A competent professional with 17 years’ experience in BMS, MEP and ELV with electrical, drafting and modelling specialization in Power Plants, Residential Buildings, Railway, Warehouses. Effectively utilization of technical knowledge in combination with various electrical operations and drafting ORGANISATIONAL EXPERIENCE
Nov’13-Present M/s Tamdeed W.L.L. Qatar, as Lead Engineer-ELV Projects. Role:
Day-to-Day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.
Prepares for installations by reviewing installation orders, gathering equipment, supplies, and tools; coordinating schedules.
Inspect installation sites and study work orders, building plans, and installation manuals to determine materials requirements and installation procedures.
Resolving any unexpected technical difficulties and other problems that may arise.
Coordinating for Mock up Inspections, ELV Systems
Designing for cable selection, sizing and routing paths as per the site condition and project requirements.
Communicating with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of the project progress.
Onsite Installation, Programming, Testing and Training.
Involve in testing and commissioning of the installed systems and ensure compliance and handover.
Assure that the installations of ELV related systems (CCTV, ACS, PA, BGM, BMS etc.) are following drawings, required specifications and standards.
May’09-Apr’12 M/s Sultan Bin Khaleel, Riyadh- KSA, as Maintenance Engineer Role:
Preparing and submitting single line diagram as per the project requirement.
Making sure all electrical engineering projects are fit for purpose.
Follow standardized guidelines for day to day quality checks and site inspections and define address all electrical issues, problems, disputes and client concerns.
Progress the work of all electrical engineering activities and operations based on project specifications and plans within stipulated safety norms at project site.
Operation and Maintenance of all types of electrical panels (Switch gear, Control Panel and Lighting Panel) on project site.
Planning of shutdown activities, Manpower need and spares. Oct’03-Nov’08 M/s Siemens L.L.C, Al-Ain & Abu Dhabi- UAE, as Site Engineer Role:
Operation and Maintenance of MEP Project Electrical Distribution System Switch gears, Switch –boards, lighting system, Earthing and Lightning protection system and UPS system.
Preparing and submitting single line diagram as per the project requirement.
Electrical Load Calculation and Voltage Drop.
Involved in DB Scheduling, power, lighting and Cable Tray Layout.
Duties include wiring verifications prior to initial energizing, calibrations, loop checks, control loop/interlock verifications.
Oct 2002 to Sep 2003 M/s Fujairah Power House- UAE, as Electrical Foreman Role:
Trouble shooting and maintenance of Electrical Control Circuits.
Modification of lighting system & motor controls as per international standard.
Testing Work: Continuity testing, Breaker Test, Battery Test, Temperature Test, Illumination Test
using Lux Meter, Relay Test and all Electrical Related Testing to be done.
Installation of Low Voltage distribution panel 415volt and DC charger.
Erection of earthing network systems and lighting protection systems.
Installation, Testing and Commissioning of Motors.
Carry out maintenance of UPS/Chargers & Battery system. Nov 2000 to June 2002 M/s Sun Rise Bldg. Maintenance & Contracting- UAE as Electrician Foreman Role:
Responsible for the execution of preventive and corrective maintenance, repair and troubleshooting of all electrical equipment's, such as motors and motor starters, generators, Switchgears, AC/DC UPS, Plant lighting system and plant earthing system.
Carry out maintenance of UPS/Chargers & Battery system.
Erection of earthing network systems and lighting protection systems.
Trouble shooting and maintenance of Electrical Control Circuits. EDUCATIONAL QUALIFICATION:
PERSONAL DETAILS:
Date of Birth : 01st February 1982
Gender : Male
Language Known : English, Malayalam, Hindi.
Marital Status : Married
Driving License : Qatar Driving License
Visa Status : Transferable after 6 month
Current Salary : 9500+Car+Fuel
I hereby declare that all the information and facts stated here in and above are true to the best of my knowledge. Date: /02/2020 Sajesh CV
Certification Course Course Attended Institute Year Primavera P6 CAD Center, Qatar 2018
Revit 2017 MEP CAD Center, Qatar 2018
PSP Planning and Scheduling Chicago Training, Qatar 2017 Advance Automation PLC SCADA IPCS-Kochi 2014
Optic Fiber Inspector Fiber Splicing, OTDR Testing NIFE-Kochi 2013 Renewable Energy Solar Panels, Inverters and Drives National Institute-Kochi 2013 Advance Security System ELV Systems National Institute- Kochi 2012 Fire and Safety Fire Fighting and First Aid NIFE- Kochi 2012 Auto Cad CAD Center Sharjah 2002
Electric Engineering Diploma
Good Shepherds Technical
Institute
2000
SSLC 10 GHS EDAPPAL 1997
KEY PROJECTS
Client: Lusail Express way( P003 Lusail)
Main Contractor: HYUNDAI
Period: June 18 - Ongoing
Project Details: (Ventilation System Installation) SCADA Systems, (Installation of DDC Panel, LCP Panel, installation and testing). Coordination with other package contractors to carry out our scope of work within the time frame. Client: LRT (Light Rail Transit) Lusail
Main Contractor: Schneider Electric.
Period: Feb 18 -June 18
Project Details: BMS Systems, (Installation of PLC Panel, RIO Panel, RTU, Server, Field Controls, installation and testing). Coordination with other package contractors to carry out our scope of work within the time frame. Client: Qatar Rail
Main Contractor: Mitsubishi Heavy Industry.
Period: Feb 17 -Jan 18
Project Details: Temporary Tunnel Ventilation System, Installation of Jet Fan, MCC Panel and Cable pulling in Tunnel. Coordination with other package contractors to carry out our scope of work within the time frame. Client: Gulf Warehousing Company (GWC)
Main Contractor: Cluster Security Services
Period: Apr’16-Feb17
Project Details: Bu-Sulba Logistic Hub- IP CCTV system- Installation of 800+ cameras with accessories, civil works includes GI/PVC Conducting, GI Trunking, Electrical Cable Pulling and Termination. Coordination with other package contractors to carry out our scope of work within the time frame
.
Client: Qatar Rail
Main Contractor: Salam Technology
Period: Feb’16- Mar’16
Project Details: Qatar Rail IP CCTV system- Installation of 40 cameras with accessories, civil works includes GI/PVC Conducting, GI Trunking, Electrical Cable Pulling and Termination. Coordination with other package contractors to carry out our scope of work within the time frame.
Client: Qatar Central Bank
Main Contractor: Salam Technology
Period: Jun’15- Feb’16
Project Details: Qatar Central Bank IP CCTV system- Installation of 295+ cameras with accessories, civil works includes GI/PVC Conducting, GI Trunking, Electrical Cable Pulling and Termination. Coordination with other package contractors to carry out our scope of work within the time frame. Client: Qatar Central Bank
Main Contractor: Salam Technology
Period: Jun’15- Feb’16
Project Details: Qatar Central Bank IP CCTV system- Installation of 295+ cameras with accessories, civil works includes GI/PVC Conducting, GI Trunking, Electrical Cable Pulling and Termination. Coordination with other package contractors to carry out our scope of work within the time frame. Client: MOI CCTV Project- Search and Follow up Department Spider 9 Main Contractor: Salam Technology
Period: Jul’14- May’15
Project Details: MOI IP CCTV system- Installation of 375+ cameras with accessories, civil works includes GI/UPVC Conducting, GI Trunking, Electrical Cable Pulling and Termination. Coordination with other package contractors to carry out our scope of work within the time frame.
Client: MOI CCTV Project- 10 Police Stations and Civil Defense Building Spider 8 Main Contractor: Salam Technology
Period: Mar’14- Jun’14
Project Details: MOI IP CCTV system- Installation of 320+ cameras with accessories, civil works includes GI/UPVC Conducting, GI Trunking, Electrical Cable Pulling and Termination. Coordination with other package contractors to carry out our scope of work within the time frame.