RESUME
P.SARFRAZ AHAMED B.E (EEE)
Email : *******@*****.***
Mobile & Whatsapp: +974-********
Position : Electrical Engineer
License : Valid Qatar Driving License
OBJECTIVES
To attain a high caliber career in Testing and commissioning & Installation, Cable Laying and Termination team in your organization that offers security and professional growth while being resourceful, innovative and flexible. RESUME SUMMARY
5 years of experience in Electrical Installation &Testing and Commissioning field of various Modification, Testing protection & switch Gear schemes, Cable Laying & Termination.
EDUCATIONAL QUALIFICATION
B. E. Electrical and Electronics Engineering in PRCET with FIRST CLASS, Thanjavur (Anna University, Chennai)
DIPLOMA Electrical a n d Electronics Engineering in PRPC,
(Directorate of Technical Education, Chennai)
CERTIFICATE COURSE
· Diploma in Electrical CADD
· HARDWARE AND NETWORKING
· Diploma in office management
Appreciation certificate
CERTIFICATE TITLE : MOST ‘RESULT ORIENTED’ PLAYER
Project : NPP-067
Company : Winstar Electromechanical Works.
Description : Installation, Testing & Commissioning of MDRC & PIC Substation
WOR KING EXPERIENCE SUMMARY
CURRENT EMPLOYER
Company : Winstar Electromechanical Works w.l.l. Qatar Designation : Testing and Commissioning Engineer & Store Coordinator Department : Power Systems –Substation and Switch Gear, Testing and Commissioning, Installation Duration : January 2016 –to TILL DATE
PREVIOUS EMPLOYER
Company : Zoultech Engineering services Ptd ltd
Designation : Junior Engineer
Department : Power Systems –Substation and Switch Gear, Testing and Commissioning Duration : July 2013 –to January-2016
PROJECTS
US ARMY CORPS- site 3, site 2, site 1
CLIENT NAME : US ARMY CORPS
CONTRACTOR : AL SEAL
CONSULTANT : PARSONS
Responsibilities
Designation: Electrical Engineer
Site: Buildings & 11/.415 kV substation
1. Cable Schedule Preparation
2. Panel Board Testing.
3. Earth Pit Testing
4. Small Power Checks
5. Lux & Socket Testing
6. Small Power Cables
PIC 22/.415 kV SUBSTATION,
MDRC 22/.415 kV SUBSTATION,
CLIENT NAME : NPP-067
CONTRACTOR : SALAM TECHNOLOGY
CONSULTANT : LYSIS, AECOM
Responsibilities
Designation: Project Engineer
Site: MDRC & PIC In NPP 067
1. Cable Schedule Preparation
2. Documentation
3. Cable Measuring & Cutting as per Site Status.
4. Cable Laying & Termination within Time.
5. Fiber Optics cable Laying.
6. Communication Cable like RS485 &CAT-6
BIRKAT AL AWAMER 2-132/11 kV SUBSTATION,
BIRKAT AL AWAMER 4 -132/11 kV SUBSTATION,
BIRKAT AL AWAMEER_1-132/11 kV SUBSTATION,
CLIENT NAME : KHARAMAA
CONTRACTOR : NCC
CONSULTANT : WSP
BOULEVARD-1 66/11 kV SUBST ATION,
CLIENT NAME : KHARAMAA
CONTRACTOR : ABB
CONSULTANT : HALCROW
RAYYAN SOUTH 66/11 kV SUBSTATION
CLIENT NAME : KHARAMAA
CONTRACTOR : SIEMENS
CONSULTANT : MottMac donald
NEW PORT 22 kV DISTRIBUTION SUBSTATIONS,
SUBSTATION : CONTAINER TERMINAL 1 SUBSTATIONS
CONTRACTOR : CCC
CLIENT NAME : NPP 0026(HAMAD PORT)
CONSULTANT : AECOM
NEW PORT 22 kV PACKAGE SUBSTATIONS,
SUBSTATION : 13 INTERCONNECTED SUBSTATIONS
( LS01, LS02,LS03,LS04,LS05,LS06,LS07
LS08, MGN, MGS, PWPS, STP01,STP02 )
CONTRACTOR : CCC
CLIENT NAME : NPP 0026(HAMAD PORT)
CONSULTANT : AECOM
NEW PORT 22 kV DISTRIBUTION SUBSTATIONS,
SUBSTATION : 4 INTERCONNECTED SUBSTATIONS
( CTGS, CTWS,CTAS,CTFS)
CONTRACTOR : CCC
CLIENT NAME : NPP 0026(HAMAD PORT)
CONSULTANT : AECOM
KIT HANDLING
· INSULATION RESISTANCE KIT (MEGGER,CA,FLUKE)
· CT ANALYZER (OMICRON)
· CPC 100 (OMICRON)
· CMC 356, CMC 256 (OMICRON)
· PRIMARY INJECTION KIT (ODEN)
· B10E (MEGGER), SVERKER 750,780, (Single phase Injection kit)
· EGIL (Circuit Breaker Analyzer)
· MOM KIT (Contact Resistance Measurement)
· OIL CIRCULATION BATH KIT USING POWER TRANSFORMER GAUGE CALIBRATION (WTI & OTI)
EXECUTED WORKS- Testing Engineer
· Cable schedule preparation
· Scheme checks, Modification & Red marking
· AC/DC Checks
· Testing of Switchgear Equipment’s such as, Current Transformer, Voltage Transformer, Circuit Breaker,
· Circuit Breaker CRM, TIMING and Insulation Resistance test and CB scheme checking.
· Secondary Injection for Current transformer & Voltage transformer
· Testing of protection Equipment’s like Auxiliary Relays
· Functional Checks & interlock checks, B I checks
· BCU Synch Checks
· Electrical and mechanical operation of DISCONNECTOR, EARTH SWITCH & CIRCUIT BREAKER
· Testing of OTI & WTI Calibration in power Transformer, Auxiliary transformer.
· Documentation( NOSP)
EXECUTED WORKS: STORE CO ORDINATOR
Arrange The Testing Kits As per site Requirements.
Ensure the Equipment Calibration & Sent to the Equipment for Calibration.
Documentation.
EXECUTED WORKS: PROJECT ENGINEER
Work schedule preparation.
Assist in the supervision, scheduling and checking of work of project team members and work closely with other disciplines activities.
Provide general technical support and assist in development of Erection and testing activities.
Ability to work in and foster a strong team environment with minimal supervision.
Good performance management skills.
Problem solving skills with ability to analyze and recommend solutions on problems. Personal Details:
·
·
Father’s Name :
Date of Birth :
Packir Mohamed
25th march1990
· Gender : Male
· Marital Status : Married
· Nationality : Indian
· Religion : Muslim
· Language Known : English, Hindi, Tamil
· Passport no : L7739882
· Driving License : Qatar License (CAR) (manual)
Declaration:
I hereby declare that the above mentioned information is true and correct to the best of my knowledge.
(Sarfraz Ahamed.P)