Post Job Free

Resume

Sign in

Manager Plant

Location:
Red Deer, AB, Canada
Posted:
June 22, 2020

Contact this candidate

Resume:

Terry Hart

President of Citori Production Services – Oil & Gas Processing

*** ***** ***** *** ****, Alberta 403-***-**** addztq@r.postjobfree.com

Summary of Qualifications and Skills

Production Management and Supervision

Including supervision on client’s field operations with production summaries as required

Field trips as requested by client for troubleshooting, operation training, safety investigations, preventative maintenance systems, facility turnarounds, and operating procedures.

Construction Supervision

Including design and AFE development of smaller oil batteries, pipelines, well site facilities, and small compressor plants, assist engineering with facility relocations including facility lease and P/L abandonments.

Contract Operating

Providing contract facility and well site operating services

Familiar with oil and gas facility, well site operations including compression, dehydration, plunger lifts systems oil wells and various production reporting systems (SCADA) (Zedi)

Well Inspection and Material Inventories

Perform annual inspections of shut-in wells as per Alberta Energy Regulators (A.E.R.) regulations, complete with photos, wellhead diagram, material information and painting. Acquire and supply QAQC information for abandonments and clean-up.

Education & Certification All up to date

H2S Alive

Standard first aid- Level C CPR

W.H.I.M.I.S

Transportation of Dangerous goods

Site Supervision

Confine Space Entry

Ground disturbance level IIR

Fall Protection Awareness

Hazard Assessment Training

Caliber Planning

Zedi / VT SCADA operations.

Lakeland College Petroleum Industry- Field Production Level 1 operator.

Gas Compression – 101

Computer literacy Microsoft Excel, Outlook, Critical Control software, Citrix and Avocet

Grade 12 Diploma

Insurance and WCB Available upon request.

Class 36 / Q endorsement.

Register with Comply works / CMDS

SemCams Midstream Valley View Alberta

Sour oil battery / Gas compression 3 compressor. Treater gas compressor VRU compressor Dehy contactor.

Oil Lact / Gas Lact unit / sweetener unit. Group Inlet test separators. Online VT SCADA to control facility.

2018 - 2020

Longrun Exploration Wapiti Field GP Alberta 2018 - 2018

Running compressor / field boosters/ plunger lift systems / sweet gas wells.

Quad into remote areas check RTU and TEG daily bases.

Familiar with IC-SCADA and ZEDI system / Prodview.

Bonavista Energy oil well Battery Facility 2015 - 2018

running Compressor / field boosters/ pumper units with POC systems SCADA

Look after plunger lift systems and conventional gas wells

Citori Production Services 1991 - 2014

Gas Plant Processing and Oil Well Operating Lead operator.

Operated the Penhold Process plant for 23 years Taqa North / Shining Bank Energy / Canadian Forest Oil

Pumping wells and various production reporting systems Citrix (Avocet) (Prod view).

Canadian Natural Resources – 5-19 Penhold Oil Battery Facilty 1999 – 2003

oConsists of two compressors processing 3 mcf/day. Dual oil battery facility with water injection and water flood facility. 30 pumping wells, 40 m3 of oil per day.

Canadian Forest Oil Ltd. – Penhold Processing Plant 1996 – 2014

oDuties include processing gas, (3 million MC day), two compressors, battery facility, 2 vertipeg wells and separator on location. Also, pumper units and extra gas wells on the side.

Atcor Ltd – Penhold Processing Plant (changed to Canadian Forest) 1991 – 1996

oDuties included processing gas (5 million MCF/day), two compressors and battery facility, 2 vertipeg wells, and separator on location.

Total Petroleum Ltd. – Gilby Field 1989-1991

oDuties included processing gas and field maintenance on existing wells and compressor. Plant produced 6 million MCF/day with amine system and compressor (Ajax).

Rig Manager N.W.D. – Workover and Drilling Company – North Africa, Libya 1986 – 1988

Responsible for working over and completing wells

Supervised and trained Libyan company employees

Supervised a 24-person crew, including a camp, while following specified programs which involved maintaining rig productivity

This work involved operation of heavy-duty equipment, work around high pressures and large volume pumps, introducing down hole methods, and running tools (packers, bridge plugs, etc.).

I also worked alongside cementing companies, such as Halliburton and Dowell. Title Service rig manager.

Challenger Well Service – Libya 1982 – 1985

Duties included working for company men introducing down hole methods and teaching crew safety rules and proper procedures

I was basically in charge of general rig operations, working over wells, and putting the wells back on streamline and production. Title Driller promoted to Service rig manager.

References Available Upon Request

Jim Senior Field superintendent for Taqa North 1-430-***-****

David Chaput Area Foreman for Bonavista Energy 1-403-***-****

Earl Dufield Operator Suncor Energy 1-587-***-****



Contact this candidate