Post Job Free

Resume

Sign in

Manager Project

Location:
Gautam Buddh Nagar, Uttar Pradesh, India
Posted:
June 13, 2020

Contact this candidate

Resume:

Abhishek tripathi E-mail: addsd4@r.postjobfree.com

Mob: +982*******

Worked as a Project Manager with Vodafone Idea

Overview

A Technical Project Manager with above 14 years of Experience in Telecom Domain and leading team successfully for the deployment of all technologies.

Employed with Vodafone Idea Ltd as Senior Manager (Technology-Projects).

Being an Excellent communicator leverage technical acumen to communicate effectively with teams.

Plan and manage to execute timely delivery of the Projects with effective means of cost control.

Expert in adopting new project management methodology which is effective in quick deliverables.

Skills

Project Management

Project Planning and Delivery

Vendor Management

Technical Troubleshooting

Team Building and Mentoring

Introduction of New methodology for cost saving

BOQ preparation and CAPEX planning

Project Planning and Execution

Expertise in Networking, TCP/IP,DWDM etc

Cloud Computing

Budget Planning and Deploying

4G,LTE and 5G

Analytical Skills

Mobile cellular Communications

Work Experience (I)

Since Dec 2010 – Mar 2020 Senior Manager (NWS-Projects)

Vodafone Idea Ltd

As a Project Manager my ultimate responsibility to plan and execute, all assigned projects with professional project management principles, standard practices, tools & techniques, to lead project teams and control project schedule, cost & performance to meet business expectation.

Tasks & Duties:

To Plan and Execute active roll out of RAN, Microwave and Core node in vast geography of the circle with stringent quality norms

Responsible for the deployment of new technologies, swapping and up-gradations of the existing technologies, re deployment of recovered equipment and infrastructure sharing with telecom infra providers for network roll out.

Determine and prepare project Budget/Capex requirement of each project.

Evaluation of the project plan, define mile stones, project performance metrics and information flow management for monitoring the project progress.

Regular review of the roll out progress, set timeline targets, cost and resource utilisation.

Synergise all the project team, Planning and operations and business to execute timely roll out so that the same can be converted into revenue at the earliest

Exploring/Suggesting cost effective work around solutions and new contingency plan to meet critical business requirements with minimum impact on scheduling and budget

Quality assurance of end product/services by third party audit of network roll out.

Material management includes evaluating, ordering, budgeting & tracking of material consumed, requirement and deliveries.

Vendor Management includes ensuring timely deployment of required resources, Acceptance Testing, Invoice verification, timely Invoice processing, PO closure & performance evaluation.

Responsible to implement planned number of 2G BTS’s, 3G Node-B’s & 4G e-Nodes as per schedule to generate incremental revenue by sales and to improve Network CXX.

To improve NW Availability/Quality by acquiring and deployment of In-building solutions (IBS)/ COW’s at critical business locations, to boost network quality.

Implementation of MW Traffic Nodes, SDH & XPIC links to provide bandwidth to new and existing nodes.

Dismantling, reverse logistic and redeployment of existing MW links as per plan with minimum maximum utilization of recovered material.

Ensure deployment of Core nodes, BSCs, RNCs, VGW with zero/minimum deviation and ensure smooth handovers to operations and meet financial & planning expectations.

Prioritize the deployment of Nodes based on the traffic projections and the capacity augmentation requirements, to avoid congestion and revenue loss.

Management & timely monitoring of CAPEX to maximum utilization of approved CAPEX and ensure maximum conversion to indents and POs and avoid Blockage of funds resulting in Savings and support business revenues.

Ensure Timely liquidation of available Inventory considering constraints of Warehouse Space and Ageing Parameters of Commercial.

Synchronize and alignment of Deliveries of Various equipment from different suppliers, for maximum utilization of resources.

Ensure reconciliation, verification and record keeping of ASSESSTS ORDERED V/S deployed, dismantled, handed-over, in-transit, stored in different WH & different locations.

Develop local vendors for implementation services and accessories supplies to reduce the CAPEX cost, and ensure OEM Quality standards should be maintained.

Conduct trainings to local vendors, to increase the no. of skilled teams to expedite the roll-outs.

Work Experience (II)

Since May 2008 to DEC 2010 BSS Engineer (TSD-Projects).

Huawei Telecommunications (India) Co Pvt Ltd

Tasks & Duties:

Responsible for the Installation, Commissioning and troubleshooting of the Huawei BSC 6000, Huawei BTS 3012_II,BTS 3900,BTS 3900A and 3006 BTS. Solving customer issues related to newly launched network.

Presently working on TATA 3 G project for the roll out of RNC and Node B.

Handling E-1 patching for the upcoming sites, expansion of site with additional BTS, TRX etc and configuring alarms and calibration according to the NMS people.

Making changes in the project as per the issues associated along with the directions from the customer and Route Plan for the teams.

Planning and Management of the project. Track and check the progress of the project.

Quality audits on sites

Software downloading and up-gradation in BSC.

Taking OMC-R / Network Backups

Work Experience (III)

September 2007 to April 2008 BSC engineer

ZTE India PVT Ltd

Tasks & Duties:

Responsible for the Installation, Commissioning and troubleshooting of the ZTE BSC and BTS.

Alarm monitoring and troubleshooting, of all internal and external alarms of BSS network.

Taking OMC-R / Network Backups.

Software downloading and up-gradation in BSC.

Swapping of the BTS from Motorolo to ZTE BTS.

Making changes in the project as per the issues associated along with the directions from the customer and Route Plan for the teams.

Planning and Management of the project. Track and check the progress of the project.

Worked on the ERICSSON AXE platform.

Taking alarm logs, notification logs and export.

Work Experience (IV)

July 2006 to September 2007

Ericsson India Pvt Ltd

Tasks & Duties:

Responsible for the Installation, Commissioning and troubleshooting of the Ericsson BTS and Transmission Equipments.

Responsible for the Installation, Commissioning of Ericsson RBS 2206,Ericsson mini link with Classic Node and Traffic Node.

Handling E-1 patching for the upcoming sites, expansion of site with additional BTS, TRX etc and configuring alarms and calibration of the sites.

Making changes in the project as per the issues associated along with the directions from the customer and Route Plan for the teams.

Involvement in Planning and Management of the project. Track and check the progress of the project.

Work Experience (V)

Dec 2004 to June 2006

Four Pillar Ltd

Tasks & Duties:

Responsible for the Installation, Commissioning and troubleshooting of the BTS and Transmission Equipments.

Responsible for the Installation, Commissioning of Ericsson RBS 2206,Ericsson mini link with Classic Node and Traffic Node.

Making changes in the project as per the issues associated along with the directions from the customer and Route Plan for the teams.

Involvement in Planning and Management of the project. Track and check the progress of the project.

Academic Credentials

BE (Electronics & Telecommunication Engineering) from Uttar Pradesh Technical University, Lucknow in 2004.

Intermediate (10+2) from U.P. Board in 1999.

High School (10) from ICSE Board in 1997.

Technical Skills

Operating Systems : DOS, Win 9X / 2000 Family.

Hardware : Intel Compatible PC’s

Professional Courses

Undergone Training for Huawei BTS 3012 and BSC-6000.

Attended Huawei MSC Certification Training for Huawei Soft Switch (MSOFTx3000) and Media Gateway (UMG8900) at Huawei-Gurgaon.

Personal Profile

Date of Birth : 15 July 1981.

Passport Details : NA

Languages Known : Hindi, English.

Address : A 255 sector beta one greater Noida



Contact this candidate