Post Job Free

Resume

Sign in

Project Manager Air Force

Location:
Addison, TX
Salary:
100,000
Posted:
April 17, 2020

Contact this candidate

Resume:

Gary L. Hutto

405-***-**** adcuqj@r.postjobfree.com

Summary of Qualifications

Experience: 35+years of major and general building construction, layout, site work and on project manager in all phases. See attached specifics of experience.

Results: Continuously retained and employed (3) major companies for the vast majority of the preceding 35+ years.

Performance: All projects completed on or before scheduled completion date and accepted without any major issue in compliance with specifications within the contract terms.

Personal

• Capable and able supervision, management, and motivation of work crews.

• Multi-tasking of complex and multiple projects simultaneously.

• Proven commitment to success.

• Strong sense of ethics and work ethic.

Professional Experience

MJ Harris Construction Services 2016 – 2019 Nashville, TN

Superintendent medical health Mat-SU Regional hospital in Palmer, and Wasilla Alaska

3rd floor finish out patient rooms, new CATH. Lab, MRI install remodel New Behavioral Health

Nabholz Construction Inc. 2014 – 2016 Conway, AK

Integris hospitals in Oklahoma City and Edmond OK

Superintendent on Krebs School and new addition to Fed Ex facility in Oklahoma City, Oklahoma.

Hutto Construction Inc. 2012 - 2014 Manilla, AR.

Built Dr. Tommy Wagner Medical Clinic and Pharmacy and St. Benards Hospital extension.

Cal-Frac Well Services Inc. July 2008 - 2010 Calgary Canada

Frac Tech Well Services Inc. 2007 - 2008 Conway, AR.

Project Manager for complete oil field service complex which included four new buildings along with acid storage, and sand silo complex. Complex was for natural gas and oil field services. This included supervision and control of all storm water management and safety coordinator.

P.N.C.I. (Phipps Newell Construction, Inc.) 2006 - 2007 Grand Junction, CO.

(Company now out of business.)* Central utility plant and tunnel project (completed Phase 1-2 weeks in advance) for McGrath*and St. Mary’s Hospital, job was completed. (Company was sold out.) Note: this project phase I supervised was completed before schedule without interruption of any hospital services contrary to the prognostication that it could not be done.

Hutto Construction Inc. is my company and all of the following were clients of mine:

Hobby Lobby Stores, Inc. 1996 - 2008 Central & Eastern U.S.

Paving (concrete & asphalt), demo, excavating, concrete footers & flat work, set & weld Structural steel, interior finish (steel studs & drywall), exterior finish (store fronts & vestibules). New and remodel stores ground up

City Market Stores, Inc. (sold to Kroger) 1995 - 1998 Colorado, Wyoming & Utah

Paving (concrete & asphalt), demo, excavation, concrete footers & flat work, set & weld Structural

steel, interior finish (steel & drywall). New and remodel stores.

Wal-Mart Stores, Inc. 1980-1998 Central & Eastern U.S.*

Paving (concrete & asphalt), demo, excavating, concrete footers & flat work, set & weld Structural steel, interior finish (steel studs & drywall), exterior framing and finish. Stucco & efis systems on new and remodels ground up complete

Tipton Oil Field Construction - Oklahoma

Set tank batteries, pumps and all other services in the oil field business

Ingersoll-Rand (Oil Field Products) - Texas

Built new and re-constructed used drilling and service rigs

U.S. Air Force (Honorable Discharge)

Operator and mechanic on heavy equipment.

Dozers, scrapers, cranes, excavator and backhoe

SPECIFICS OF PROJECT MANAGEMENT DUTIES, OBLIGATIONS AND RESPONSIBILITIES

Generally, the following areas have been under my dominion and control as a project manager within which I’ve accepted and completed the necessary requirements or dispute resolutions without hesitation or liability exposure to my employer:

Union issues.

Time Keeping: supervision & accounting

Applicable “Codes” regarding the following:

• Safety

• Electrical (NEC) and applicable local codes or regulations as required

• Engineering requirements or applicable codes 7 relate interpretation for application.

• Storm Water Management

• Structural

• Concrete/Foundation

• Reinforcement rods (rebar)

• Snow Loads

• Wind Loads

• EEOC

• Welding

• Fire Protection

• Pre-inspection certification

• OSHA 30 cert.

Administrative abilities for resolutions of issues to every field where government inspectors or employees have raised issues regarding the worksite, structural or employee related issues.

Confirmation of materials meeting the specifications of the project, engineering & applicable codes or building materials requirements.

Administration and implementation of an and all rules, regulations or requirements of the contractor or my employer regarding the safety, protection of property and person on site including security during any periods the job site is idle.



Contact this candidate