Resume

Sign in

Mechanical Safety

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Posted:
May 23, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

NAME: SOULIMAN CHAKER HARB

Language: English Arabic (Fluent)

Nationality: Syrian

Location: UAE-Abu Dhabi

Date of Birth: 03 Jan 1979

Visa Status: Valid Employment Visa

Driving license UAE-Abu Dhabi

Passport No: N011825416

Mobile: +971-*********

Marital Status: Married

Email: adddwh@r.postjobfree.com

Education: Mechanical Diploma technician &

IOSH Managing safety.

Skype ID : soulimanharb

Skills: At oil fields/ Mechanical

Maintenance Foreman, construction

foreman, H.S.E Foreman (IOSH) managing

safety, Equipment installation&

Inspections supervisor, Machine

transportation Foreman.

Software Skills: 1-Maximo

2-Reading P&ID’s

3-Microsoft Applications: Microsoft Office

Applications (Word, Power Point, Outlook,

Excel & Access)

TRAINING & ACHIEVEMENTS

1- (IOSH) Managing safety.

2- Permit to work –Job performer level Permit

to work & learning-Approval authority level

3-Lifting & slinging

4-Certified for gas testing

5-ADCO safe driving

6-Fire fighting auxiliary team

7-H2S&Breathing Apparatus Certification

8-Basic First Aid CPR & AED

9- Introduction to Teamwork Course

10-Wellhead SSSV& Valve Maintenance

Training

10-TBT Awareness for job performers

11-Pump & compressors operation

Maintenance &Troubleshooting

12-Production operation &Surface

facilities

13- Certified scaffoldings for Erectors

14-Static Equipment introduction to valve

pressure vessels piping heat exchanger

OBJECTIVE& SKILLS: Objective is to work in an exciting and professional environment of the organization with personal development and growth possibilities and to achieve company’s goal through professional ethics, sincere commitment, team work and hard work. CAREER SUMMARY: 14 years of experience as QHSE coordinator & facility supervisor, safety officer in the field of construction, Oil & Gas industry projects in various Prestigious organizations like Gasco & ADCO.HSE Coordinator (IOSH) Managing safety & Facility Supervisor who well detailed inspection, auditing and evaluations. Well versed in project management program implementation and team over sight. Performing site inspection in compliance with company's safety, health and environmental system as

Well as Health Act and Workplace Safety and Environmental Public Health Regulations.

Conducting and investigating in the event of accident, near miss, dangerous occurrences or occupational disease. Helping team members of project in identifying and conducting risk assessments. Keeping and maintaining the HSE records & Making orders for Material in Maximo system

April 20th 2003 to Feb 20th 2016 : Abu Dhabi Company For On Shore Oil Operations (ADCO) ADCO employee as Mechanical Maintenance Foreman & Service Controller Performing major overhaul and preventive Maintenance for All mechanical equipment Mechanical Associated with oil & gas production &water Injection including reciprocating gas compressor planned, reporting, repairing as per oil field rules & safety (Daily Plan, Risk Assessment, Standard procedure, Maximo, permit to work, Gas test and Road safety) Gas compressor Multistage: planning, reporting, preparing required spare parts for maintenance, Major overhauls troubleshooting, controlling operation. Centrifugal Pumps: Booster, MOL, Glycol Regeneration System & Chemical System, planning, reporting, preparing required spare parts for maintenance, Major overhaul troubleshooting and controlling operation.

Production Separator, test separator, disposal tank, skimmer tank, drain line system, planning, reporting, preparing required spare parts for maintenance, preparing hydrocarbon for internal inspection, Major overhaul& trouble shooting and controlling operation . Well Head Oil, water injection, Gas injection, WAG: planning, reporting, preparing maintenance troubleshooting PM s Standard Procedures and controlling operation. X-mass tree Replacements after killing scour well as per safety and risk assessments Casing repair service the conductor preparation removed flow line instrumentation cable for excavation, back filling tie in flow line instrumentation cable as per safety and risk assessments X-mass tree valve replacement per safety and risk assessments Installing, disconnecting for operation BPV &VR Running and pulling from Tubing hanger Well head integrity pressure seal test, preparing& reporting well condition Planning preparing reporting well head tie in job coordinate monitoring Check Hydro test new well flow line valves and reporting well condition De chocking the flow line loop line vessels storage tanks valve Manuel& mechanical Maintenances & inspection valve: SDV, MOV, SSV, Boll, gate, NRV, relief valve …… Well conducting the operation, service planning, preparing reporting (killing, re killing, de chocking, SCSSV, clearance tubing, fishing….) Laying and removal of bleed off line and burn Machine Supervisor planning, reporting,inspection,controlling Dozer, Bulldozer, wheel loader, grader, JCB, Excavator, bob cat, Kenworth, truck,Hi up, forklift (excavation, lifting loading off loading, road access, shifting material, level area, sand clearance…etc) Welding & sand plasting line, flow line, work shop Planning preparing reporting for inspection Erecting, dismantling& inspection of scaffolding

Testing all fire system in CDS, RDS s

Launching and Retrieving PIGs

Handing over the location of rig& drawing of move road. Risk Assessment, hazard, near miss, fire fighting, inspection machine report and monthly meeting

FFD: involved in commissioning rig less well activities, CDS, RDS supervision& involved in commissioning, new constructions involved in commissioning. April 29th 2001 to Feb. 1st 2003 Consolidated Technical Services Hired to Gasco Ruwais as Mechanical Fitter Preparing Gasco Ruwais refinery shutdown activity maintenance servicing repairing Mechanical isolation (spading, de spading, cleaning, replacing valve, loading arms, Furnas burn on the flare) Fire system repairing replacing de chocking the deluge line Work shop servicing repairing testing by nitrogen and water as per company rules, safety (PSV, SSV, LCV, gate valve, ball valve, and fire hoses …..)

On the jetty platform: Connecting ships with loading arms. Fixing the demisters for Power Generation Units

Preparing and replacing the insulation gas valves

Jan 1st 1998 to Jan 1st 2001 working in SAPESCO Branch in Deir Ezzor/Syria as senior technician Supervising mechanical maintenance team for daily routine works and breakdown maintenance on all equipment associated with oil and gas production Water Injection at central process facility, which handles 350,000 B/per day of oil and water treatment Plant, Water injection centrifugal and reciprocating pump Caterpillar Waukesha Gas Engines various Air Composer Separators and vessels

Jun.1st 2016 to Dec. 31st 2016 Al Hourani Automatic Gear/ Customer service Receiving, inspecting cars and opening job files in system May 1st 2018 up to July 31st 2019 Alyafour Construction working as construction foreman, My duties were as fallow:

Coordinate construction work according to priorities and plans Produce schedule and monitor attendance

Supervise and train workers

Guarantee all safety precautions and quality standard are met. Supervise the use of machinery and equipment

Monitor expeditions and ensure it remains within budget Resolve problems

Report on progress to managers



Contact this candidate