Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
Oklahoma City, OK
Salary:
$35.00
Posted:
June 01, 2020

Contact this candidate

Resume:

Scotty Richardson

Phone: 405-***-****

addjmn@r.postjobfree.com

**** **. **** **. ******** City, Ok 73160

SUMMARY

I have been working as a Sr. Systems Electrical Engineer gaining Hands on Experience over supporting Landing gear Systems, developing Test Programs for MSAT with Lab View and research, design and develop hardware and software systems. Experience working with PLC’s, high speed frequency drives, design engineering, modeling and simulating circuits, TTR – Transformer Test Ratio resistances test devices with much more to offer. Public Trust Security Clearance.

SKILLS

FAA performance criteria and developing test program, Mixed Signal Automatic Tester, FPGA designing, maintenance and testing, conversion of LCSS data structures into the IFS data system and also tested LRU, ASCE 7, ACI Standards and Unified Facilities Criteria, VOR/DME System, MatLab; FORTRAN; C++, PSpice, LTSpice

EXPERIENCE

Griffin Communication -7401 N. Kelly Ave. Oklahoma City, Ok Nov 25, 2019 to March 2020.

Supervisor: Drew Stone

Broad Cast Engineer-Setup, operate and maintain the electrical equipment for radios and television broadcasts, and maintain radio towers and generators and installation, maintenances and operation of all broadcast- related equipment and serve as a support role for managers and directors.

First staffing/ City Worker-7325 S. Western Ave. Oklahoma City, ok September 20/2019 to November 25, 2019

Supervisor: Ali Khalid

Duties-Road maintenance Worker, infrastructure repair and other tasks in sealing cracks, an holes in the street, asphalt related work, oversee that the task is carried out and completed

Premier Computer- 3908 N. Portland Ave, Oklahoma City, OK 12/11/2017 - 05/30/2019

Supervisor: Jack Green

Electronics Tech Engineering

Services various computer disk drives, Wrens, Western Digital drives and Olivetti drives, and controller boards, these are just a few of the computer drives that was serviced, also performed diagnosis on the heads to ensure reading the media and circuits test .

Unemployed 11/8/2017 to 12/11/2017

I.S. Technologies LLC, Oklahoma City, OK 08/8/2017 - 11/8/2017

Supervisor: Kathy Hedglen

Electronic Tech Engineer

WC-710, Support the Landing gear Sys. MODVORTAC, VOR/DME System, by trouble shooting the controller by utilizing various test procedures that are designed to identify problem with the MOD Controller

Unemployed from 11/04/2016 to 08/08/2017

I.S. Technologies LLC, Oklahoma City, OK 01/13/2014 - 11/04/2016

Supervisor: Kathy Hedglen

Sr. System Engineer

Supporting the ASR-8 for NAS at FAA and Developing test program for the MSAT-“Mixed Signal Automatic Tester” by the use of” LabView software” and, implementing LCSS data structures into the IFS data system and also tested LRU- “Long range FPGA boards for the ASR-8. And also trouble shoots various FPGA boards and with the use of capturing data with excel.

Developed technical written document, and demonstrated with excellent oral skills.

Served as a professional Electrical Engineer, performing design with the use of “LT PSpice” duties in support of NAS. With professional knowledge of electrical engineering

Researches, designs and develops hardware and software systems, enhancements, modifications and configurations to existing systems and networks.

Provides required inputs for development of hardware and software system manuals, guidelines and documentation where commercially developed documents are unavailable.

Provides engineering review of ASR-8 System software and hardware design data to ensure compliance with FAA performance criteria

Reverse Engineering on the Air-card FPGA that utilizes and SCR that needed to be redesigned.

Redesign the MTI FPGA and motor controller for the radar system – moving target indicator card by implementing 8-bit data cable and designing a new test program for the motor controller board.

Hiring committee – ensure affirmative action was implemented and all interviews was conducted fairly.

GovnorAir/Temtrol, Oklahoma City, OK 11/12/2011 - 01/09/2014

Supervisor: Kenny Lunow

Electronic Tech Engineer

Build various HVAC units and bend conduit for installation

Read Blueprints for construction and installation

AC Motor design and installation 3 phase.

Variable Speed or frequency Drives “VFD”.

PLC and DDC Control Logic Programs and ABB products and Allen Bradley

Build panel boxes and NEMA Boxes for various relay controls.

Building Code, NFPA Life Safety Code, ASCE 7, ACI Standards, AISC Standards, and Unified Facilities Criteria.

Automated controls.

Unemployed from 10/12/2010 to 11/12/2011

Southwest Electric Transformer Company, OK 02/10/2006 - 10/12/2010

Supervisor: Gary Phillips

Associate Electrical Engineer

Creating a design that’s affordable for customer, and give design quotes too our customers and answer their questions for the best design based for 50Kva to 2500Kva Transformers and “Mechanical Design” with the use of AUTO CAD-LITE.

Also to assistant our employees on the shop floor with winding data materials for winding coils for transformers range from 50KVA to 2500Kva multiple shift transformers- Multi-tap and also used excel to design test reports for all of our transformers.

BOM- Bill of Material to ensure every part and material that will be used to complete the job ordering process with excels.

Unemployed from 05/2001 to 02/10/2006 “School”

University of Oklahoma, Norman OK 2002 - 2006

Completing my Bachelors in E.E and Computer sciences

York International/Johnson Control, Norman, OK 04/1989 - 05/9/2001

Supervisor: Julie Brook

Assemble various resident and commercial HVAC units and operated Hydraulic Press Brake too form the Sheet metal to meet drawing spec, for 11 years.

Tools

Java 1 and 2; MatLab; FORTRAN; C++; MS word; Excel, Microsoft Project Manager, P Spice, Lab view, Auto Cad-Lite 2007 version

Oscilloscope Measurements, Analog and Digital Meters

Experiences in modeling and simulating circuits

TTR – Transformer Test Ratio resistances test devices

Schematics, blueprints and wiring diagrams and installations

Wired 3 phase motors.

PLC – program logic controller with Allen Bradley units ABB products.

SCADA program at OSU-tech- Spring 2012.

EDUCATION

University of Oklahoma, Norman, OK

Bachelor Degree in Electrical Engineering

Oklahoma State Technical Branch, Oklahoma City, OK

Associate Degree in Electronic Technology

US. Navy Propulsion Power Plant “A” School great Lakes IL



Contact this candidate