Post Job Free
Sign in

Engineer Project

Location:
Fereej Ibn Dirhem, Qatar
Posted:
June 28, 2020

Contact this candidate

Resume:

Resume’

Hamid Umer Khan (AMICE)

CH*M, **th Floor, Al Reem Tower,

P.O Box. 22798, West bay Doha, Qatar

Cell: +974-****-****

+92-300-***-****

Email: add5vb@r.postjobfree.com

add5vb@r.postjobfree.com

Career Objective:

To use my skills, experience and adaptability to obtain a systems administration, engineering or programming position where I am constantly challenged. My greatest strength is my ability to walk into a new environment and be functional immediately. I am quick to learn and adapt to new situations, configurations and technologies. Educational Qualification

In Progress M.Sc. Commercial Mgmt. & QS Heriot Watt University, UK 2012 Bachelor of Technology (Hons.) Civil Sarhad University, Peshawar 2001 Diploma in Architecture (DAE) Govt. College of Technology, Lahore 1995 Secondary School Certificate (SSC/Metric) Shaukat Model High School, Gujrat Certificates / Diplomas

2002 Dip. Computer Hardware Engineering Petromen Institute, Lahore 2001 Cert. Oracle Certified Professional (OCP) Oracle Corporation, USA 2001 Dip. Electronic Commerce (e-Commerce) Royal Institute of Computer Science, Lahore Workshops/ Seminars/ CPDs

2018 - Resolving disputes without conflict RICS CPD

- Notices, time bars & contemporary records RICS CPD 2017 - Disruption in Construction Project RICS CPD

- Effective presentation of delay analysis in an RICS CPD interim/ final EOT submission

- Construction Safety Awareness CH2M Hill Training 2008 Price Adjustment in Construction Pakistan Engineering Council, Islamabad 2007 Construction Management Pakistan Engineering Council, Islamabad Membership

In Progress RICS ID-6747465 Royal Institute of Charted Surveyors (RICS, UK) 2018 PE.Tech/CIVIL/00118 National Technology Council (NTC), Pakistan 2017 AMICE ID-86899293 Institution of Civil Engineers (ICE, UK) Technical Skills

• MS Office • AutoCAD • Primavera (R6)

• 3D Studio Max • CostX (Advanced)

Key Skills

• Take care of the financial and contractual aspects of the project

• Participate, record and prepare the minutes of the progress meetings

• Provide support on all financial and contractual matters throughout the work in the project

• Ensure prompt submittal and completeness of Contractors monthly payment

• Advise the SRE and REs on measurement procedures and calculation of interim and final quantities

• Evaluate the unit rates for new work items

• Preparation of variation orders

• Prepare financial statements for monthly report

• Check and record measurements of completed work

• Prepare Final Account with all supporting documentation Professional History

January 08, 2017 – May 31, 2020

Jacobs Engineering Group (Jacobs), Qatar

Quantity Surveyor

Projects

• Design and Construction of Main Trunk Sewer (Contract MTS-01)

The Project is “Design and Build of the Inner Doha Re-sewerage Implementation Strategy

(IDRIS), Main Trunk Sewer, Northern Branches”

The Project comprises the first segment of the MTS and is divided into Three (3) branches which are located along the roads in the southern part of Doha

The work includes the Design and Construction of the Main Trunk Sewer (MTS) associated access shafts and hydraulic connections thereto

Project Cost (QAR): 964.669 Million

• Design and Construction of Lateral Interceptor Sewers (Contract LIS-01)

The Project is “Design and Build of the Inner Doha Re-sewerage Implementation Strategy

(IDRIS), Lateral Interceptor Sewers (LIS-01)”

The Project comprises the design, execution, completion and remediation of defects of LIS Network in Central Doha which connects to MTS at Seven (7) locations

Project Cost (QAR): 1.082 Billion

Responsibilities

• Preparation of Bill of Quantities (BoQs) for new tenders

• Evaluation of Contractor’s Tender

• Preparation/ Checking of Monthly Payment Certificates (IPC)

• Preparation of Change Requests and Site Instructions (CR/SI)

• Preparation of Variation Orders (VO)

• Preparation of Weekly and Monthly Project Cost Status Report

• Preparation and maintenance of Material on Site and Material off site record

• Preparation of Final Account Settlement for completed and terminated contracts

• Preparation of Contractual letters and Other Contract Documents

• Other miscellaneous works entrusted by the Management September 22, 2013 – September 15, 2016

Parsons International Limited, Qatar

Quantity Surveyor

Projects

• Construction and Upgrading of Infrastructure of Al Muntazah Street Extension Project (P-012)

Project Cost (QAR): 2.333 Billion

Total Length of Project: 9 Km.

Flyovers: 3 Nos. with length of 4,864m

Underpasses: 5 Nos. with length of 2,958m

Underpass Bridges: 3 Nos. with length of 366m

Tunnel: 1 No. with 668m

• East Industrial Road Interchanges at Inter Sections with Street 10 and Street 23 (P-006)

Scope of work includes the upgrading of the existing East Industrial Road with construction of two signalized grade separated interchanges along the East Industrial Road and two overpass bridges along the mainline at its intersection with Road No. 10 & 23

Project Cost (QAR): 226.050 Million

Total Length of Project: 3.5 Km.

Bridges: 2 Nos.

Responsibilities

• Preparation of Cost Estimates and Deviation Requests (DR)

• Preparation of Change Requests and Site Instructions (CR/SI)

• Preparation of Variation Orders (VO)

• Preparation/ Checking of Monthly Payment Certificates (IPC)

• Preparation of Monthly Project Cost Status Report

• Preparation and Updating the Tracking Log for Correspondence, Change Requests/ Site Instructions and Variation

• Preparation/ record minutes of meeting

• Preparation of Final Account Settlement for P-006 Project

• Assisted to Sr. Quantity Surveyor for preparation of Contractual letters and Other Contract Documents

• Other miscellaneous works entrusted by the Sr. Quantity Surveyor and Management April 15, 2010 – September 15, 2013

Bilal Contracting & Transport, Pakistan

Contracts / Quantity Engineer

Responsibilities

• Preparation of Pre-Qualification & Post Qualification Documents for different Departments such as Byco Oil Company, Water and Power Development Authority (WAPDA) in Gilgit Baltistan and Azad Jammu Kashmir, State Life Insurance Company, National Highway Authority (NHA), Sialkot International Airport Extension etc.

• Taking off Quantities from Tender Drawings for Tenders using MS Excel and AutoCAD

• Preparation of Interim Payment Applications / Statements including Measurement Sheets of all executed items using MS Excel and AutoCAD

• Preparation of Bar Bending Schedules

• Preparation and Calculation of all kinds of required materials for arranging Finance and placing the order

• Preparation of supporting drawings for IPAs using AutoCAD

• Preparation of Monthly Escalation Bill

• Preparation and Evaluation of Variations, Additional Works based on fresh Market Rates

• Preparation of Compensation, Delay Payments and Extension of Time Claims

• Evaluation and Certification of Sub Contractors Bills

• Preparation of Contractual letters under FIDIC and Other Contract Documents

• Other miscellaneous works entrusted by the Management April 04, 2007 – April 14, 2010

S. Zia ul Haq & Sons, Pakistan

Contracts / Quantity Surveyor

Responsibilities

• Preparation of Pre-Qualification & Post Qualification Documents

• Preparation of Tenders for different Departments

• Preparation of Monthly Interim Payment Applications / Statements

• Preparation of Monthly Escalation Bill

• Preparation of Bar Bending Schedules

• Preparation of Sheets for required materials

• Preparation of Claims of Stoppage of Works

• Assist the Contract Manager to prepare Contractual letters under FIDIC and other Contract Documents As Quantity Surveyor the following projects were under my responsibilities:

• Construction of Officers, Staff and Worker Colony of Oil & Gas Development Company (OGDCL), in Shakardara, Kohat, and

• Construction of Head Quarter Multi-Storey Building of Chaklala Cantonment Board, Rawalpindi right from receiving the Letter of Acceptance till to completion of Projects. I prepared Mobilization Advance Bill, Monthly Interim Applications / Statements, Evaluation of Variations and Additional items on fresh Rate Analysis for new items etc.

March 07, 2005 – March 31, 2007

Pakistan Motorway Consultant (M-I)

Quantity Surveyor

Responsibilities

• Checking / Verification / Certification of IPC

• Preparation of Variation Order (VOs)

• Preparation and updating of Monthly Payments Status

• Checking of Bar Bending Schedules

• Checking / Verification of Quantities of Earthwork using AutoCAD and MS Excel

• Checking / Verification of General Items

• Checking / Verification of Monthly Escalation

• Preparation of Rate Analysis of different items

• Other miscellaneous works entrusted by the Chief Resident Engineer (CRE), Contract Specialist and Chief Quantity Surveyor

December 18, 2002 – February 28, 2005

Pakistan Motorway Contractors Joint Venture (M-I)

Asstt. Quantity Surveyor (Later on Promoted as Quantity Surveyor) Responsibilities

• Preparation of Measurement Sheets for different Items using AutoCAD and MS Excel

• Preparation of General Items

• Assist Incharge Quantity Section to prepare Monthly Payment Statement

• Preparation of Variation Order (VOs)

• Preparation of daily Progress Report

• Preparation of Monthly Escalation Claim

• Preparation of Rate Analysis of different items

• Other miscellaneous works entrusted by the Technical Manager (TM), Contract Manger and Incharge Quantity Surveyor.

Personal Information

Date of Birth: August 18, 1979

Gender: Male

Marital Status: Married with 5 Kids

Nationality: Pakistani

Passport No. XR4109232

Issue Date: November 27, 2012

Expiry Date: November 26, 2022

Medical Problem: Nil

Willing to Relocate: Yes

Permanent Address: Kashana-e-Khilji, Near Jamea Masjid Noor, Noorpur Sharqi, Gujrat, Pakistan

Signature:

Date:



Contact this candidate