Resume

Sign in

Engineer Piping

Location:
Qibla, Kuwait City, Kuwait
Salary:
KWD - 1600 + 200 per Month
Posted:
May 18, 2020

Contact this candidate

Resume:

Bhuban MoyBanerjee

Home: 009*********** •Cell: +965-******** •adda9g@r.postjobfree.com

EXPERIENCE: TOTAL-24.5 YEARS

(1) GULF EXPERIENCE- 15 Years (2) INDIAN EXPERIENCE- 9.5 Years

Experience in Oil And Gas – 13.5 years

Experience in Petrochemical and Refinery – 6 years

Experience in Power Sector – 5 years

Title: EW TREATMENT AND INJECTION SYSTEM PLANT at KUWAIT OIL CO.

Consultant: WORLEY PARSONS

Contractor: DODSAL ENGINEERING & CONST.PTE LTD.

Duration: SEP 2017 to Till Date.

Post: Deputy Manager Construction Piping (Mechanical)

Role:

Ensure that the Project environmental requirements and specific environmental issues related to construction activities are considered.

Cooperate with HSE Manager in implementing the Environmental Managements system walk down during the construction phases with permit to work system.

Ensure sufficient resources are available to support the implementation of the Project Environmental Management System onsite.

Site management, to report day to day Structural, Equipment’s Erection Status and U/G, A/G Piping / Pipeline erection with hydro test pack progress including future erection plan & test pack and punch list attend of UG RTRP & AG lines as per priority phase wise (GRE/GI/CS/SS/SDSS/COPPER NICKEL/CLADDING).

Also interact with client/customer for progress, technical matters and safety issues.

To carry out weekly safety meetings and to join safety walks.

Management of material in-put to the site in time.

To ensure all the work is being carried out as per the given schedule and requirement of drawing, quality and safely.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Chemical Injection System, Treated Water Tank, EW Balance Tank, Fire Water Ring Main Network, Water Recycle Pumps, Polymer/ De-Emulsifier/ Coagulant Chemical Drain Sump, Induced Gas Flotation, Nutshell Filter Packages, Treated Water Tank, Deluge Valve Skid & Spray System, Recovered Oil Water Pipelines, IA Distribution, PA Distribution Piping, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Emergency Diesel Generator, Surge Tank Pumps, Overflow Tank Transfer Pumps, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Nitrogen Packages.

To ensure all the work is being carried out Painting/ Insulation & Fire Proofing Works.

To ensure all the Radiography work is being carried out as per the given schedule and requirement of Class : CS/SS/SDSS/CLADDING/ALLOY/CU-NI PIPE NDE (SHOP & FIELD) RT %, MPI %, UT%, HARDNESS%, PWHT, CLEANING & PASSIVASION as per percentage wise.

Title: COMPRESSION STATION Plant at HASSIR'MEL

Consultant: SONATRACH

Post: Deputy Manager Piping,

Duration: 08/2016 to 03/2017

Contractor: DODSAL ENGINEERING & CONST.PTE LTD

Post: Deputy ManagerConstruction Piping (Mechanical)

Role:

Mechanical Deputy Construction Manager Equipment, Structural, Piping in the field dept.

To look AHU System, CO2 System, (CS/SS/Galvanized/Cladding/CU-NI) for Compression station GR5 Program Structure Erection, Equipment Erection Status, 3D modeling checks...

Responsible to report day to day Piping and erection with hydro test pack progress including future erection plan& test pack.

Interact with client for progress, technical matters and safety issues.

To carry out weekly safety meetings and to join safety walks through.

Also responsible for management of material in-put to the site in time.

To ensure all the work is being carried out as per the given schedule and requirement of drawing, quality and safely, and all System Punch points.

Identify and Piping Engineering Deliverable and review to ensure completeness and compliance to schedule and report progress, Cooling water System, Boiler Packages.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Chemical Injection System, Fire Water Ring Main Network, Chemical Drain Sump, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Overflow Tank Transfer Pumps, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Induceed Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

To ensure all the work is being carried out Painting/ Insulation & Fire Proofing Works.

To ensure all the Radiography work is being carried out as per the given schedule and requirement of Class : CS/SS/CLADDING/CU-NI PIPE NDE (SHOP & FIELD) RT %, MPI %, UT%, HARDNESS%, PWHT, CLEANING & PASSIVASION as per percentage wise.

Title: Shah Gas Development (Package 2 & 3) Project (Abu Dhabi, Hameem)

Client: Saipem Development Organization (Abu Dhabi)

Consultant:Al Hosn Gas,

Duration: 10/2011 to 06/2016

Contractor: DODSAL ENGINEERING& CONST.PTE LTD

Post: Deputy Manager PipingConstruction (Mechanical)

Role:

All AG & UG Piping/Structural/Equipments in the field dept.

At West Area In charge (UNIT-720/721/722) responsible for All Piping,Equipment’s & Structural Works As a area Manager and site management, responsible to report day to day Structural, Equipment Erection Status and U/G, A/G Piping Equipment’s and Structural erection progress including future erection plan. Interact with client for progress, technical matters and safety issues.

Weekly progress report meeting with clients.

To carry out weekly safety meetings and to join safety walks through.

Also responsible for management of material in-put to the site in time.

To ensure all the work is being carried out as per the given schedule and requirement of drawing, quality and safely.

And all 14 units System Punch points closing with Dossier Submission and Pre-Commission looking at the end of this project.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Compressor Package, Potable Water Distribution, Fire Water Ring Main Network, Water Recycle Pumps, Chemical Drain Sump, Deluge Skid & Spray System, IA Distribution, PA Distribution Piping, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Surge Tank Pumps, Overflow Tank Transfer Pumps, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Induceed Gas (Nitrogen)Package, Cooling water System, Boiler Packages.

To ensure all the work is being carried out Painting/ Insulation & Fire Proofing Works.

To ensure all the Radiography work is being carried out as per the given schedule and requirement of Class : CS/SS/SDSS/CLADDING/ALLOY/CU-NI PIPE NDE (SHOP & FIELD) RT %, MPI %, UT%, HARDNESS%, PWHT, CLEANING & PASSIVASION as per percentage wise.

Title: ESI Carbon Capture and Storage (CCS) Project (Phase -1: ESI -Rumaita)

Consultant: TERBODIN

Duration: 06/2016 to 08/2016

Contractor: DODSAL ENGINEERING & CONST.PTE LTD

Post: Deputy Manager Construction Piping(Mechanical)

Role:

As Deputy Manager of System punch list looking in the field with coordinate all discipline engineers and foreman's dept.wise.

I am responsible for All system punch Works.

As a System punch Manager and site management, also responsible to report day to day to Project Manager.

Interact with Client for progress, technical matters and safety issues.

To carry out daily/weekly meeting for progress report with General Manager Construction.

Responsible for management of in-put to the site in time.

To ensure all the work is being carried out as per the given schedule and requirement of quality, safely, Punch points and Dossier Submission with Pre-Commission activities.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Fire Water Ring Main Network, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Induceed Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

To ensure all the work is being carried out Painting/ Insulation & Fire Proofing Works.

To ensure all the Radiography work is being carried out as per the given schedule and requirement of Class : CS/SS/SDSS/CLADDING/ALLOY/CU-NI PIPE NDE (SHOP & FIELD) RT %, MPI %, UT%, HARDNESS%, PWHT, CLEANING & PASSIVASION as per percentage wise.

Title: Qarn Alam Steam Project (OMAN)

Consultant: PDO,

Contractor: DODSAL ENGINEERING & CONST.PTE LTD

Post: SENIOR CONSTRUCTION ENGINEER PIPING (Mechanical),

Duration:10/2008 to 09/2011

Role:

As Sr.Piping engineer in the field engineering dept.I am responsible for total supervision and site management, responsible to report day to day erection progress including future erection plan to Construction Manager.

AG & UG Piping fabrication and erection of WTP/CHEMICAL/STEAM (all above ground GRE, PVDF, CPVC and Metallic piping activities).

Interact with client for progress, technical matters and safety issues.

To carry out weekly safety meetings and to join safety walks through.

Management of material in-put to the site in time.

To ensure all the work is being carried out as per the given schedule and requirement of drawing, quality and safely.

Signing drawings and documents as originator in accordance with correct procedures.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Chemical Injection System, Fire Water Ring Main Network, Water Recycle Pumps, Chemical Drain Sump, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Induceed Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

To ensure all the work is being carried out Painting/ Insulation & Fire Proofing Works.

To ensure all the Radiography work is being carried out as per the given schedule and requirement of Class : CS/SS/DSS/SDSS/CLADDING/ALLOY/CU-NI PIPE NDE (SHOP & FIELD) RT %, MPI %, UT%, HARDNESS%, PWHT, CLEANING & PASSIVASION as per percentage wise.

Title: RAS GAS ONSHORE LNG EXPANSION PROJECT, Phase-2(Qatar)

Client: RAS GAS (Qatar).

Consultant: CTJV (JV of Chiyoda and Technip).

Contractor:DODSAL ENGINEERING & CONST.PTE LTD

Duration: SEPT 2007 to Sept 2008

Post: SENIOR CONSTRUCTION ENGINEER PIPING. (Mechanical)

Role:

As Sr. Piping engineer in the field engineering dept. responsible for total supervision and site management, also responsible to report day to day erection progress including future erection plan.

Awarded for successful and safe completion of piping including insulation activities in RGX2 Project.

Interact with client for progress, technical matters and safety issues.

To carry out weekly safety meetings and to join safety walks through.

Management of material in-put to the site in time.

To ensure all the work is being carried out as per the given schedule and requirement of drawing, quality and safely.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Fire Water Ring Main Network, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Overflow Tank Transfer Pumps, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Induceed Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

To ensure all the work is being carried out Painting/ Insulation & Fire Proofing Works.

To ensure all the Radiography work is being carried out as per the given schedule and requirement of Class : CS/SS/SDSS/CLADDING/ALLOY/CU-NI PIPE NDE (SHOP & FIELD) RT %, MPI %, UT%, HARDNESS%, PWHT, CLEANING & PASSIVASION as per percentage wise.

Title: Dolphin onshore Gas plant project, Qatar

Client: JGC Corporation ltd

Consultant: JGC 12/2006 to 09/2007

Contractor: DODSAL ENGINEERING & CONST.PTE LTD

Post:CONSTRUCTION ENGINEER PIPING (Mechanical)

Role:

Piping Engineer Looking after piping Fabrication viz.material requirements, job allocations.

Monitoring the progress daily / weekly / monthly.

Co-ordination with client and test pack clearance for completing of systems as per piping and instrumentation drawings with clients, design deviations and technical issues.

Preparing for bill of materials.

RFI (Request for information) reporting of daily progress.

Planning for Fabrication and erection of all type of U/G, A/G Piping& Structural.

I have handled all engineering activities related to fabrication and erection with systematic planning.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Fire Water Ring Main Network, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Anode Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

Title: OGD-III- Project at Hubshan in Gasco near Abu Dhabi

Client: BECHTEL, UAE.

Contractor : LAHOUD ENGINEERING, DUBAI

Duration: JUNE 2006 to SEPT 2006

Post:CONSTRUCTION ENGINEER PIPING.(Mechanical)

Role:

Piping supervisor preparation of job schedule, resource requirements like project materials, consumable requirement, equipment and manpower for piping job.

Planning for daily activities & monitoring the target.

Deployment of man power and monitoring the Productivity.

The control over fabrication of piping spools / supports and erection.

Co-ordination with client for design deviations and technical issues.

Preparation of daily activities/project material and technical requirement, planning for Fabrication and erection of piping/pipelines.

I have handled all engineering activities related to fabrication and erection with systematic planning.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Fire Water Ring Main Network, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Anode Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

Title: Central Processing Plant and Well Piping in ADCO- North East Bab Development Project / Rumaitha Oil Fields near Abu Dhabi (U.A.E)

Client: TECHNIP,

Contractor: Lahoud Engineering, Dubai

Duration: JUNE 2005 to APRIL 2006

Post:CONSTRUCTION ENGINEER PIPING (Mechanical)

Role:

As Site supervision for fabrication and erection of piping and ETR/ITR for 11 no's of clusters and 21 no's remote wells.

Excellently handled all site activities with professional knowledge of fabrication and erection in respect to client prospect.

Supervised/handled more than 40,000 man hours.

Adopting a flexible and open approach towards the needs of projects.

To ensure all the work is being carried out as per the given packages System & Sub-System wise Potable Water Distribution, Recovered Oil Drum, Fire Water Ring Main Network, Deluge Skid & Spray System, IA Distribution, PA Distribution, Sludge Separator, Skimmed Oil Drum, Fuel Gas Distribution, Diesel Storage & Distribution, Flare System, Lube Oil Package, Co2 Package, High Pressure Pump Package, Anode Gas (Nitrogen) Package, Cooling water System, Boiler Packages.

Title: Dubai Electricity and Water Authority (DEWA) Desalination Plant (U.A.E)

Consultant: Fiscia Italian Pianti

Contractor: LAHOUD ENGINEERING, DUBAI

Duration: DEC 2004 to JUNE 2005

Post:CONSTRUCTION ENGINEER PIPING (Mechanical)

Role:

As Sr. Piping supervisor preparation of job schedule, resource requirements like project materials, consumable requirement, equipment and manpower for piping job.

Planning for daily activities & monitoring the target.

Deployment of man power and monitoring the Productivity.

The control over fabrication of piping spools/supports and erection. Co-ordination with client for design deviations and technical issues.

For fabrication and erection ofPiping.

Excellently handled all site activities with professional knowledge of fabrication and erection in respect to client prospect.

Title: Kestrel Project of Dubai Aluminium Company (DUBAL) Dubai, UAE.

Client: Alstom Power Turbo-Systems

Contractor: LAHOUD ENGINEERING, DUBAI

Duration: MAR 2004 to DEC 2004

Post: CONSTRUCTION ENGINEER PIPING. (Mechanical)

Role:

For erection of one 150MW combined cycle Steam Turbine at Kestrel Project of Dubai Aluminium Company.

Ensure that as built drawings and certification documents are issued in due time.

Participate in safety audits and reviews.

Ensure compliance of the work with the project’s design and applicable Company and international standards.

Specialization in turbine piping with Lube Oil piping erection.

Title: Hindustan Petrochemical Ltd, (India, Mumbai)

Consultant: HPCL

Duration: 12/1998 to 10/1999

Contractor: PUNJLLOYD LTD

Post: CONSTRUCTION ENGINEER PIPING. (Mechanical)

Role:

Piping engineer for fabrication and erection of piping.

Brilliantly completed all piping related activities with top most perfection and ultimate use of all resources, with respect to time run delays.

Review and appraise the quality of the work and monitor the progress and the reporting with particular regards to the daily time sheets verification.

Title: Samsung Engineering Co. Ltd (Nagothane) IPCL

Consultant: EIL

Duration:02/1998 to 07/1998

Contractor: LARSEN & TUBRO LTD ECC GROUP

Role:

Piping engineer for fabrication and erection of piping.

Brilliantly completed all piping related activities with top most perfection and ultimate fabrication supervision about 12,000 inches dia, Erection about 16,500 inch mtr.

this includes C.S/S.S/LTCS and IBR pipes.

Successfully executed testing of pipes for the expansion of LLDPE/HDPE Plant at M/S Indian Petrochemical Corporation Ltd., MGCC Nagothane.

Title: Bharat Petroleum Ltd

Consultant: EIL

Duration:01/1996 to 02/1998

Contractor: LARSEN & TUBRO LTD ECC GROUP – Mumbai

Post: CONSTRUCTION ENGINEER PIPING. (Mechanical)

Role:

Site management for fabrication and erection of piping.(BPCL)& (IPCL) project India, Excellently completed the task of fabrication and erection with Respect to milestone requirement with ultimatum usage of given resources.

Piping fabrication about 120000 inches dia, erection about 160000 inch mtr.this includes CS/SS/IBR and Alloy steel pipes.

Executed testing of pipelines Pre-commissioning activities for Hydrogen Plant.

Title: Reliance Industries Ltd. For CP6/CP7/PTA/RTC Project

Consultant: RELIANCE INDUSTRIES LTD

Duration: 05/1994 to 12/1995

Post: CONSTRUCTION ENGINEER PIPING. (Mechanical)

Role:

Piping engineer for fabrication and erection of piping.

Brilliantly completed all piping related activities with top most perfection and ultimate use of all resources, with respect to time run delays.

For Oil Tank repairs, Piping Modifications & L.S.H.S., Boiler Piping Works, PFY/PTA/LAB)PX/UTILITY/BOILER All Units Piping Works.

Columns, Tray replacements for special shutdown activities for piping modifications, PSV/Control valves/Gate valves/Ball valves/Heat exchanger/Cool Exchanger cleaning and Re-installation successfully.

Education

Bachelors Degree: Mechanical Engineering, 2002

Global Institute

Mechanical Engineering

Diploma: Mechanical Engineering, 1998

Global Institute

Mechanical Engineering.

Bachelor of Science (B.SC Pass): 1995

University of West Bengal

High Secondary Education (H.S Pass): C.R.G.S High School (W.B), 1992.

Madhyamik Secondary Education (M.S.E.B Pass): C.R.G.S High School (W.B) 1990.

Technical Qualification: Trained and Worked in Construction 3D Modelling and NAVIs Works Quality Control & ISO 9000

Computer BASICS (MS-CIT), Data sheet Preparation, Caesar II engineering software

Summary

I am highly motivated, contractually astute and focused Construction Manager, with excellent communication and man management skills, with extensive experience in construction, shutdowns and hook ups of onshore and offshore Oil and Gas facilities, Oil Refineries Piping and Pipelines, experience as RSES (Responsible for Safety, Environment and on Site) the management of construction and pre commissioning activities, with multi-cultural contractors and workforces, with excellent project interdisciplinary interface and coordination experience, my key responsibilities being Safety, Quality and Progress. Worked in EPC Oil & Gas (Hydrocarbon) /LNG/ Upstream/ midstream/Petrochemical & Power Sector, Project Management, Piping/Pipeline Fabrication& Erection, Structural Erection, Pre-Commissioning for Past 24 Years. (Middle East Experience - 15 Years) Such as Oil & Gas sector for the EPC of Flow line, Export line, Cross country, City Gas Distribution Pipeline, Process Piping & Well pad Piping Review the Mechanical drawings reports and specifications. Career Vision Seeking challenging assignments preferably in Project Management, Piping, Infrastructure, Construction, Petroleum, EPC/EPIC, Mechanical (HVAC, Drainage, Water Supply), Installation, Operations, Process and Module with a growth oriented organization so that I can apply everything I have learnt and help the company grow.

Personal Information

Bhuban Moy Banerjee

Marital: Married

Fathers Name: Late Tulshi Das Banerjee,

Date of Birth: 12thMay. 1968,

Residential Address: Moraj Residency Kasturi CHS, Flat.101, Wing D2, Palm Beach Road, Sector 16, Sanpada, 400705 Navi Mumbai (INDIA).

Permanent Address: Tulshi Das Banerjee, At -Chatterjee Para, Post- Beldanga, District Murshidabad West Bengal, Pin -742133.

Passport No.: R0197276

Passport issued: Validity from 04-05-2017 to 03-05-2027.

Nationality: INDIAN (HINDU)

Gender: Male

Highlights

Excellent leadership for Piping/Pipeline supports and Structural, Fabrication & Erection day to day planning.

Vibrant Knowledge in Mechanical & Welding Inspections.

Excellent Knowledge with Piping/Pipeline (METALIC/GRE/PVDF/GRP/CPVC) &cross country pipe lines.

Splendid Knowledge with shut-down tie-ins in context to time management and manpower handling.

Professional diverse knowledge in Testing of piping/pipelines.

Comprehensive knowledge for Mechanical & Welding Inspections.

Familiar with ASME, API, ASTM Codes.

Excellent Communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.

Familiarity with P& I Diagrams for Oil and Gas Projects and usage of Caesar II engineering software.

Sound knowledge in PMS / VMS. Test Pack Preparation / HT / Box Up / MC / Pre Commissioning Activities.

Good knowledge in WPS / Pre Heat / PWHT / Various NDT techniques / Holiday Test / Valve Test / Bolt Tensioning.

Good at Execution strategy / Constructability study & Sequence of Activities / Planning & Scheduling / Productivity Norms of Piping works.

Skills

3D API approach, C closing, Excellent Communication, Interpersonal skills, Cost control, Cost reduction, DEC, Directing, Engineering activities, Environmental Management, Inspection, Insulation, Team building, Leadership, Material management, organizational problem solving, Project Planning & Management, Quality Management, Quality Control, repairs, reporting, Safety, Scheduling, Strategy, supervision, time management.



Contact this candidate