Avis Meir P. Lehayan
Electrical Engineer
Mobile : 050-*******/ 056-*******
E-mail : ************@*****.***
C A R E E R O B J E C T I V E
To secure a position that offers training in technical skills, with particular emphasis on the production, optimizing professional and personal growth in preparation for the future advancement to top management. PROFESSIONAL HISTORY:
17+ years experience with proven work exposure in engineering, site supervision and construction. Strong back ground and proficient experience working in large scale projects. WORK EXPERIENCE:
QA/QC Engineer Abu Dhabi Mid-Field Terminal Project TAV CONSTRUCTION
June 2017 – April 2020
Responsibilities include:
• Prepare all site reports for site progress
• Attends to meeting for site progress and targeted date plans
• Coordinate with the main consultants and project manager regarding quality and progress of works.
• Conduct initial inspection prior to final inspection of the main consultant for approval.
• Ensuring that all materials and equipment delivered on site is properly documented and inspected and approved as per project specifications prior to installation at site.
• Monitor actual installation during progress work and ensure the good quality and standard
• Going along with consultant during inspection for any clarifications and coordinating to supervisors if immediate rectification is required
• Checks all SCR’s (site clarification requests) and implementing it to site and informing to concerned supervisor
• Studies and assist site execution team for work rectification required in closing NCR’s (non-conformance reports)
• Put into record any non-conforming material and make sure that such items have been raised on NCR
(Non-Conformance Report).
QA/QC Engineer Dubai Mall Fashion Avenue Expansion BK Gulf LLC
May 2015 – May 2017
Dubai International Airport Concourse 4
BK Gulf LLC
Nov 2014 – Apr 2015
Responsibilities include:
• Coordinate with the main consultants and project manager regarding quality and progress of works,
• Conduct initial inspection prior to final inspection of the main consultant for approval.
• Ensuring that all materials and equipment delivered on site is properly documented and inspected and approved as per project specifications prior to installation at site.
• Monitor actual installation during progress work and ensure the good quality and standard
• Put into record any non-conforming material and make sure that such items have been raised on NCR
(Non-Conformance Report).
• Witness & Conduct Testing and Commissioning of Electrical System QA/QC Engineer DRC/ Pepsi Plant Dubai Investment Park 2 Albonian International LLC
Nov 2013 – Oct 2014
Abu Dhabi National Oil Company Housing Package 11
Albonian International LLC
Oct 2012 – Nov 2013
Responsibilities include:
• Coordinate with the main consultants and project manager regarding quality and progress of works,
• Conduct initial inspection prior to final inspection of the main consultant for approval.
• Ensuring that all materials and equipment delivered on site is properly documented and inspected and approved as per project specifications prior to installation at site.
• Monitor actual installation during progress work and ensure the good quality and standard
• Put into record any non-conforming material and make sure that such items have been raised on NCR
(Non-Conformance Report).
• Witness & Conduct Testing and Commissioning of Electrical System and Mechanical System. QA/QC Engineer (MEP) Dubai Metro Project
Obayashi Corporation (DUBAI, U.A.E.)
June 2008 – Sept 2012
Responsibilities include:
• Coordinate with the main consultants and project manager regarding quality and progress of works,
• Conduct initial inspection prior to final inspection of the main consultant for approval.
• Ensuring that all materials and equipment delivered on site is properly documented and inspected and approved as per project specifications prior to installation at site.
• Monitor actual installation during progress work and ensure the good quality and standard
• Put into record any non-conforming material and make sure that such items have been raised on NCR
(Non-Conformance Report).
• Witness & Conduct Testing and Commissioning of Electrical System and Mechanical System. Site Engineer Residences (Villas and Buildings)
Emjen Electromechanical & Contracting LLC, Dubai, UAE November 2007 – May 2008
Responsibilities include:
• Conduct daily site supervision and coordination with client and sub-contractors.
• Ensure Quality Control, and Quality Assurance of installed equipments before and after installation,
• Inspection of installed equipments according to specifications and code requirements,
• Making quotations for the Bill of Quantities to be submitted to client,
• Electrical plan checking for coordination, accuracy, and consistency,
• Prepare technical report on a daily work activities and accomplishments to Construction Engineer. Facilities Engineer Commercial and Residential Buildings Oakridge Realty Development Corp., Cebu City, Philippines Dec 2006 – Oct 2007
Responsibilities include:
• Continuously improve the reliability and efficiency of utility systems that are essential to reducing overall operating costs. Responsible to identify and drive continuous improvement projects.
• Troubleshoot and correct problems with existing plant utility equipment and associated control systems
• Work with the Project Manager as the primary interface with outside engineering consulting firms on design issues, and interpretation of Owner program and project requirements.
• Provide support, advice and guidance to the Project Team to produce quality projects that meet the program requirements on time.
• Provide cost estimates and program of works for the projects
• (BMS) Assist with the design of facility and infrastructure projects for the uninterrupted supply of essential utilities necessary to support the Secondary Manufacturing operations, Electrical Engineer Waterworks Department (Government) San Carlos City, Philippines
Sept 2002 – Nov 2006
Responsibilities include:
• Perform a variety of skilled tasks in the preventative maintenance, repair, installation, and calibration of electrical, electronic, telephone, pneumatic; radio, telemetry, and instrumentation equipment and analyzers; install, troubleshoot, repair, and maintain instruments and control systems to assist in the monitoring and control of plant and pumping station processes;
• Assists in the development, construction, and installation of new electrical systems and maintenance, repair or replacement of electrical equipment; maintain electrical transformers, diesel generators, solar systems, and medium voltage distribution and control systems.
• Develop field sketches and update record drawings of electrical systems; supervise and train less experienced personnel
• Prepare technical reports as required; perform related assignments as necessary
• Lead in the construction of new Pumping Stations, Well Testing, and Installation of new submersible pumps, preventive maintenance and repair of pumps and other equipments in the station.
• Lead in the installation of the Transmission Line. EDUCATIONAL ATTAINMENT:
1995 – 2001 Bachelor of Science in Electrical Engineering Silliman University, Dumaguete City, Negros Oriental, Philippines Skills and Competency:
• Can interpret electrical drawings
• Computer Literacy - Ms Word, Power Point, MS Excel, Auto Cad
• Knowledge in DEWA and ADDC Rules and Regulation
• Site / Field Supervision/ Inspector
• Knowledge in Aconex, Zutec, Dashboard, Proliance software
• Computer Literacy
• MS Office (Excel, Words, Outlook)
• Estimation for Electrical
• Basic Electrical Design using Autodesk AutoCAD
• Welling to be trained and learned things that can enhance my skills and abilities SEMINARS / TRAININGS ATTENDED:
Project Management Professional Training
Cambridge Educational Institute (PMI Certified)-Dubai Bus way Basics
Introduction to Bus ways system & safety
Sephil Training Center, June 15, 2007
Orientation on Installation & Metering Scheme & Standards of VECO, OBO Standards for Electrical applications & Electrical Hazards & Safety Institute of Integrated Electrical Engineers of the Philippines February 10, 2007
AutoCAD 2D & 3D
AutoCAD design training for 2D & 3D
Microbags Computer Learning Center, January 18, 2007- March 29, 2007 Indoor/Outdoor Lighting Design/ National Electric Code 2002/ Voltage Drop Calculation/ Energy Engineering (SCADA Application), Silliman University, Dumaguete, Philippines
Short Circuit Study and Calculation (IEEE Data)/ Protective Engineering/ Value Engineering/ Emergency Generator/ Fuse and Circuit Breaker Selection, Silliman University, Dumaguete, Philippines
PERSONAL DETAILS:
Date of Birth: June 09, 1978
Nationality: Filipino
Marital Status: Married
Passport No.: P1284836A
Visa Status: Employment Visa
Driver’s License: 741363