CURRICULUM VITAE
KHYALIRAM KARODE MOB-883-***-****
B.E.(ELECTRICAL ENGINEERING) *****-*************@*****.***
PERMANENT ADDRESS:-
VILL BADUD (SANAWAD)
TEHSIL SANAWAD,DISTT KHARGONE (M.P)
CAREER OBJECTIVE
To utilize my potential and talent at every stage of my life and to achieve great success in life.
ACADEMIC QUALIFICATION
S.N
COURSE
NAME OF INST
BOARD/UNIVERSITY
YEAR OF PASSING
1
H.Sc.
Govt. higher secondary school
M.P board
1987
2
Diploma IN ELEC. ENGINEERING
Govt. Polytechnic
Sanawad
M.P board
1992
3
B.E. (ELECRICAL AND ELECTONICS ENGINEERING)
SPITM Mandleshwar
RGPV
2019
Electrical Supervisor Permit by MP Government
EXPERIENCE:- 28 years
JOB PROFILE :-HOD (electrical department) at vanshika sugar and power industries limited BILGUA TEHSIL TENDUKHEDA,DISTT NARSINGHPUR.
ACHIEVEMENT AND EXTRA CURRICULAR ACTIVITIES:-
(1) erection and commissioning,testing and trial of 2500 TCD sugar plant(JLN SUGAR KHARGONE M.P).
(2) knowledge of DC DRIVE,AC DRIVE/VFD,SOFT STARTER AND SLIP RING STARTER.
(3) maintenance of AC and DC MOTOR upto 600kw (LT/HT) and power and distribution transformer.
(4) installation and commissioning, testing and trial of GRID(upto 3.15MVA).
(5) knowledge of co-generation upto 13MW.
PERSONAL INFORMATION:-
DATE OF BIRTH : 7 AUGUST 1969
FATHER’S NAME : LATE PUNAJI KARODE
MOTHER’S NAME : SHRIMATI DWARKI BAI
NATIONALITY : INDIAN
LANGUAGES : HINDI, ENGLISH
I herby declare that the particulars furnished here in are to the best of my brief and knowledge.
KHYALIRAM KARODE
S.NO
NAME OF FIRM
LOCATION
DESIGNATION
FROM
TO
EXPERIENCE YEAR
1
m/s TR jaiswal “A” class electrical contractor
SENDHWA (M.P)
ELECTRICAL SUPERVISOR
20/11/1992
DEC 1995
3 YEARS
Repairing and rewinding of LT/HT motors and transformers,CT/PT and ACB and VCB.
Erection,installation,commissioning,trial,and testing of 11kv and 33kv line with 3.15mva sub station and also maintenance
2
Rama phosphates ltd
(Fertilizer division)
INDORE
Electrical supervisor
20/03/1996
20/04/1998
2 years
OPERATION AND MAINTENANCE OF33KV/0.433KV,1500KVA
SUB STATION WITH RTCC LT MOTORS UPTO 500HP (SR),4000 AMPERE ACB, PCC AND MCC AND ALSO 500KVA
DG SET WITH SYNCHRONISATION SYSTEM AND ALSO APFC PANEL.
Operation and maintenance of Turbo system,extraction type TURBINE (1500kva,make AVK)
3
Shankar cotton corporation
Sendhwa (M.P)
Assistant engineer
25/06/1998
11/04/1999
1 year
Operation and maintenance of HT substation (11KV,315KVA) with DG set,motor,MCC and PCC.
4
JLN SUGAR
sarwar devla
Assistant engineer
03/02/2000
27/10/2011
30/09/2010
28/09/2014
13 years
Erection,installation,commissioning,testing and trial of 2500TCD sugar plant (WIL)
Operatrion and maintenance of AC and DC motors,MCC,PCC,APFC,AVR(BHEL) with TURBO ALTERNATOR (3MW)
Operation and maintenance of DC DRIVE,DACS and PLC SYSTEM.
5
MANGALAM POWER ENGINEERING
KASRAWAD (M.P)
Site senior engineer
01/04/2014
20/07/2016
2 years
Erection,installation,commissioning,testing and trial of LT/HT line and sub station upto (2.5MVA) also shifting work.
6
NATURAL SUGAR AND ALLIED INDUSTRIES LTD
USMANABAD (M.H)
Electrical engineer
28/08/2017
25/03/2018
1 season
Operation and maintenance of AC/DC motors with their DRIVES upto 500KW.
Operation and maintenance of VFD,AVR’s of turbo alternators (23MW) and power and distribution transformers.
7
vanshikasugar andpower industries ltd
BILGUA (M.P)
ELECTRICAL CHIEF ENGINEER
27/3/2018
TILL DATE
2 YEAR
Operation and maintenance of AC/DC motors with their DRIVES upto 600KW.
Operation and maintenance of VFD,AVR’s of turbo alternators (2.5MW 2 set) and power and distribution transformers.