JAYPEE S. GORTIFACION
Contact nos.: +974********
Email:*************@*****.***
Position: AFC System
SUMMARY
Responsible in all AFC OS installation of PCVM, TOM updating parameters, TVM/TOM EPT deleting and downloading application, TVM/EPT decommissioning and commissioning.
Passed in PIC LEVEL2 with ID NO. M19125579
6 years of working experience as a supervisor.s
Responsible for supervising and monitoring all the people involved in the process of installation, testing and commissioning of ELV SYSTEM such as ACS, CCTV, PAS, AUTOMATIC FARE COLLECTION ( AFC) SYSTEM, IP Telephone, Switches installation of the project.
Responsible to handle review drawings and specifications for the installations and termination of ELV devices.
Responsible to ensure quality work and monitoring work progress.
Various Middle Eastern based projects successfully completed within Project Supervisor/Site Engineer.
ACADEMIC QUALIFICATIONS & CERTIFICATIONS
College : Agusan Sur State College of Agriculture and Technology
Course Graduated : B.S in Electronic and Communication Engineering
Address : Bunawan, Agusan del Sur, Philippines
Year Graduated : April 8, 2008
ACHIEVEMENT:
EASTERN PACIFIC TECHNOLOGICAL INSTITUTE OF THE PHILIPPIES.INC
MANGAGOY, BISLIG CITY, PHILIPPINES
CONDUCTED FROM MAY 10, 2004 TO NOVEMBER 12, 2004 AT EPTIP TRAINING CENTER, MANAGAGOY, BISLIG CITY, PHIL.
Successful completion of the following training programs:
PROCESS INSTRUMENTATION FITTING AND ELECTRICAL INSTALLATION.
INSTRUMENTATION, AUTOMATION & PROCESS CONTROL.
INSTITUTE OF INTEGRATED ELECTRICAL ENGINEERSOF THE PHILIPPINES, INCORPORATED (IIEE) STATE OF QATAR CHAPTER (IIEE-SQC)
Successful completion of (40) hours comprehensive Technical Training Course in : Basic PLC and Instrumentation System
EMPLOYEMENT HISTORY
Company: Mitsubishi Heavy Industries Ltd.
Date : Nov. 24, 2019 to Present
Position : AFC Technician
Project : Metro Railway Qatar
Responsibilities:
Installation of OS of Portable Collection Vending Machine.
SVVP firmware Injection of Portable Collection Vending Machine.
Installation of AFC/EFT application of PCVM.
Checking of Mac Address of PCVM to register to Back Office.
Manual updating of Ticket Office Machine (TOM) Parameters.
Decommissioning and Commissioning of Ticket Vending Machine(TVM) in Electronic Payment Terminal (EPT)
Deleting and Downloading application of Ticket Office Machine (TOM) Electronic Payment Terminal (EPT)
Deleting and reuploading software/parameter of AFC Electronic Payment Terminal (EPT).
Maintenance of All AFC system (Ticket Office Machine (TOM), Ticketing Vending Machine (TVM), Gates, Portable Collection Vending Machine (PCVM).
Responsible of updating parameters locally in all AFC System TOM, TVM, GATES and PCVM.
Troubleshooting of all AFC system TOM, TVM, GATES and PCVM to normalize the equipment.
Responsible in replacement of all defective spare parts in all AFC System.
Editing and fixing missing bootstrap peripherals in Ticket Office Machine.
Company: Thales (Samam) Qatar
Date : Dec. 10, 2017 to Feb. 15, 2019
Position : ELV Installation Supervisor
Project : Metro Railway Qatar
Responsibilities
Monitor the Installation and Testing of Automatic Gate and Ticket Vending Machine in the station.
Preparing reports after finishing up other activities related to a particular event.
Responsible for the supervision and coordination of installation, testing & commissioning, integration and delivery of port Access Control System, Intercom System, Perimeter Intrusion Detection System(PIDS), Public Address(PA), Structural Cable pulling, LAN, Telecom Rack installation, termination & CCTV Surveillance System in accordance to the approved design and standards within the agreed timeline.
Review engineering drawings and refer any issues on revisions
Administer and obtain required work permit.
Supervises the review and approval of proposed systems and equipments.
Monitor the progress of site including all the installation and placement of equipment performed by the contractor
ensuring material compliance with project requirement.
Coordinate the application of the required protection and safety measures. Take necessary steps for preventing the occurrence of possible non-conformances and ensure rectification of existing non-conformances.
Administer reports on work progress achieved, technical, safety and contractual issues and concerns and upcoming work plans.
Supervise and control of the status and progress of the installation activities and of the related documents.
Performs other responsibilities as directed by Delivery and or Installation manager.
Company : Tai Hong Circuit Industry Co. Taiwan
Date : Dec. 16, 2014 to Dec. 8, 2017
Position : ELV/Telecom Maintenance Supervisor
Responsibilities
Supervision on installation, Testing, Commissioning and maintenance of CCTV Surveillance System, Public address Telephone system & Access Control Systems.
Lead camera configuration, focusing and zooming to achieve the desired coverage based on the drawing.
Interprets maintenance manuals, schematic and wiring diagrams, utilizing knowledge of electronics and using standards test instruments and hand tools.
Diagnose malfunctioning system, apparatus and components using test equipment and hand tools to locate the cause of breakdown and correct the problem.
Run testing and commissioning activities as per the testing schedule.
Ensure company and project specific QA/QC policies are adhered to throughout the testing process.
Scheduling, supervision and performance evaluation of staff consisted of technician and helpers.
Overseeing Quality Control and safety matters on the site and ensuring that regulations are adhered to.
Ensure all documentation and pre requisites are complete before internal testing.
Organize necessary permits to work.
Company : Thales (LTC) Qatar
Date : June 2011 to Aug. 2013
Position : CCTV and ACS T&C Supervisor
Project : Hamad International Airport
Provide feedback/report to the T&C manager on daily basis progress report on site activities.
Work closely to the team conducting T&C.
Create action plan corresponding on the problem encounter during T&C.
Supervise and take in-charge the implementation of connectivity and testing of ACS and CCTV during testing and commissioning.
Initiate sees to the implementation of schedules within reasonable target of accomplishment hereby help ensure that production efficiencies are attend amd maintained at the desired range at anytime.
Closed supervision to the workers to anticipate mistakes that can cause loss man-hour and allocated materials to the specific workable area.
Communicate to the other department or field supervisor, foreman, pertaining installation to avoid collision and rejection or punch list during inspection and damage or loss of materials as well as manpower.
Responsible in the implementation of construction of safety, productivity and quality of works.
Provides detailed drawing of ACS and CTV for testing and commissioning.
Provide T&C solution taking into account time and cost quality.
Company : PLDT-Philcom Philippines
Date : Nov. 2007 to Aug 2011
Position : OSP/Telecom Technician
Responsibilities
Preparing reports after finishing up other activities related to a particular event.
Install Internet and Telephone line.
Outside plant (OSP) work, trouble shooting of telephone and Internet that has no connection from distribution point to subscriber line.
Inside Plant (ISP) work, tracing telephone line from Switch Cabinet/ LAN card, in terms of Line Equipment Number shown from the console.
Resetting of modulator demodulator (MODEM) in case of no internet connection.
Troubleshooting from main distribution frame (MDF) to Vertical Distribution point (DP).
Receive direct call from remote switch engineer.
Worked on installation of CCTV System, Intruder Alarm System, Public Information System, Public Address System, Telephone Network, and Narrow Band Radio.
Interprets maintenance manuals, schematics, and wiring diagrams, utilizing knowledge of electronics and using standard test instruments and hand tools,
Lead the installation of intrusion devices on room access door on such magnetic door contact, exit push button, electromagnetic lock, intrusion key switch, proof card reader, motion detector etc.
Anticipate the supposed danger or might create an inconvenience during our work whether by giving a tool box talk and ensure the complete personal protective equipment of work party was used.
Coordinates the work report on the assigned engineer and supervisor