E-mail : ******.**********@*****.***.** DHANUSKODI PRABU
Mob : 009**-******** ENGINEER-Electrical Installation & Maintenance Page 1 of 6
Personal Details
Date of Birth: 02 May 1982
Nationality: Indian
Passport No: R4732054
Skype: prabunishanth1
Academic Qualification
1.Bachelor of Electronics
and Communication.
Engineering.
Vikram College of Engineering
Anna university, India, April
2005.
2.Diploma in Electrical and
Electronics Engineering
KLN Polytechnique (AICTE Delhi)
India.2002
CARRER SUMMARY
Quality driven Electrical Engineer with around 14.8 years of experience as a Project Engineer, Electrical Engineer in Rail Electrification, HV /LV Substations, strategize and act with focused effort to achieve objectives.
Core Competencies
Able to develops High Voltage substation deliverables including single line diagrams, control schematics, substation layouts, earthing and bonding layout,
Experienced in HV/EHV/LV/Signaling cable system, Installation testing and commissioning, including hand over of Power cables & Accessories up to 220KV level.
Experienced in 750 V DC Traction systems, Installation testing and commissioning, including hand over.
Established track record in Project Management by effective collaboration with key stakeholders, during the Installation, Testing and commissioning and handover of work.
Able to work independently and in team environment with minimal supervision
Electrical and Mechanical Installation from Tunnel Ventilation Systems, Telecommunications Systems and Power Supply Equipment’s
Responsible for all aspects of the installation documentation for the Wayside Systems in the Tunnel, the Elevated Sections and the Depot facilities to include civil interface and installation coordination
Ability to interact with customer and project team in a professional manner.
A proven flexible problem solver with project delivery experience.
Proactive, can do attitude and prepared to take the initiative.
Experienced Quality Engineering & Internal Auditor Skills
Electrical Engineering (Installation) Substation Engineering Rail Engineering Maintenance
Project Management QA/QC Engineering
EHV, HV & LV Cable Engineering Electrical & Mechanical Installation Testing and Commissioning Microsoft Office & AutoCAD. Integration & Coordination Internal Audit & tendering Selected Achievements: -
Got an appreciation award from SIEMENS Doha Tram Project for my contributions and the resultant integrated teamwork that led to the success of the project. (Attached)
Successfully completed the Power, Signaling & Telecom system Installation, testing and Commissioning on the $36 Billion+ Doha Metro program Qatar consulting for Parsons for Qatar Rail on time. Encompassing 37stations, 164km of tunnel, depots and underground stabling and maintenance buildings at grade and elevated track.
Installation of Traction transformers,750V DC SCADA and 11/22/33KV switchgears, Rectifier and Inv panels
Successfully snagged and inspected corrective measures taken for power, signaling and telecom system for Doha metro.
Successfully completed all the tasks assigned during the period of secondment to contractor in Doha Metro.
Successfully delivered the system requirements i.e. AFC gates, Emergency Exit
(BB2) doors, Emergency Call system and Public announcement system interface and functionality with fire alarm and Building automation and control system E-mail : ******.**********@*****.***.** DHANUSKODI PRABU Mob : 009**-******** ENGINEER-Electrical Installation & Maintenance Page 2 of 6
SIEMENS, QATAR
1.Aug-2019 to Present
Project Electrical
Engineer-REL
(BACS) as per Qatar Civil defense departments (QCDD) requirements related to Underground and above ground Station, Emergency exits and Tunnels.
Successfully reported and monitored the corrective action taken to make sure the egress routes in the tunnel is compliant with NFPA-130 standard.
Successfully completed all coursework and requirements of the PACE Quality Management Program organized by Systra /Parsons (approved as an authorized Provider by the International Association for continuing Education and Training.
Successfully completed the Signaling & Telecom & Electrical system installation in Downtown Line (1,2& 3) Project Metro Lines Singapore.
Successfully completed the Electrical system installation in Kochi Project Metro Lines.
Work Experience
Project 1: QEC People Movers System (PMS -TRAM), Qatar. Description: Installation, Execution and Commissioning of Light Rail People Movers Tram system.
Responsibilities:
Leads a team of electrical engineering and Installation, Execution, produced project documentation including SLD’s, substation layouts, cable schedules, Technical specs, Installation of Power equipment, cable works and termination
Coordinate Civil, Architectural (Branding), Systems & MEP design activities and deliverables (Including BIM), Provide analyses and recommendations where required
To ensure / support that electrical work items are effectively implemented into the works and in compliance with respective standards.
To provide recommendations on RFC’s or if required themselves to issue RFC’.
Location marking and installation of Track side (WRU, Antenna, Speaker, Camera etc.) equipment and Prepare Work schedule
Plan, organize, and Manpower planning, Tools management & transport arrangement to ensure train availability and equipment performance meet the set targets.
Traction power cables laying and termination Involved in Measurement of stray current of rail system, Prepare the report for Installation and commissioning
(equipment, cable). Cable Management System including cable tray, trunking, troughing, cable segregation & Cable specification and procurement approvals.
Manage and be accountable for the Wayside Site Team for all aspects of their activities
Ensure that site safety processes are implemented in accordance with the HSE Manager requirements
Proactively interact and interface with Civil/MEP Contractor, subsystem teams, subcontractors, the Employer, the Employer’s Representative and any third parties for the execution of the project as necessary.
Ensuring information is recorded and controlled for the implementation of Interface documents (ICD)Responsible for installation of various telecom sub-systems: -CCTV, Passenger Announcement System (PAS), Voice and Data Radio (TETRA), Local Access Network (LAN), Time Distribution System (TDC), Telephony and PABX, Emergency call system (ECS), Passenger Information and Entertainment System (PIS and PES), Fire Alarm and detection system (FDAS).
Lead the Physical Installation team (Metal work, Equipment, Termination, Cable laying, Earthing Supervisors and Foremen) to estimate Material Requirement for installation, Coordinate the Overhead Catenary system and Rigid Catenary System.
Ensure that the quality procedures, policies and instructions are in place and in compliance, review work practices for continuous improvement. E-mail : ******.**********@*****.***.** DHANUSKODI PRABU Mob : 009**-******** ENGINEER-Electrical Installation & Maintenance Page 3 of 6
Systra Ltd Qatar
(CONSULTANT)
From Jan -2018- July -
2019
Electrical Project
Engineer
Responsible for monitoring the company’s Installation team for timely completion of cable support system, Equipment Installation (Transformers, switchgears, generators, Cabling Works and Cable Termination Works in a daily basis, Responsible to do Quality Control and Assurance works
Prepare progress reports and submit to the company’s management, Prepare method statements & Review.
Track Power Systems Equipment faults, troubleshoot, and recommend corrective and preventive actions, manage contracts with external parties, where required.
Commissioning of Auxiliary equipment’s, ACDB, DCDB, battery chargers and battery bank. Primary and secondary injection for traction cables.
Stray current, Transfer Trip panel and 64P testing and commissioning.
Installation of Traction transformers,750V DC and 11KV switchgears, Rectifier and Inv panels
Present and escalate critical interfaces to management to ensure timely resolution.
Works closely with the Construction Management Team to assess the impact of identified interfaces on the delivery of construction work.
Performs interface engineering assessment and coordinates the review with other project team members to facilitate a comprehensive analysis.
Coordinate changes through Employers Instructions and maintaining traceability to Programme changes.
Provide support to compliance checking as per the Requirements Management processes and providing inputs to the design verification activities as well as the validation activities during the project testing and implementation stage.
Ensure System and Operational safety requirements (contract & derived) are adequately captured and addressed, then supported by the design verification evidence provided by the project design centers and other entities.
Identify and assist in managing non-compliances to Employer requirements or standards
Check items identified by the Implementation of Assumptions and Issues Management are verified and validated and reach timely closure.
Carry out procedural compliance audits during the design, procurement, construction, sub-system and system testing of the Project. Project 2: Qatar Doha Metro Rail Project Red, Green, Gold and Blue Line System Installation Testing Witness
Construction, Installation, Testing and Commissioning of HV substations (33 KV AC & 750 V DC)
Responsibilities:
Responsible for the Supervision of Energy equipment installation work for both Traction and Station Power supplies, starting from the 33kV AC Loops to the 33kV AC GIS Switchgear, 3 winding Traction Transformers, Rectifier, Inverter, Negative return panels, 750 V DC Switch gears, Stray Current Cabinet, Over Voltage Protection, DC traction cabling, Third Rail, Running Rail and all trackside cabling and earthing, Auxiliary Transformers 33KV /415 V AC, LV Switch Gears (Main Distribution Board), UPS, Battery Chargers. Battery Banks,
Provide weekly status reports to Project Management on work done, work planned and critical issues in accordance with the HTC Management Reporting Process
Assist in the verification process of Wayside requirements to the satisfaction of the Client.
E-mail : ******.**********@*****.***.** DHANUSKODI PRABU Mob : 009**-******** ENGINEER-Electrical Installation & Maintenance Page 4 of 6
Advanced Infrastructure
Engineering Pte Ltd
Singapore From May -
2013- Nov -2017
Electrical Project
Engineer
(For Siemens, Alstom &
Meiden)
Assembly, Installation and Commissioning of Third Rail and accessories (Either top and bottom collections) check the Energization and verification
Knowledge about midpoint anchor and Expansion joint, Insulation and Continuity test
Installation and Inspection of the track work, Negative bonding and Rail bonding, and Earthing also DLP
Performed Cable route survey, Preparation of Bonding scheme, layout drawings, Material Technical specs, BOQ’s and Electrical calculations comply with local and International standards to meet customer requirements
Attending to Inspection Requests (IR's) submitted by the contractor and take appropriate action in a timely manner.
Monitoring quality of works and assess the safety at site including health and environmental issues, ensuring compliance with contractual / QCS specifications and safety and health risk assessments.
Installation and Interface of Electrical Metal work, Equipment’s, Cable Laying, Termination and Quality of Energy installation & Commissioning works and assess the safety at site including health and environmental issues, ensuring compliance with contractual specifications.
Preparing surveillance reports for deficiencies of Energy installation work found at site and non- conformance reports (NCR) if required in view of the development of events.
Responsible on the final hand over of the project pertaining to the (Final Testing and Commissioning Acceptance, Operation and Manual, Snagging and De-Snagging) Project 3: Singapore Metro Project Downtown Line 1,2 &3, Red and Green Line 22 KV and 750 V DC and Auxiliary System Upgradation - Singapore. Description: Installation, Execution and Commissioning of Mass Rapid Transit System. Responsibilities:
Carrying out regular inspections of equipment delivery & installation activities in Substation and wayside cabling and equipment. Responsible for coordination, Installation and inspection of 22KV AC, LV and 750 V DC systems, 22KV GIS switch gears,750 V DC switch gears, Rectifier, Invertor and Distribution transformers and auxiliary subsystems, Responsible for coordination, installation and inspection of Auxiliary equipment’s of ACDB, DCDB, Battery Charger, UPS, Battery fuse boxes and Battery Banks and T&C. Maintaining and repairing power supply and distribution system in a rail and power utilities.
Design, quality and safety reviews where required, to provide recommendations on RFI’s, to provide recommendations on RFC’s or if required themselves to issue RFC’s.
Detailed technical review of design documents and makes recommendations. Check for completeness, constructability, areas of significant cost reduction, compliance with design intent, and completeness of information and confirm coordination of disciplines
(Including BIM), coordinate Civil, Architectural (Branding), Systems & MEP design activities and deliverables (Including BIM)
Assembly, Installation and Commissioning of Third Rail and accessories (Either top and bottom collections) check the Energization and verification, Knowledge about midpoint anchor and Expansion joint, Insulation and Continuity test.
Convene design related meetings and workshops requested and provide minutes of meetings. To conduct design progress and construction meetings, Lead and effectively minute meetings ensuring that agreed actions are followed up.
To conduct design progress and construction meetings, Lead and effectively minute meetings ensuring that agreed actions are followed up.
Interfacing and coordination work with subcontractor, SBST,LTA
Installation and Inspection of the track work, Negative bonding and Rail bonding, and Earthing also DLP, Knowledge about cover and bracket insulation test, Rail bonding insulation, continuity and contact resistance test. E-mail : ******.**********@*****.***.** DHANUSKODI PRABU Mob : 009**-******** ENGINEER-Electrical Installation & Maintenance Page 5 of 6
BS TRANSCOM PVT Ltd,
India From Dec 2010 to
Apr 2013 Technical
Manager
Assist in assuring project engineering processes are implemented and complied with Review and implementation of the Quality and System Assurance
Take part in project team meetings and prepare minutes as required. Ensure correspondence between HTC and GRC is managed in a timely manner
Work in conjunction with the Test and Commissioning Team as required
Ensuring all company safety, quality, environmental, commercial and project management procedures are followed as relevant to tasks undertaken.
Interact and interface with subsystem teams, subcontractors, adjacent contractors, the Employer, the Employer’s Representative and any third parties for the execution of the project as necessary Plan, organize, and Manpower planning, Tools management & transport arrangement to ensure train availability and equipment performance meet the set targets.
Knowledge of equipment and panel installation in ETTS, SCDC, VLD, LBS and DC panels in TPSS room.
Prepare the work schedule and execute work accordingly, Track power cables laying and termination, Cable insulation, Continuity check and Termination. (High Voltage and Low Voltage Cables)Ensure that the quality procedures, policies and instructions are in place and in compliance, review work practices for continuous improvement.
Prepare the report for testing and commissioning (equipment, cable).
Lead the MEP installation team (Metal work, Equipment, Termination, Cable laying, Earthing Supervisors and Foremen) to estimate Material Requirement for installation, Coordinate the Third rail Installation team.
Track Power Systems Equipment faults, troubleshoot, and recommend corrective and preventive actions, manage contracts with external parties, where required.
Responsible for monitoring the company’s Installation team for timely completion of cable support system, Equipment Installation (Transformers, switchgears, generators, Cabling Works and Cable Termination Works in a daily basis, Responsible to do Quality Control and Assurance works
Commissioning of Auxiliary equipment’s, ACDB, DCDB, battery chargers and battery bank. Primary and secondary injection for traction cables. Installation of Traction transformers,750V DC and 22KV switchgears, Rectifier and Inv panels. Stray current, Transfer Trip panel and 64P testing and commissioning.
Participate in project electrical work plan development, Progress and Construction meetings, Responsible for Installation of metal works for cable routing (HV & LV and control cables), Conduct QESH inspections with Safety Team at worksites and ensure closure of all findings Handle the various problems in the site. Preparation of As Built Drawings
Responsible for Manpower Planning and preparing for work schedules
Prepare, implement and control project plans in order to deliver specified outcomes for stakeholders in terms of safety, scope, quality, standards, budget, timeframes and customer expectations.
Generating the regular project documentations such as project schedule, progress reports, FAT invitation, milestone documentation etc.
Responsible for the overall maintenance and availability of Power Supply, Project 4: 11 KV Electrical & Mechanical Installation and Maintenance Description: Installation, Execution and Commissioning Electrical and Mechanical Equipment’s.
Electrical and Mechanical Installation, Testing, Commissioning, Operation Maintenance of 40MW Substation
Ensured the construction works are completed according to contract requirements, technical documentation, work plans, budgets, and schedules E-mail : ******.**********@*****.***.** DHANUSKODI PRABU Mob : 009**-******** ENGINEER-Electrical Installation & Maintenance Page 6 of 6
TOTALCOMM PVT Ltd,
India Feb 2007 to Nov
2010 Project Coordinator
BS TRANSCOM PVT Ltd,
India Oct 2005 to Dec 2006
Electrical Site Engineer
Project 5: 11 KV Power plant Installation & Maintenance Description; Installation, Testing and Commissioning of Electrical and Mechanical Equipment
Electrical and Mechanical Installation, including Operation and Maintenance of Electrical sub-station.
Project 6: 11 KV Power plant Installation & Maintenance Description: Installation, Testing and Commissioning of Electrical and Mechanical Equipment
Electrical and Mechanical Installation, including Operation and Maintenance of Electrical sub-station.
Training/ Certification:
Construction Safety Course for Project Managers.
Completion of Work-At-Height Course for Managers (WAHM) & supervisors.
Completion Certificate for Building Construction Supervisors’ Safety Course
(BCSS).
Completion of the course for QESH Integrated Internal Auditor Course.
Completion of Internal Audit (ISO 9001:2015 – Draft International Standard Overview).
Certificate of Attendance Improving Business Operations through Understanding ISO 9001:2008.
Internal Quality Audit of Quality Management System.
Completion of the course of Develop a Risk Management Implementation Plan.
NTTF Electrical Training Course.
Completion Certificate Fire Safety Training Programmed Certificate.
UPDA Certified - QATAR
Declaration:
I hereby declare that the above furnished information is true to the best of my knowledge.
Place: Doha, Qatar Yours Faithfully
Date: DHANUSKODI PRABU