taking care projecting next order of materials without breakdown the availability of materials.
Through the Supervisor and Foreman Controlling of the construction team to achieved the target date with quality.
SUN ENGINEERING AND CONTRACTING COMP. L.L.C (DECEMBER 23, 2014 TO JANUARY 28 2016)
Position: MEP Coordinator
Project handled:
• Jubail Market,(GF+GF+RF),Al Sharjah
• Manazel Al Khor,(1B+GF+6F+RF),Al Jadaf,Dubai
• Le Presidium (2B+GF+11F+RF),Dubai Silicon Oasis
Attend Coordination Meeting
MEP Works Coordination between MEP Sub Contractor, Main Contractor and Consultant
Reviewing of Project BOQ, Project Specification, Subcontract Agreement, Tender Drawing and Issue for Construction Drawing.
ENERGY FACTORS INC. (NOVEMBER 20, 2008 TO August 10,2013) Position: Project Engineer
Projects handled:
• John Gokongwei Summit Petrochemical Corp. (January 2013 to July 2013)
• Newton Hotel(Nuvali, Sta. Rosa, Laguna), December 2012
• Pinnacle( Jollibee Distribution Center), August 2011-December 2012
• Coca Cola Office (Libis, Q.C.), 2011
• ADIDAS office (Fort Bonifacio, Taguig), 2010-2011
• CHOWKING SM San Pablo City, 2010-2011
• SIEMENS (Libis, Q.C.), 2010-2011
• Celadon Park Phase1 (Ayala land), 2009-2010
Attend project coordination meetings
Supervise preparation of as-built plans, drawings and technical reports
Oversee Project Cost Estimates
Oversee Project Technical Reports
Oversee Project Personnel
Supervise electrical works
Supervise all project personnel
Supervise tools, material and equipment’s procurement
Supervise manpower deployment
Prepare project billings and look ahead construction plan
Instrumentation and Testing
Handles one or more projects
ANVIC CONSTRUCTION (PHILS.), INC. (October 5, 2003 to October 15, 2008) Position: Project in Charge
Projects handled:
• Vista De Lago, Rainbow Ridge -2, Fort Bonifacio Height
• Raya Garden Residences
• Tivoli Garden Residences (All DMCI Homes)
E.M DOMINGO ENGINEERING (June 1997 to July 1999) Position: Service Engineer/Estimator
Estimate cost of project
Supervise electrical works
Supervise tools, material and equipment’s procurement
Attend project coordination meeting
Triwerks Corporation (April 1997 to May 1997)
Position: Lead man / Electrician
Supervise electrical works
Assist on manpower deployment
TRAINING AND SEMINARS:
Boral Board and PPR Steel Framing
Boysen Paints
Moldex, Electrical and Sanitary Pipes/fittings
HILTI, Power Tools
HILTI, Fire Stop Sealant
HILTI, Anchor Bolts
DEWALTZ, Power Tools
Avenson, Wiring for FDAS
Training and seminar in High Voltage Jointer (3M)
Safety awareness in underground Cable (Dubai, UAE) Certificate in Electrical Design from ARABIAN INFO TECH SKILLS
• Computer literate: MS Word and Excel, AutoCAD LT 2012
• Building wiring and electrical controls
EDUCATIONAL ATTAINMENT:
College: Secondary: Primary:
Nueva Ecija University of
Science and Technology
(1990-1996)
Cabanatuan City, Nueva Ecija
Course: Bachelor of Science in
Electrical Engineering
Graduated
Nueva Ecija High School
(1984-1988)
Cabanatuan City, Nueva Ecija
Graduated
Lazaro Francisco Elementary
School (1978-1984)
Cabanatuan City, Nueva Ecija
Graduated