ICCS Certified Piping professional with experience on vast projects, 9+ years of supervisory experience in different roles.

Computer proficient in Microsoft office, word, excel, Navisworks, computer progressing.

I am an asset to any company with my attention to detail and strong work ethic.

I ensure that I contribute to the overall success of the projects.

Able to work under pressure to meet scheduling demands and changing timlines.

Strive on delivering a quality product every time with the expected level of excellence while never compromising the safety of my team or self.

Certifications

ICCS Ticketed supervisor, Better Supervision, Leadership for Safety Excellence, NAUSC Foreman Certificate, Red seal Journeyman, Valid OSSA Permit Training, Fall Protection, Aerial Work Platforms, Confined Space/entry monitor, High torqueing/tensioning, OSSA Regional, CSTS-09

Education

NAIT

degree

Graduated January 2010

NAIT: Patricia Campus - Edmonton, AB, Canada completion of Red Seal Steamfitter/Pipefitter Apprenticeship.

Employment History

Kiewet Energy Canada

Piping Foreman

June 13,2019 – Current

Interpipeline Heartland Project, PDH site

Supervising crew during construction phase in North /South rack, East/west rack, PR building, RD area.

Fabrication and hydrotesting of piping spools.

Rigging with 80 ton to 750 ton cranes.

Boltup and torqueing,

Progressing, planning and scheduling, coordination with all trades, QA/QC coordination.

Use of 3D modelling.

Waiward Industrial

Piping General Foreman

May 8 – June 11,2019

Suncor Baseplant, Plant 5 Cokers 5C-3/4

Replacement of Coker cutting cab air piping.

Field run all new tie ins for new motors and winches.

Install new psv’s and 3” vent piping.

Coordinate all NDE testing.

Hydrotest spools.

Completion of system with zero punch items upon pssr and turnover walkdowns.

Field run winches and drill stem through new system.

Finished turnaround on schedule with zero incidents or injuries.

CEDA Industrial Services

Pipefitter Foreman

April 7- April 25, 2019

CNUL JPM pitstop High Temp Froth.

Remove 30” and 24” spacers, blinded off VE402, deblended and relocated spacers.

Removed/Replaced 3-14” XV control valves,

Removed and replaced 2x30” steam valves and 20” control valve.

Removed and replaced 2x 30” HV valves

Blinded off Vessel in 4270 high temp froth.

Removed/replaced spool on top of exchanger sx-403

Tartan Industrial

Pipefitter Foreman

March- April, 2019

Dow Chemical Poly Plant Shutdown.

Removal and replacement of control valves.

Demo and replacement of steam lines.

CIMS Limited Partnership

Pipefitter

August 2018 – October 2018

Syncrude Denali 2 Shutdown, Powerhouse Boiler 203 Maintenance.

Blinding Unit, replaced all control valves, removed and prepped/replaced burner spuds and tips, replaced all air registers, demo and Install of new boiler feed lines, welded in new 8” flanges on boiler feed line for blinding, welded in new attemperator valve and piping, hydrotested new spools, buffed 900# steam line for full lpi, de blinded unit, Hydrotested boiler 203 and piping, installed start up vent valve.

CIMS Limited Partnership

Pipefitter foreman

March 2018 – May 2018

Syncrude Denali shutdown plant 25-1 ( STG, CO3, CO4 boilers, diverter, dea, precips). Supervising piping crew completing blinding in all areas, removal/reinstall of xv-4 diverter dump valve, all psv and control valve removal and reinstall, demo/welding/hydrotesting and install of new drain valves and associated piping. I ensured full compliance with safety standards from my crew and coworkers.

PCL Industrial Constructors Inc

Pipefitter Foreman

May 2015 – March 2018

Piping foreman during construction of NWR Sturgeon refinery,

Assembly of fin fans, offload of vessels, setting of pump skids, module and vessel setting/rigging in unit 40 Gasifier including tandem lifts of vessels with 600 ton cranes, piping fabrication and install, hydro and pneumatic testing, transferred to utilities unit to complete moaning of all piping systems in utilities and waste water units.

Pre-commissioning of Units 10-90, Oxygen piping and cleaning in units 40 and 60, air blows, steam blows, lube oil flushes, chemical flushes. Moaning of systems and completions walkdowns with client.

PCL

Pipefitter foreman/Coordinator

October 2013 – May 2015

Construction of shell albian sands MRM RC1 Project, progress coordinator/ tracking of manpower hours spent vs progress earned, scaffold coordinator, moaning of piping systems for completion, assist coordination of shutdown tie ins/ locate and mark out all cut lines for MRM And JPM shutdowns, PMI coordinator for all shutdown work, module install of new steam gen/water treatment plant/ 250 froth propane compressor/ 544 cooling Water, piping foreman on JPM shutdown, pneumatic and hydro testing, turnover walk downs with fluor and shell management.

PCL Industrial Constructors Inc.

Pipefitter Foreman

Edmonton, Alberta

March 2012 – October 2013

Piping foreman/ fill In general foreman at Kearl Oilsands tank farm (Brownfield Construction) Phase 2,

Supervised construction of underground piping in north and south tank farms, completion of sump piping, module setting, jack and roll of north and south VRU's, piping install/rigging, pump strains, hydro and pneumatic testing, moaning of all systems, turnover and completion's walk downs with client, insurance walks with client and third party inspectors for fireproofing/ fire suppression/ safety equipment, lead team In start up assist of natural gas system for boiler/plant start-up.

PCL Industrial Constructors Inc - FORT Mckay, AB

Pipefitter Foreman

October 2010 – March 2012

Construction and commissioning Of Kearl Oilsands Phase 1 Utilities, module setting with 600ton cranes, piping rigging and installation, piping fabrication, hydro and pneumatic testing, pump strains, field running instrumentation at diesel offloading station, startup and commissioning.

Aecon Industrial

Pipefitter

March 2010 – September 2010

Construction of Suncor MNU ( brownfield) consisting of; Hydrogen Reformer/Catylist Tubes, Piping fabrication, rigging, pneumatic and hydrotesting, pump strains, Hot and cold taps.

Aecon Industrial Western

Pipefitter

September 2009 – March 2010

Construction Of Suncor Firebag Phase 3, assisted construction management team and supervisors with materials procurement.

Ensured all Iso's were current with up to date field changes/design changes, coordinated completions of rfi work.

Responsible for rfi submissions including field measurements and photos of job locations for engineering.

Jacobs Industrial Services Ltd. Pipe Fabrication Facility

Pipefitter

August 2008 – October 2008

Assembly of Piping Modules for Suncor Voyageur Project.

Use of 130 ton rt crane installing piping into modules for site delivery.

KBR

Pipefitter

October 2008 – September 2009

Construction of Shell Scottford Upgrader in A & V unit. Piping fabrication, heavy rigging of all large bore piping, pump strains, hydro and pneumatic testing, field running new instrument air lines.

Materials receiving, piping fabrication in fab shop, hydro testing/pneumatic testing and piping module assembly.

Rigging of spools in laydown and operating bobcats for materials delivery.

Accomplishments

Chosen to represent Kiewit as a Joint Occupational Health and Safety Committee for the IPL Heartland Project.

Recognized by our IPL construction director Bill Schneider for my safety interventions on the IPL Heartland PDH site.

Chosen to represent PCL at the WCP safety forum for Exxon and Imperial in Fort Mcmurray for my involvement in the Safety Champion program.

I lead the Safety Champion meetings involving 2 craft from every trade on site taking over for our construction manager and general superintendent as meeting host.

Received the 2nd gold coin ever from the U&O turnaround managers on the Syncrude Denali shutdown for my leadership and continued support of the safety programs and motivating my crew to buy into it as well.

Chosen to represent UA Local 488 at the Alberta Building Trades conference representing 10,000 members alongside our business agents and business manager.

Became the aerial work platform competency instructor at Albian Sands for PCL. Ran 130 people through the competency course to verify sufficient experience.

References

Donald Howard

Construction Coordinator

Interpipeline PDH

587-***-****

addcce@r.postjobfree.com

George MacKinnon

Supervisor/ Area Authority

Syncrude

780-***-****

addcce@r.postjobfree.com

Muaad Al Shibany

Plant Operator

Syncrude

780-***-****

addcce@r.postjobfree.com

Dustin Elias

Superintendent/General Superintendent

PCL

780-***-****



Contact this candidate