SHAIKH EJAZ
ELECTRICAL ENGINEER
Exp : * year
Email : ************@*****.***
Mobile no. : +966-*********
OBJECTIVE
Seeking challenging position in Instrumentation and control system engineering with growing organization that can enable me to apply my knowledge, skills and experience in the best interests of organization to further my personal and organization goals.
EXPERIENCE
A substantial experience of about 6 years in various aspects Electrical
(Quality/Construction/Engineering/Pre-commissioning/commissioning, Loop Checking & Punch Closing ) in Petrochemicals, Oil & Gas field. EDUCATION
B.Tech (Bachelor of Technology) in Electrical Engineering RAJIV GANDHI TECHNICAL UNIVERSITY (BHOPAL MADHYAPRADESH) INDIA.
COMPUTER TRAINING SKILLS
MS-Excel,MS- word & power point
ABILITIES & SKILLS
Ability to perform the project tasks individual with flexibility at work and as a group leader to achieve the target in time applying the knowledge and good communication skills PROFESSIONAL WORK EXPERIENCE IN SAUDI ARABIA
Employer : Técnicas Reunidas (TR).
Location : HAWAYA KSA
Position : ELECTRICAL ENGINEER
Project : OIL & GAS.
Duration : Nov 2018 to DEC 2019
Job Description:
Punch-list items with PID, PROPONENT, OPERATIONS, MAINTENANCE and ensure all pending items are cleared by the contractor.
Punch list update,preparation, and closing of open punches.
Punch List- This list contains the no. of work which are not according to CLIENT Standards, which means it is not following the desired standards. This is raised by PID, OPERATION'S, PROPONENT AND MAINTENANCE to complete the work as per ARAMCO STANDARDS.
Closing process of punchlist.
i) After receiving the punches we go to our construction crew team for the rectification
ii) We will walk through for confirming whether any material is required or not. iii) If material is required then we will order the same. iv) If not then we ask the team to work on it and close the points as soon as possible.
v) After completion of the punches we will walk through ourselves first. vi) After getting the points rectified we again call the initiator to check the same.
vii) After their satisfied checking when they say its OK then we take closure sign by initiator.
viii) Update it on the server
ix) Thus we get the PMCC(Partial Mechanical Completion Certificate) only after closure of the given punches.
• Deals with reviewing of all Inspection plan, Inspection Checklist, Test Report, Method Statement & Material Approval prior for project plan preparation.
• Discuss and resolve the problems associated with measurement variables in the datasheets with the process people.
• Confirming that the Calibration of the instruments match with the specifications in the Instrument Data Sheet.
• Monitoring daily Instruments installation and testing activities and verifying that it complies with the project specification.
• Inspection for the Installation of Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Instrument Cables.
• Established field inspection and testing procedures for instrumentation works with the assistance of site project Engineers.
• Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.
• Inspection for the Installation of Trench, Cable Tray, Conduit, Duct Banks, Concrete Encasement.
• Inspection for the Field Electrical and Instrumentation cables, underground and above ground cables Installation.
• Inspection for the Insulation Resistance & Continuity Test for LV Cables, MV Cables.
• Inspection for the HI-Potential Test of MV Cables.
• Inspection for the Sheath Test of MV Cables.
• Inspection for the Cables Splicing & Termination.
• Shall accompany the client representative to carryout routine inspection and release hold points by signing and obtaining the client representative approval signature on the various Quality and Test record as proof of inspection confirming to specification.
• Shall coordinate with other discipline Quality control inspectors for ensuring that all other discipline activities that require inspection within the Electrical/Instrumentation construction program have been inspected and approved.
• Coordinate with Vendor/contractor to solve
Engineering/Construction/Quality issues.
• Reviews the Loop Folders submitted and ensure that it contains all the relevant documents.
• Organize and supervise the team assigned for the commissioning purpose.
• Organize daily meeting with clients about the daily loop checking activity.
• Preparation and update of commissioning progress reports and minutes of meeting.
• Responsible to see that the assigned job is timely completed as per the project schedule.
• Inspection for Pre-Commissioning activity for the Motor Solo Run.
• Inspection for Illumination Test, Polarity Test.
• Familiar with skin effect temperature monitoring.
• Inspection of heat tracing conduit, cable pulling, testing of cable.
• Involve in Pre Start-up Safety Review (PSSR) walk down and identify the Punch items.
Project : SAFANIYA DECKS-PLATFORMS
Company : SAIPEM (STAR YARD Co.)
Position : ELECTRICAL ENGINEER
Duration : NOV-2017 – OCT-2018
Job Description:
• Inspection of instruments installed, Junction box, cable trays, conduits and ensuring the installation is as per approved drawings & specifications.
• Involve in Pre Start-up Safety Review (PSSR) walk down and identify the Punch items.
• Inspection of meggering IR test for primary and secondary cables
• Inspection of Cable laying, glanding and termination of primary and secondary cables
• Ensuring the installation per approved drawings & specifications.
• Checked and review QA / QC Documentation.
• Inspection of the leak test
• Reviewing of vendor documents, ILD's, data sheets, P&ID, connection list etc.
• Monitoring Instruments installation and testing activities and verifying that it complies with the project specification.
• Review the loop folder s submitted by the contractor and ensure that it contains all the relevant documents.
• Review Inspection test Plan, Method of statement and quality notification documents.
• Responsible in preparing field inspection notification package and conduct site inspection with client inspector.
• Preparation of documents & drawings, material inspection & verify against specification/data sheet.
• Familiar with Punch closing.
Employer : GS Engineering & Construction Corp.
Client : PETRO RABIGH
Position : Electrical ENGINEER
Project : RABIGH Refining & Petrochemical
Duration : Aug 2015 to OCT 2017
Job Description:
• Discuss and resolve the problems associated with measurement variables in the datasheets with the process people.
• Confirming that the Calibration of the instruments match with the specifications in the Instrument Data Sheet.
• Review of P & ID, Instrument Data Sheet (IDS), Instrument Installation Sheet (IIS), Wiring Diagram, Hook up Drawings etc.
• Monitoring daily Instruments installation and testing activities and verifying that it complies with the project specification.
• Inspection for the Installation of Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Instrument Cables.
• Established field inspection and testing procedures for instrumentation works with the assistance of site project Engineers.
• Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.
• Inspection for the Field Electrical and Instrumentation cables, Underground and above ground cables and Fiber Optic Cable Installation.
• Inspection for the Fiber Optic Cable Testing And Cable Installation.
• Shall accompany the client representative to carryout routine inspection and release hold points by signing and obtaining the client representative approval signature on the various Quality and Test record as proof of inspection confirming to specification.
• Shall coordinate with other discipline Quality control inspectors for ensuring that all other discipline activities that require inspection within the Electrical/Instrumentation construction program have been inspected and approved.
• Tracking and recording of RFI’s and work progress on site.
• Coordinate with Vendor/contractor to solve
Engineering/Construction/Quality issues.
• Handle all Engineering issues on site raised verbally or in the form of Technical Query (TQ).
• Reviews the Loop Folders submitted and ensure that it contains all the relevant documents.
• Organize and supervise the team assigned for the commissioning purpose.
• Clearing and troubleshooting of various technical problems occurring during loop check.
• Organize daily meeting with clients about the daily loop checking activity.
• Arrange for work permit for works/inspections to be carried out in areas that are under commissioning.
• Coordinating with the construction department for mechanical completion
• Advising and support to the client operation team for preparation of unit for start-up.
• Preparation and update of commissioning progress reports and minutes of meeting.
• Responsible to see that the assigned job is timely completed as per the project schedule.
• Familiar with Punch closing.
Client : RELIANCE INDUSTRIES
Position : ELECTRICAL ENGINEER
Project : JIO WORLD CENTRE
Duration : JUNE 2014 To July 2015
Job Description:
• Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project plan preparation
• Inspection for the Installation of Trench, Cable Tray, Conduit, Duct Banks, Concrete Encasement.
• Inspection for the Field Electrical and Instrumentation cables, underground and above ground cables Installation.
• Inspection for the Insulation Resistance & Continuity Test for LV Cables, MV Cables.
• Inspection for the HI-Potential Test of MV Cables.
• Inspection for the Sheath Test of MV Cables.
• Inspection for the Cables Splicing & Termination.
• Shall accompany the client representative to carryout routine inspection and release hold points by signing and obtaining the client representative approval signature on the various Quality and Test record as proof of inspection confirming to specification.
• Shall coordinate with other discipline Quality control inspectors for ensuring that all other discipline activities that require inspection within the Electrical/Instrumentation construction program have been inspected and approved.
• Tracking and recording of RFI’s and work progress on site.
• Coordinate with Vendor/contractor to solve
Engineering/Construction/Quality issues.
• Organize and supervise the team assigned for the commissioning purpose.
• Arrange for work permit for works/inspections to be carried out in areas that are under commissioning.
• Coordinating with the construction department for mechanical completion
• Advising and support to the client operation team for preparation of unit for start-up.
• Preparation and update of commissioning progress reports and minutes of meeting.
• Responsible to see that the assigned job is timely completed as per the project schedule.
• Inspection for Pre-Commissioning activity for the Motor Solo Run.
• Inspection for Illumination Test, Polarity Test.
• Preparation of Energization Certificate prior to Energize.
• Familiar with Punch closing.
Personnel Details:
Marital status : Un-Married
Language Known : English, Hindi, Urdu
Gender : Male
Yours Faithfully,
SHAIKH EJAZ