R. MURALI
995-***-**** : addpmw@r.postjobfree.com
SENIOR PIPING DESIGNER
A position as Piping Designer 13 years of Experience in FEED, Pre-FEED, Design & Detail Engineering of Varies Oil and Gas Offshore & Onshore, Petrochemical projects.
Key Areas of Expertise
Piping Layouts & 3D Modeling Pipe Rack Routing Fabrication Isometrics Support Detailing Safety System Vendor Drawings Review Internal Department Co-ordinate Site Co-ordinate Software Exposure
PDMS 12.1 sp4.44 E3D 2.10 Auto CAD 2019 Auto Plant Micro station V8i SP3D 2016 (11.0)
Educational Summary:
B. Tech (PT) - SRM Institute of Technology, SRM University, Chennai, Dec. 2012, 84%.
Diploma in Mechanical Engg. – M.A.P College, Kanchipuram, April 2007, 81.7%.
12th Standard – Govt. Higher Secondary School, Karuguzhi, April 2004, 76%.
10th Standard – Govt. Higher Secondary School, Karuguzhi, April 2002, 68%.
Professional Experience:
Ramboll India Pvt Ltd Chennai.
Senior Piping Designer Nov 2019 to Till Date
Project Accomplish - AL SHAHEEN FIELD DBN PWM A and B locations
Produced Water Management FEED
Client – North Oil Company
Job Responsibility:
FEED phase are Design and Adequacy check of effected equipment / structures for the modifications required at A & B Locations for Produced Water Management (PWM – A&B), Reid Vapor Pressure (RVP – A&B) and Outboard Slots (OBS – A), denominate the DBN PWM PROJECT.
The objective of DBN PWM FEED is to conduct all required engineering design & analysis, safety studies and 3D Modelling for the required modifications before the EPCIC phase.
Plot Plan, Equipment Layout & Piping Layout Involved For X-Mas Tree Orientation, Lower Deck, Below Lower Deck, Main Deck, Mezzanine Deck, Cellar Deck.
Project Accomplish - MP-623 PRODUCED WATER PIPING CHANGE -OUT SOUTH ARNE CENTRAL
Client - HESS DENMARK ApS, Denmark.
Job Responsibility: - Piping Isometrics for Booster Pumps
Project Accomplish - Maydan Mahzam (PS2) Re-Development and Bul Hanine (PS3)
Life Extension project Pre-FEED
Client - Qatar Petroleum
Consultant – Wood, United Kingdom.
Job Responsibility: -
Plot Plan, Equipment Layout & Piping Layout Involved For X-Mas Tree Orientation, Lower Deck, Below Lower Deck, Main Deck, Mezzanine Deck, Cellar Deck, Bridge Between BH-E07B & BH-SA AREA (WHJ, MM-07A, MM-G08B, BE- 07A, BH-07B AND BH-SA).
Project Accomplish - EPIC FOR AUTOMATION UPGRADE FOR NGL STORAGE AND LOADING FACILITIES
Client - Qatar Petroleum
Consultant – Fernas Construction Company Incorporated
Job Responsibility: -
Overall Plot Plan, Piping Layout Involved Butane, Gasoline, Naphtha, Propane Storage Tanks area & Butane, Gasoline, Naphtha, Propane Loading Arm in Jetty area.
Enoia Babcock Borosig Pvt Ltd (Future Pipe Group) Chennai.
Senior Piping Designer June 2015 to Nov 2019
Project Accomplish: CASSIA COMPRESSION PROJECT.
Client: McDermott Inc, USA.
Project Accomplish: LIWA Plastics Project
Client: CB&I CTCI- Oman.
Project Accomplish: P-0212 Lower Fars Heavy Oil Development
Client: Aquatech - UAE.
Project Accomplish: GATHERING CENTER -17,27&25.
Client: ARABI ENERTECH KSC
Job Responsibility:
Preparation/checking of piping layout, Isometrics, Shop floor drawings, Bill of material.
Stress Implementation updated Isometrics drawings and pipe support drawings.
Study and review of Piping Routing supports and its Feasibility.
Petro6 Engg and Construction Pvt. Ltd., Chennai
Piping Designer Sep 2014 to May 2015
Project Accomplish: MADURA STRAIT BD FIELD DEVELOPMENT (FPSO - Offshore) KRAKEN FPSO - Offshore.
Client: HUSKY-CNOOC MADURA LTD - BUMIARMADA, Indonesia.
KRAKEN FPSO - BUMIARMADA, North Sea.
Job Responsibility:
Preparation of Piping Layouts based on P&ID, Plot plan, Equipment drawings involved area Well Head Plate Forms, Flare, KOD, Crude oil Separation, Condensate Stabilization Gas Recompression, Produced Water, Sour Water Striper, HP MP LP Separator, Stabilizer Column, Power Generation area.
Preparation of Nozzle orientation drawings for Co-ordination with client and interdisciplinary departments.
Review of Vendor Documents and drawings.
Arrangement of Pipe Rack Piping
Preparation/checking Piping Isometrics & BOM
Project Accomplish: SATELLITE OIL FIELD DEVELOPMENT PROJECT – Phase-2 (Onshore) (SARASWATI, NI3, NI2, NE, WP1, WP14, GUDA Field)
Client: Cairn Energy India Pvt., Ltd (CEIL), India.
Job Responsibility:
Preparation & Checking of Piping Layout, Isometric and pipe support drawings.
Study and review of Piping Routing supports and its Feasibility.
Co-ordination with client and interdisciplinary departments.
Review of Vendor Documents and drawings.
Site visit to provide support for Client during Construction.
Project Accomplish: PROVISION OF DETAIL ENGINEERING SERVICES FOR MODIFICATION OF TR-1 & TR-2 CONDENSATE STABILIZATION SYSTEMS FOR YETAGUN PLATFORM (Offshore)
Client: Thai Nippon Steel Engineering & Construction Corp. Ltd.
Job Responsibility:
Involves study of existing piping tie-in lines, lines to be installed from tie-in to the newly installed Vapor KOD & Closed Drain system.
Preparation/checking of isometric drawing.
Preparation/checking of support Detail.
Project Accomplish: PROVISION OF DETAIL ENGINEERING SERVICES FOR FIRE WATER SYSTEM & FIRE FIGHTING SYSTEM FOR CRUDE OIL STORAGE TANK AREA (Onshore)
Client: Saipem India Ltd Client: ONGC Engineering Group India Ltd
Job Responsibility:
Preparation/checking of Piping Layout Isometrics and pipe support drawings.
Armstrong International Pvt. Ltd, Chennai / Piping Design Engineer / Oct 2011 to Sep 2014
Project Accomplish: PROVISION OF DETAIL ENGINEERING & RE ENGINEERING STEAM AND UTILITIES SYSTEM, CONDENSATE AND FLASH STEAM RECOVERY SYSTEM.
Client:
Condensate Recovery system for ENI S.P.A ROBASSOMERO – France.
Steam and Utilities system for Total carling petrochemical refinery – France.
Flash steam & Condensate Recovery system for Arikma jerry refinery – France.
Steam and Utilities system for IPLOM refinery – France.
Flash steam & Condensate Recovery for Reliance refinery – Jam Nagar India.
Job Responsibility:
Involves study of existing piping tie-in lines, lines to be installed from tie-in to the newly installed Steam & Utilities system. Using Auto Plant 3D Preparation & Checking of Piping Layout, Isometric and pipe support drawings based on P&ID, Equipment layouts, Equipment Data sheets, civil / structural drawings, piping material specification.
BGR Energy System Ltd. Chennai / Piping Designer / Dec 2010 to Oct 2011
Project Accomplish:
PROVISION OF DETAIL ENGINEERING SERVICES FOR TURBINE HOUSE CPU UNIT
2x660MW Power Generation Plant, Adani Power Ltd, M.H & R.J India.
1x500MW Power Generation Plant, Gujarat State Electricity co, Ltd, Ukai India.
Job Responsibility:
Preparation of Equipment Layouts based on P&ID, Plot plan, Equipment drawings.
Preparation of Isometric and pipe support drawings.
Extraction of Piping GADs drawings from Auto Plant 3D
Extraction of Isometric shop fabrication drawings from Auto Plant 3D
Extraction of Piping & Support Material Take-off from Auto Plant 3D.
Hindustan Dorr Oliver Ltd., Chennai / Piping Design Engineer / Sep 2007 to Oct 2010
Project Accomplish: PROVISION OF DETAIL ENGINEERING
Client:
1. Integrated Effluent Treatment Plant for IISCO, Burnpur India.
2. Integrated Effluent Treatment Plant for HPCL – Mittal energy Ltd, Bhatinda India.
3. Lime Handling System for Utkal Alumina Refinery International Ltd, Orissa India.
4. Effluent Treatment Plant –IV for BPCL Refinery, Cochin India.
Job Responsibility:
Preparation of Equipment Layouts based on P&ID, Plot plan, Equipment drawings.
Preparation of Isometric and pipe support drawings.
Co-ordination with client and interdisciplinary departments.
Extraction of Piping GADs drawings from Auto Plant 3D
Extraction of Isometric shop fabrication drawings from Auto Plant 3D
Extraction of Piping & Support Material Take-off from Auto Plant 3D.
Personal Details:
Name : MURALI.R
Date of Birth : 14th May 1987
Marital Status : Married
Language Known : Tamil, English, Hindi
Nationality : Indian
Present Address : 5/3 Krishna Illam
Saiva Muthaiyah 1st Street,
Royapettah, Chennai - 600014.
Passport Number : T5945959-Type-P, Valid upto-08-05-2029
Employment Status : Full time
Date: R.MURALI