Post Job Free

Resume

Sign in

Engineer Project

Location:
Riyadh, Saudi Arabia
Posted:
May 24, 2020

Contact this candidate

Resume:

* **** **

ENG/ABDELHADY MAHMOUD IBRAHIM

MOBILE : + 966 05 48021244

EMAIL : addec7@r.postjobfree.com

LINKEDIN PROFILE: https://www.linkedin.com/in/abdelhady-mahmoud-a93bb412b/

(COST ESTIMATION MANAGER)

Date Of Birth: 15th, JULY 1984.

Gender: Male.

Nationality: Egyptian.

Military Status: Final exemption.

Marital Status: Married.

Address: AL Jubail –Industrial City

Religion: Muslim

Place Of Birth: Mit Ghmar-Dakahalia-Egypt

Driver's License: available

Personal

Information

B.Sc. OF Engineering 2006

Name of university: Zagazig University, Faculty Of Engineering Specialization: Civil Section

Graduation year: May2006

Graduation Degree: Good (68.7%)

Graduation Project: Structure analysis and design by computer Project degree: excellent

Education

Build Soft (quantity surveying program)

Plan Swift (quantity surveying program)

RAI (cost estimation program)

Autodesk Revit 2013 (arch. &Revit struc.)

AutoCAD structure detailing

SAP2000(all versions) + SAFE

Auto Cad (all versions)

MS Office (all versions)

Prokon V2.4

Primavera (version six)-Project Management

Computer Skill s

2 Page CV

Arabic: Mother Tongue.

English: very Good (Write, Read & Speak).

Languages

Training courses in PMP at Mohsen Essam Center (Attached certificate).

Training courses in CEP at AACE center in cost estimation

(Attached certificate).

Training courses in Rai cost estimation program

Training courses in build soft program at green field Dubai

Training courses in plan swift program at green field Dubai

Training courses in Autodesk Revit 2013 at Autodesk ATC&ACC in Jeddah (Attached Certificate).

Training courses in quantity surveying manual & computerized

Training courses in concrete construction in "Arab contractors training center "

Training course in AUTO CAD at" Essam farouk center"

Training course in SAP2000 a" Essam farouk centre"

Training course in Primavera 6" salah zayed centre" ENGINEE - RING

COURSES

3 Page CV

Professional Experience (K.S.A)

(AZMEEL CONTRACTING EST.)

(WORK IN THE TECHNICAL OFFICE)

Position:

Period from 2010 to 2012 (Sr. Estimation Engineer). Period from 2012 to 2014 (Chief. Estimation Engineer). Period from 2014 to Present (Estimation Manager).

Responsibilities:

Leading and developing a team of cost estimators performing cost estimating

Providing training and guidance to the cost estimating team in the preparation of change orders cost estimation.

Acting as the source of authoritative advice on cost estimating matters, including cost negotiations with contractors on subjects which are related to contract change orders.

Contributing to the review of activities and methodologies required to drive continuous improvement in the cost estimating function.

Developing mid implementing consistent cost reporting templates to capture and analyze relevant data.

Preparing overhead cost & profit.

Providing guidance, direction, and specialized assistance for the resolution of difficult and complex estimating problems.

Accumulating, evaluating, and maintaining the program estimate database based on historical data and current market condition.

Preparing detailed breakdown of components and elements of estimates for systems and subsystems.

Review all final estimates prior to final submission to ensure accuracy and completeness.

Responsible for overall coordination of bid reviews and overseeing bid process.

Projects:

Aramco Project’s:

1. Cost estimated Jubail Home Ownership Increment I project in Experience

JUNE 2010–

PRESENT

4 Page CV

(Jubail) Final Infra Structure with Price (about 147 Million. riyal).

2. Cost estimated East west Pump Station Residential Compound for Aramco staff in six different sites in kingdom with Price

(about riyal). (Under Negotiation with Aramco) 3. Cost estimated south Dhahran Home Ownership Increment I project in (Dhahran) Final Infra Structure with Price (about 141 Million riyal).

4. Cost estimated Maritime Zone E Offices & Support Facilities project in (Ras Al Khair) with Price (about 640 Million riyal). 5. Cost estimated Maritime Cluster (A) Apartment Buildings& Support Facilities project in (Ras Al Khair) with Price (about 1.4 Billion riyal).

6. Cost estimated Maritime Cluster (B) Apartment Buildings& Support Facilities project in (Ras Al Khair) with Price (about 1.0 Billion riyal).

7. Cost estimated King Salman Maritime project in (Ras Al Khair) with Price (about riyal). (Under Evaluation of Aramco)

8. Cost estimated HO Lot Dev _ Housing Units project in

(Yanbu) 273 Villa & Infra Structure with Price (about 750 Million riyal).

9. Cost estimated South Dhahran Apartment Buildings Package 2C project in (Dhahran) 12 apartment with infra-structure

(about 440 Million riyal).

10. Cost estimated Jubail Home Ownership Increment II project in

(Jubail) 346 Villa, 2 Mosque & Infra Structure with Price

(about 700 Million riyal).

11. Cost estimated South Dhahran Home Ownership Package 1 project in (Dhahran) 955 Villa with infra-structure (about 2.0 Billion riyal).

12. Cost estimated South Dhahran Home Ownership Package 2A project in (Dhahran) 380 Villa with infra-structure (about 770 Million riyal).

13. Cost estimated South Dhahran Home Ownership Package 3&4 project in (Dhahran) 792 Villa with infra-structure (about 1.5 Billion riyal).

14. Cost estimated 3 Aramco Stadium project in (Tabuk, Najran, and Baha) with Price (about 7 Billion riyal).

Other projects with different clients:

15. Cost estimated ALR'AIDAH HOUSING COMPLEX

5 Page CV

PROJECT IN JEDDAH (BP03-BP05) project in (Jeddah)

1144 Villa with Price (about 3.2 Billion riyal).

16. Cost estimated ALR'AIDAH HOUSING COMPLEX

PROJECT IN JEDDAH (BP04-BP06) project in (Jeddah) 114 Apartment with Price (about 4.1 Billion riyal).

17. Cost estimated Gosi Garanda Mall Extension project in

(Riyadh) Extension Mall with Price (about 405 Million riyal). 18. Cost estimated IKEA BLD project in (Al Khobar) with Price

(about 370 Million riyal).

19. Cost estimated RAR Residential Compound project in (Jubail) 12 Apartment, 251Villa &10 Community BLD with Infra Work with Price (about 600 Million riyal).

20. Cost estimated Staff housing for National Guard in Riyadh with Price (about 580 Million riyal).

21. Cost estimated Majmaa Hospital 300 Bed in Majmaa with Price

(about 1.2 Billion riyal).

22. Cost estimated Makah hotel commercial complex in Makah with Price (about 4.2 Billion riyal).

23. Cost estimated Prince Salman Hospital University in Al kharg with Price (about 540 Million riyal).

24. Cost estimated construction of Royal Commission Public Housing 207 villa in Yanbu with Price (about 215 million riyal).

25. Cost estimated prince Fawaz site in Jeddah 141 apartment with 7,6&5 story 4 package with Price (3,3 Billion riyal) 26. Cost estimated king Faisal University – Al Hasa Campus construction of three building inside the university building no.30, 33&53 with Price (about 235 million riyal). 27. Cost estimated construction of Safa Residential Complex in Jeddah with Price (about 465 million riyal).

28. Cost estimated construction of Herfy Tower in Riyadh with Price (about 70 million riyal).

29. Cost estimated Design of master plan, infrastructure

&Buildings of the residential complex (phase 2) of ITCC complex with Price (about 2 billion riyal).

30. Cost estimated construction of Al Doho Project in Riyadh with Price (about 200 million riyal).

31. Cost estimated construction of Jeddah Gate 3 tower with podium with Price (about 250 million riyal).

32. Cost estimated construction of Physical Education Building.

(14) In king Faisal University – Al Hasa Campus with Price

(about 120 million riyal).

33. Cost estimated construction High class residential compound 6 Page CV

for Al Rashed Company in Jubail with Price (325 million) 34. Cost estimated 3 fire station projects for royal commission in Jubail Industrial city with Price (45 million riyal). 35. Cost Estimated project for SABIC (Saudi kayan) consists of 319 villas and 248 villas in Yanbu&Jubail Industrial City, The price (800 Million includes the site development work 36. Cost Estimated project for SABIC (package 1.) consists of 234 villas in Jubail Industrial City & 51 apartment with Price

(950 Million Includes the site development work).

37. Cost Estimated project for SABIC (package 2.) consists of 438 villas in Jubail Industrial City, the Price (750 Million includes The site Development work).

38. Cost Estimated project for SABIC (package 3.) consists of 402 villas in Jubail Industrial City, the Price ( 720 Million includes The site Development work).

39. Cost Estimated project for SABIC (package 4.) consists of 440 villas in Jubail Industrial City, the Price ( 800 Million includes The site Development work).

(AZMEEL CONTRACTING EST.)

. WORK IN THE TECHNICAL OFFICE

Position: (Sr.coordinator engineer)

Projects: construction 16 Apartment (Jubail Industrials -Jalmuda) Cost : About 215 millions S.R.

The designer: EGEC & Partner for engineering consultation The consultant: Worley Parsons.

The owner: MA’ADEN (Saudi Arabian mining company)

Job Description:

1- Co-ordinate between Precast Company & Designer. 2- Follow the submittal’s with consultant.

3- Ensuring that clients’ needs are met as the project evolves 4- Follow the submittal time schedule with Designer& Cons. 5- Co-ordinate between Precast Company & MEP

Discipline.

6- Ensure & follow up with designer to give the optimum design along with fulfilling client requirements.

7- Deliver the approved Drawing to site for Execution. MARCH 2008 –

JUNE 2010

7 Page CV

Position: (Sr.coordinator engineer)

Projects: construction of a village at (RAS AZ ZAWR) Cost : About 450 millions S.R.

The designer: DAR consulting engineer

The consultant: WORLEY PARSONS.

The owner: MA’ADEN (Saudi Arabian mining company)

Job Description:

1- Co-ordinate between Precast Company & Designer. 2- Follow the submittal’s with consultant.

3- Ensuring that clients’ needs are met as the project evolves 4- Follow the submittal time schedule with Designer& Cons. 5- Co-ordinate between Precast Company & MEP

Discipline.

6- Ensure & follow up with designer to give the optimum design along with fulfilling client requirements.

7- Deliver the approved Drawing to site for Execution.

(WORK IN THE TECHNICAL OFFICE)

Position: technical engineer. (designer engineer)

Projects:

1. Design for azmeel work shop1 (166 m * 26.6m) I make design for isolated footing with pedestals, grid beams and slab on grade

2. Design for azmeel work shop2 (48 m * 20m) I make design for isolated footing with pedestals, grid beams and slab on grade 3. Design admin building for azmeel (11m*12m) three story Building.

(WORK IN THE TECHNICAL OFFICE)

Position: Technical engineer. (planning engineer)

Projects:

1. Primary schedule for holly Quran school

2. Primary schedule for fire station building

3. primary schedule for 2 projects village for sabic 8 Page CV

(AZMEEL CONTRACTING EST.)

Establishment for Industrial factory project.

Position: Site engineer.

Projects: Dualization of industrial project, seamless pipe line factory, civil Structure

Cost : About 350 million S.R.

The designer : Saudi designer engineers ENG. consultants The consultant: DANEILI ENGINEERING

The owner : JUBAIL ENERGY SERVICES CO. – KINGDOM OF SAUDI ARABIA

Job Description:

1- Executing piles for foundation (CFA &BORED PILES), 2- Executing main foundation isolated footing with grid beams and pedestals for the steel structure

3- Coordinate the arch. Drawing with Structure Drwg and follow up with Tech. team if needed.

4- Prepare all official site documents.

5- Control and monitor site waste.

Professional Experience (Egypt)

AQUARIOS COMPANY FOR CONSTRUCTION

Position: Site Engineer& Quantity Surveyor

Projects: Construction of village in (El Ein EL Sokhna) Cost : 300 millions LE.

Job Description:

1- Executing villas finishing work.

2- Prepare all official site documents.

3- Prepare Q.S for Invoices.

4- Distribute work crew on site.

5- Monitoring the productivity of labor.

6- Check the delivered material to meet the requirement of client.

May 2007 –

March 2008

JUNE 200 6 –

February 200 7

9 Page CV

10 Page CV

11 Page CV



Contact this candidate