Post Job Free
Sign in

Engineer Site

Location:
Riyadh, Saudi Arabia
Salary:
Negotiable
Posted:
June 07, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Post Applied for: -- Sr.Quantity Surveyor/QS

Md.Fahimuddin Ansari

Moh.:-Qilaghat Wazidpur

Pathantili

Dist.:- Darbhanga

State :- Bihar

Pin:- 846004

Mobile - +966-*********

SKYPE ID :- fahim8120

Email: - addnvv@r.postjobfree.com.

addnvv@r.postjobfree.com

TECHNICAL QUALIFICATION

1. B.A. Honours L.N.Mithila University Bihar in 2003.

2. B-Tech. (Civil) from J R N Rajasthan Vidyapeeth University,

Udaipur, Rajasthan in June 2011.

Career Objectives & Motives:

To take up greater responsibilities which will enable me to use my abilities in full and in the due course learns more and adds to my skills. Expertise in Quantity Survey, Billing and Maintenance of Measurement books.

To establish an initial construction budget and estimate construction costs before expensive design development time has been undertaken.

To ensure the most cost effective design solution.

To monitor costs during the design, development and construction stages and take action to keep costs under control.

To ensure that fully detailed tender documentation, including proposed construction contracts are prepared to minimize risks to the Employer from variations and contractual claims.

To ensure that tenders are obtained under the optimum conditions of competition.

To give contractors the assurance that cost management will be carried out in an equitable manner; the confidence that a Quantity Surveyor is employed on the project allows tendering contractors to be more competitive.

KEY QUALIFICATION:

I am B. Tech. in Civil Engineering and working as Quantity Surveyor with more than 16 year in construction companies.

In my responsibilities include Billing & Variation clams, Cost control related to Civil & Mechanical Etc. Client Billing, Sub Contractor Billing, Preparation of BOQ, Bill of Materials, and Estimation Quantity take off, Progress Reports Daily, and Weekly & Monthly Basis. Project type: Infrastructure (Road-Expressway, National Highway, State Highway, Local Road Drainage Project, Railway and Airport) and all type of Structure i.e. Major Bridge, Minor Bridge, Under pass, Rail Over Bridge, Fly-Over Bridge, RCC Box Culvert and Pipe Culverts etc., cash flow statement, Rate analysis, preparation of Monthly progress report, work program resource scheduling.

I have responsible for modification of plan and profile drawing as per site requirement, computation of co-ordinate from given DPR drawing, calculation of FRL, preparation of structure layout drawing, cross section and longitudinal drawings, Tilt and Shift calculation of Well, preparation of shop drawing of structure, Bar Bending schedule.

KEY STRENGTH:

Quality of motivating others, Team work, dedicated, hard working, sincere, Honest, with good communicating skill possessing great amount of patience with positive thinking, believing in doing best to achieve best in life & ability to deliver the good with punctuality.

Detailed Task Assigned:

Preparation of IPA as per Contract.

Quantity Estimation.

Variation Order Preparation.

BOQ Review & BOQ Preparation.

Conduct Rate Analysis (w.r.t. Schedule of Rate & Standard Data Book).

Prepare Subcontracts evaluation statement and contractual claims.

Preparing Physical & Financial progress (cash flow statements)

Monthly Reconciliation of Material (Major).

Material Scheduling as per Planning.

Preparation of Cross Section & Longitudinal Section.

Supervising the reinforcement detailing work and preparation of Bar Bending Schedule. (IS 2502)

Modifying survey data in case any modifications is required in the design during Execution.

Horizontal and Vertical Curves Calculations. (IRC SP-23)

Toe Calculation for Embankment.

Tilt & Shift Calculation of Well.

Deal with consultant for drawings and other contractual matter with respect to MoR&TH, CoPA & FIDIC clauses.

Maintaining Progress Detail w.r.t to Bar Chart (Highway & Structure) correlates with

IPC, discuss with site Engineer, regarding progress and provide suggestion and data for better progress.

Preparing Monthly & Daily Progress Report

Maintain record in proper and easy way

Layout preparation of Structure.

Centerline Co-Ordinate calculation from Soft Copy of Alignment Drawing.

As Built Drawing Preparation.

Cross Section

Structure Drawing

Employment Record:

PRESENT STATUS

3) -Working Period : 23 May - 2019 to 10 Till Date

Organization : UNITED MAINTENANCE CONTRACTING Ltd.

P.O. BOX NO. 7429

RIYADH - 11462

KINGDOM OF SAUDI ARABIA

Position held : Sr. Quantity Surveyor

Name of Work : Ten lining of Road Project Riyadh Saudi Arabia

Client : Riyadh Municipalty, (AMANA)

Consultant : Euro Consult Ltd.

Project Cost : 161 Million SR.

Project Description:

It's a AMANAH project, the main feature of the road cross-section of this 6 km is, it has 4 types of typical cross sections, it is 10 lanning project consist of sub grade 300mm thick in two layer, Sub-Base- 200 mm thick in two layers, 70mm thick Asphalt bituminous work and 50mm thick Wearing Coarse provided at the top of the layer. It consist of 6 Nos major intersection, Six Lane Main Road Both Side and four Lane Service Road both side, 91 Nos High Mast Ple 20M Height in median portion and 406 Decorated Light Pole both side with Service road 6M Height, Two Electric Sub-Station, Two Separator both side with main road and cover with Interlock Block, four type of curb stone, Irrigation work with Plantation (Shade Tree & Palm Trees) Shade tree with Walk way only and Palm Trees and shade Trees in Median portion, sewage work in median and both side of walk way portion, 2 Flyover & 3 Underpass.

Description of Duties:

As a Sr.Quantity Surveyor I am responsible for.

Invoice preparation and certify it from Consultant.

Responsible for Preparation of the bill and follow up the bill.

Responsible for preparation of details of follow up works and getting approval from consultant.

Preparation of Road Longitudinal Sections and Cross Sections with the help of Auto Plotter & CalQuan.

Variation Preparation & BoQ Review.

Preparation of working drawings for Structures Bar Bending Schedule

Preparation of road estimate.

Tracking the project schedules.

Preparing a comparisons statement.

Preparing comparisons statement for the tender.

Coordinating with Design & Construction team.

Maintain the vendor records.

Rate analysis of extra items.

Conduct Rate Analysis (w.r.t. Schedule of Rate & Standard Data Book).

Monthly Reconciliation of Material (Major).

Physical & Financial progress (cash flow statements)

Prepare Subcontracts evaluation statement and contractual claims

Calculating quantity for bill & cross check of measurement sheet provided by site engineer.

Material reconciliation & Material scheduling

Preparing work program for execution of work.

Studding Typical Drawing and preparing data for site work.

Preparation of daily progress reports & monthly progress reports,& maintaining Bar Chart

Horizontal and Vertical Curves Calculations.

Modification of plan and profile of highway as per site requirement.

Calculating centerline co-ordinate and curve co-ordinates.

Calculation of toe edges for Embankment and Earthwork excavations.

Preparation full documentation proper way.

2) -Working Period : 18 June - 2018 to 22 May - 2019

Organization : Indian Engineering Consultants India Pvt. Ltd.

Position held : Quantity Surveyor

Name of Work : Supervision of Four-lanning of existing Maharastra / Goa Border –

Panaji Goa Section of NH-17 from Km 475.000 to Km 500.500(Existing

Km. 502.500) in the state of Goa on EPC basis under NHDP-III (Patradevi

to Karaswada Junction section).

Client : National Highway Authority of India

Contractor : Navayuga Engineering Company Ltd.

Project Cost : 444.5146 CRORES

Description of Duties:

As a Sr.Quantity Surveyor I am responsible for.

Invoice preparation and certify it from Approved RFI/Work done after site verification .

Responsible for Preparation of the bill and follow up the bill.

Responsible for preparation of details of follow up works and getting approval from our TL.

Preparation of Road Longitudinal Sections and Cross Sections with the help of Auto Plotter & CalQuan.

Variation Preparation & BoQ Review.

Preparation of working drawings for Structures Bar Bending Schedule

Preparation of road estimate.

Tracking the project schedules.

Preparing a comparisons statement.

Preparing comparisons statement for the tender.

Coordinating with Design & Construction team.

Maintain the vendor records.

Rate analysis of extra items.

Conduct Rate Analysis (w.r.t. Schedule of Rate & Standard Data Book).

Monthly Reconciliation of Material (Major).

Physical & Financial progress (cash flow statements)

Calculating quantity for bill & cross check of measurement sheet provided by our field engineer.

Material reconciliation & Material scheduling

Preparing work program for execution of work.

Studding Typical Drawing and preparing data for site work.

Preparation of daily progress reports & monthly progress reports,& maintaining Bar Chart

Horizontal and Vertical Curves Calculations.

Modification of plan and profile of highway as per site requirement.

Calculating centerline co-ordinate and curve co-ordinates.

Calculation of toe edges for Embankment and Earthwork excavations.

Preparation full documentation proper way.

3) -Working Period : 25 July - 2017 to 15 June - 2018

Organization : Madhucon Projects Ltd.

NH-19, CHHAPRA-HAJIPUR SITE

Bihar

Position held : Sr.Quantity Surveyor

Name of Work : Four Laning of Chhapra - Hajipur Section of NH-19 from

Km 143.200 to 207.200 in the State of Bihar under NHDP

Phase III on Design, Build, Finance, Operate and Transfer

(The “DBFOT”) Annuity Basis

Client : National Highway Authority of India

Concessionaire : Chhapra-Hajipur Expressway Limited

Independent Consultant : Stanley Consultants INC

Project Cost : 990 CRORES .

Description of Duties:

As a Sr.Quantity Surveyor I am responsible for.

Invoice preparation and certify it from Consultant.

Responsible for Preparation of the bill and follow up the bill.

Responsible for preparation of details of follow up works and getting approval from consultant.

Preparation of Road Longitudinal Sections and Cross Sections with the help of Auto Plotter & CalQuan.

Variation Preparation & BoQ Review.

Preparation of working drawings for Structures Bar Bending Schedule

Preparation of road estimate.

Tracking the project schedules.

Preparing a comparisons statement.

Preparing comparisons statement for the tender.

Coordinating with Design & Construction team.

Maintain the vendor records.

Rate analysis of extra items.

Conduct Rate Analysis (w.r.t. Schedule of Rate & Standard Data Book).

Monthly Reconciliation of Material (Major).

Physical & Financial progress (cash flow statements)

Prepare Subcontracts evaluation statement and contractual claims

Calculating quantity for bill & cross check of measurement sheet provided by site engineer.

Material reconciliation & Material scheduling

Preparing work program for execution of work.

Studding Typical Drawing and preparing data for site work.

Preparation of daily progress reports & monthly progress reports,& maintaining Bar Chart

Horizontal and Vertical Curves Calculations.

Modification of plan and profile of highway as per site requirement.

Calculating centerline co-ordinate and curve co-ordinates.

Calculation of toe edges for Embankment and Earthwork excavations.

Preparation full documentation proper way.

4) -Working Period : 23 December - 2014 to 10 July-2017

Organization : UNITED MAINTENANCE CONTRACTING Ltd.

P.O. BOX NO. 7429

RIYADH - 11462

KINGDOM OF SAUDI ARABIA

Position held : Quantity Surveyor

Name of Work : Ten laning of Istanbul Road Project Riyadh Saudi Arabia

Km 0+000 to km 6+000

Client : Riyadh Municipalty, (AMANA)

Consultant : DAR AL-HANDASAH SHAIR AND PARTNERS

Project Cost : 52 Million SR.

Project Description:

It's a AMANAH project, the main feature of the road cross-section of this 6 km is, it has 4 types of typical cross sections, it is 10 lanning project consist of sub grade 300mm thick in two layer, Sub-Base- 200 mm thick in two layers, 70mm thick Asphalt bituminous work and 50mm thick Wearing Coarse provided at the top of the layer. It consist of 6 Nos major intersection, Six Lane Main Road Both Side and four Lane Service Road both side, 91 Nos High Mast Ple 20M Height in median portion and 406 Decorated Light Pole both side with Service road 6M Height, Two Electric Sub-Station, Two Separator both side with main road and cover with Interlock Block, four type of curb stone, Irrigation work with Plantation (Shade Tree & Palm Trees) Shade tree with Walk way only and Palm Trees and shade Trees in Median portion, sewage work in median and both side of walk way portion, 2 Flyover & 3 Underpass.

Description of Duties:

As a Sr.Quantity Surveyor I am responsible for.

Invoice preparation and certify it from Consultant.

Responsible for Preparation of the bill and follow up the bill.

Responsible for preparation of details of follow up works and getting approval from consultant.

Preparation of Road Longitudinal Sections and Cross Sections with the help of Auto Plotter & CalQuan.

Variation Preparation & BoQ Review.

Preparation of working drawings for Structures Bar Bending Schedule

Preparation of road estimate.

Tracking the project schedules.

Preparing a comparisons statement.

Preparing comparisons statement for the tender.

Coordinating with Design & Construction team.

Maintain the vendor records.

Rate analysis of extra items.

Conduct Rate Analysis (w.r.t. Schedule of Rate & Standard Data Book).

Monthly Reconciliation of Material (Major).

Physical & Financial progress (cash flow statements)

Prepare Subcontracts evaluation statement and contractual claims

Calculating quantity for bill & cross check of measurement sheet provided by site engineer.

Material reconciliation & Material scheduling

Preparing work program for execution of work.

Studding Typical Drawing and preparing data for site work.

Preparation of daily progress reports & monthly progress reports,& maintaining Bar Chart

Horizontal and Vertical Curves Calculations.

Modification of plan and profile of highway as per site requirement.

Calculating centerline co-ordinate and curve co-ordinates.

Calculation of toe edges for Embankment and Earthwork excavations.

Preparation full documentation proper way.

5) -Working Period : March - 2014 to Nov.-2014

Organization : Madhucon Projects Ltd.

Position held : Sr.Quantity Surveyor

Name of Work : Four laning of Ranchi - Rargaon - Jamshedpur Section of NH-33 from

km114+000 to km277+500 on DBFOT (Annuity) basis in the State of

Jharkhand under NHDP Phase-III.

Concessionaire : Ranchi Expressways Ltd.

EPC Contractor : Madhucon Projects Ltd.

Design Consultant : Meltech Infrastructure Engineers Ltd.

Independent Consulting Engineer : Aarvee Associates

Client : National Highway Authority of India (NHAI)

Project Cost : 1352 Crores.

Project Description:

It's a DBFOT ANNUITY project, the main feature of the road cross-section of this 162 km is, it has 7 types of typical cross sections, it is four / six lanning project consist of sub grade 500mm thick, GSB-200mm thick, WMM- 250 mm thick in two layers and 175mm thick bituminous work in which thick 110mm DBM and Bituminous Concrete provided at the top of the layer which will be 40mm thick. It consist of 206 Single cell, 142 pipe Culver, 5 Major Bridges, 44 Minor Bridge, 3 R.O.B, 6 Flyover & 17 Underpass.

Description of Duties:

As a Sr.Quantity Surveyor I am responsible for.

IPA preparation and certify it from Consultant.

Responsible for Preparation of the bill and follow up the bill.

Responsible for preparation of details of follow up works and getting approval from consultant.

Preparation of Road Longitudinal Sections and Cross Sections with the help of Auto Plotter & CalQuan.

Variation Preparation & BoQ Review.

Preparation of working drawings for Structures Bar Bending Schedule

Preparation of road estimate.

Prepare Subcontracts evaluation statement and contractual claims

Calculating quantity for bill & cross check of measurement sheet provided by site engineer.

Material reconciliation & Material scheduling

Preparing work programme for execution of work.

Studding Typical Drawing and preparing data for site work.

Preparation of daily progress reports & monthly progress reports,& maintaining Bar Chart

Horizontal and Vertical Curves Calculations.

Modification of plan and profile of highway as per site requirement.

Calculating centerline co-ordinate and curve co-ordinates.

Calculation of toe edges for Embankment and Earthwork excavations.

6) -Working Period : NOV - 2012 to Jan-2014

Organization : Khalid Bin Ahmad & Sons (OMAM)

Position held : Quantity Surveyor (Head Office Gala)

P.O. Box No. 283

Postal Code - 133

Sultanate of Oman

Phone: - +968-***-**-***

Reporting to General Manager Mr. T.A.Nazar

Detailed Task Assigned:

Preparation of IPA as per Contract.

Quantity Estimation.

Variation Order Preparation.

BOQ Review & BOQ Preparation.

Conduct Rate Analysis (w.r.t. Schedule of Rate & Standard Data Book).

Prepare Subcontracts evaluation statement and contractual claims.

Preparing Physical & Financial progress (cash flow statements)

Monthly Reconciliation of Material (Major).

Material Scheduling as per Planning.

Preparation of Cross Section & Longitudinal Section.

Supervising the reinforcement detailing work and preparation of Bar Bending Schedule.

Toe Calculation for Embankment.

Deal with consultant for drawings and other contractual matter with respect to MoR&TH, CoPA & FIDIC clauses.

Maintaining Progress Detail w.r.t to Bar Chart (Highway & Structure) correlates with

IPC, discuss with site Engineer, regarding progress and provide suggestion and data for better progress.

Preparing Monthly & Daily Progress Report

Maintain record in proper and easy way

Layout preparation of Structure.

Centerline Co-Ordinate calculation from Soft Copy of Alignment Drawing.

As Built Drawing Preparation.

Cross Section

Structure Drawing

7) -Working Period : July - 2011 to OCT-2012

Organization : Madhucon Projects Ltd.

Position held : Quantity Surveyor

Name of Work : Rehabilitation and upgrading of existing road to four lanes

from Km 70.261 to 107.851 (Darbhanga to Jhanjharpur)

section of NH-57 in the state of Bihar (Package BR-7)

Consultant : Scott Wilson India (P) Ltd.

Client : National Highway Authority of India (NHAI)

Project Cost : 454 Crores.

Project:

Four-laning & Strengthening of NH-57 from Km 110+000 to Km 70+000 (Jhanjharpur - Darbhanga Section) in the state of Bihar (Contract Package - CII/BR-7). Client: National Highways Authority of India; Project Cost:

Rs. 454 Crores, Consultant: Scott Wilson Kirkpatrick India Pvt. Ltd.

Project Description:

It's a BOQ project, the main feature of the road cross-section of this 37.590km is, it has 7 types of typical cross sections, it is four / six lanning project consist of sub grade 500mm thick, GSB-260mm thick, WMM- 250 mm thick in two layers and 175mm thick bituminous work in which thick 110mm DBM and Bituminous Concrete provided at the top of the layer which will be 40mm thick. It consist of 53 Single cell, 2 Multi cell, 5 pipe Culver,2 Major Bridges (6 x 40 Well Foundation & 5 x 15.6 Pile Foundation) 13 Minor Bridge (Pile Foundation), 2 Minor Bridge (Solid Slab), 2 R.O.B, 1 Flyover & 5 Underpass.

Description of Duties:

As a Quantity Surveyor I am responsible for.

IPA preparation and certify it from Consultant.

Responsible for Preparation of the bill and follow up the bill.

Responsible for preparation of details of follow up works and getting approval from consultant.

Preparation of Road Longitudinal Sections and Cross Sections with the help of Auto Plotter & CalQuan.

Variation Preparation & BOQ Review.

Preparation of working drawings for Structures Bar Bending Schedule

Preparation of road estimate.

Prepare Subcontracts evaluation statement and contractual claims

Calculating quantity for bill & cross check of measurement sheet provided by site engineer.

Material reconciliation & Material scheduling

Preparing work program for execution of work.

Studding Typical Drawing and preparing data for site work.

Preparation of daily progress reports & monthly progress reports,& maintaining Bar Chart

Horizontal and Vertical Curves Calculations.

Modification of plan and profile of highway as per site requirement.

Calculating centerline co-ordinate and curve co-ordinates.

Calculation of toe edges for Embankment and Earthwork excavations.

8) - Working Period : April - 2005 to June-2007

Organization : Madhucon Projects Ltd.

Position held : Quantity Surveyor

Name of Work : Rehabilitation and upgrading of existing road to four lanes

from Km 70.261 to 107.851 (Darbhanga to Jhanjharpur)

section of NH-57 in the state of Bihar (Package BR-7)

Consultant : Scott Wilson India (P) Ltd.

Client : National Highway Authority of India (NHAI)

Project Cost : 454 Crores.

9) - A.Q.Construction Pvt.Ltd.

(Builder & Supervision) Works

(Single Story and Multistory Building), New Market Works.

Darbhanga

Bihar -846004.

Working Period :- (Feb - 2005 TO March -2006)

Designation : - Asst. Q.S.

EDUATIONAL QUALIFICATION:

1.Matric (10th) from B.S.E.B-Patna in 1997.

2.I.Sc.Math, (10+2) from B.I.E.C Patna in 2000.

Additional qualification:

1.Computer Dos, Window, Ms.Office (Word, Excel, PowerPoint), FoxPro

2.AutoCAD 2D & 3D

3.Auto Cad Civil 3D

4. Typing (English).

5.Photoshop

6.CalQuan 5.2, Software for Cross-Section.

7.Internet etc.

Personal detail:

Name : - Md.Fahimuddin Ansari

Date of Birth : - 31.12.1981

Sex : - Male

Marital Status : - Married

Nationality : - Indian

Religion : - Islam

Language known:

WRITE SPEAK READ

ENGLISH : Excellent Excellent Excellent

HINDI : Excellent Excellent Excellent

URDU : Excellent Excellent Excellent

ARABIC : Good Good Excellent

Permanent Address : MOH- Quazipura

P.O+P.S- Laheriasarai

Dist- Darbhanga (Bihar)

Mobile - +91-989*******

Passport Details :

Passport Number- S7008885

Date of Issue- 11-12-2018

Date of Expiry-10-12-2028

Palace of Issue-Patna.

Salary Expected : Negotiable

Notice Period : 15 Days (Immediately)

DECLARATION

I the undersigned certify that to the best of my knowledge & belief, this bio-data correctly describes myself, my qualification & my experience. I understand that any willful misstatement describes here in my lead to my disqualification or dismissal if employed.

Place: SIGNATURE

Date: (Md.Fahimuddin Ansari)



Contact this candidate