`
STRENGTHS
******************@*****.***
**, ******** ******, *** ******,
Alwarthirunagar, Chennai-600-087.
EDUCATIONAL BACKGROUND
2016-
INDUSTRIAL EXPOSURE
2020
(02-01-2020
To
28-02-2020)
Toshiba Machine India Private
Limited.
chembarambakkam,Tamilnadu-600-123
A two month Industrial project, based
on the design of an automated lapping
system
2022019
(06-05-2019)
To
(29-06-2019)
MFC Eram Liaison Office,
Chrompet, Chennai-600-044.
A two month Internship Project, in
Quality Department for Shoes .
B 82018
(04-06-2018)
To
(08-06-2018)
Ford India Private Limited,
Chengalpattu-603-204, India.
An one week In-plant training about the
automobile manufacturing and
assembly system
2017
(14-05-2017)
To
(20-05-2017)
Renault Nissan Automotive India
Private Limited,
Oragadam, Tamil Nadu-631-605
Necco Tools, Guindy,Chennai-600-032
G22017
(05-06-2017
To
08-06-2017)
F bAn one week In-plant training about
the automobile manufacturing and
assembly system
A one week In-Plant training about
basics of Manufacturing Technology
AREA OF INTEREST
Manufacturing Technology
Engineering Design
Total Quality Management
SOFTWARES KNOWN
Auto CAD (Intermediate)
Solid works (Intermediate)
C Programming (Intermediate)
Creo (Beginner)
Ansys (Beginner)
PROJECTS UNDERTAKEN
ACHIEVEMENTS
2016-2020 BACHELOR DEGREE
B.E.Mechanical Engineering
Loyola-Icam College of Engineering
And Technology(LICET), Chennai-600-034.
PERCENTAGE: 68%
2015-2016 H.S.C
St.John’s Matriculation Higher Secondary
School, Alwarthirunagar,Chennai-600-087
PERCENTAGE: 87.5%
2013-2014 S.S.L.C
St.John’s Matriculation Higher Secondary
School, Alwarthirunagar,Chennai-600-087
PERCENTAGE: 90%
Presented a paper on Process Improvement in Manual Lapping Process in 4th National Conference held at Meenakshi Sundarrajan Engineering College on 13th March, 2020. Presented a paper on A Fibre to the 4th held at Meenakshi Sundarrajan Engineering College on 13th March, 2020 and won Second Prize
Received a certification of appreciation from the Placement Training team(FACE) Quoting” STOOD OUT FROM THE
CROWD”
Design and Fabrication of “Garbage Collecting Machine”
“A mechanically operated Garbage collecting Machine was designed and fabricated, in order to give hands to the Sanitary workers” DURATION: 3 Months (Jan 2019 – Apr 2019)
Design and Analysis of “Pneumatic Automated Lapping machine”
“ A Pneumatically controlled Lapping machine was designed to provide surface flatness and air tight seal between the parts of suction flange cover assembly, of the Injection Moulding Machine” DURATION: 2 Months (Jan 2020 – Feb 2020)
VARIOUS ROLES PERFORMED
Class Representative for the Mechanical Department(2016-2020)
LEADERSHIP DETERMINATION
DISCIPLINE
DEDICATION