MOHAMED AHMED KAMAL
Electrical Engineer
Email: ****************@*****.***, Tel: +971 (052-*******
PERSONAL INFORMATION:
Date of Birth: 29 November 1989, Nationality: Egyptian, Languages: Arabic and English Marital Status: Married, License: Driving License (UAE). WORK EXPERIENCE:
Oct 2017 to
Date Cubic Engineering - Dubai, UAE
MEP Engineer at:
Construction and maintenance of residential / commercial Building consists of: Ground (Shops) + 2 parking floors + 5 Residential floors at Muwailih – Sharjah, Client: M/s... Sharjah Islamic Bank – ASAS Real Estate
Construction, Completion and maintenance of 118 Villas (Masaken Al Raha) at AlAtain Area, Badii, Sharjah, Client: Government of Sharjah, International represented by Sharjah Charity
AL Taher Mawaheb School at Al Rahmanya 3, Sharjah, Client: Omar
Construction 41 No. Residential Units, each one is Semi-detached Villas ( G+1 floors)- near Maliha Road - Sharjah, Client: M/s Shoumous Properties Co. LLC
B+G+5P+15TYP.Floor at AL Mamzar – Sharjah, Client: SHJ. Bank Islamic
G+3P+SERV+14Hotel+HC at AL-Qasimia – Sharjah,
Client: ABDULI MR.MOHD BUTTY AL
G+5 Typical Floors at AL-Qasimia – Sharjah, Client: Mr. Mohamed Mohamed Ahmed Abdullah
G+4 Typical Floors at Muwailih Commercial area – Sharjah, Client: Mr. Jasim Mohamed Abdullah
ALKhayal AL-ALI
G+3 Typical Floors at Bataeeh – Sharjah. Client: Mr. Obeed Ketbi Matar Obeed AL
Proposed (G+1) Villas 32 No & Boundary Wall – Um Al- Quwein, International Client: Sharjah Charity
Falcon Pack Factory – Um Al Quwein
Proposed (G+1) Villas 4 No – Al Talaa – Sharjah, Client: Ministry of AL Awqaf
Construction of 2 industrial warehouses at Sajaa Industrial Area – Sharjah, Client: Abd AL-Rahman AL Zamil Co
Shams Alnahar Contracting - Dubai, UAE.
Dec 2016 to MEP Engineer - Scope of work including Oct 2017
MEP Engineer in Business Bay (G+17), AL-BARSHAA building
(G+14), Hor ALANZ building (G+4), Rokn Building (G+3), Naif Building (G+4), Abu Hail Building (G+3), kwaneeg villa.
Low current & MEP engineer in Marina building (G+17) &
(G+7).
Low Current Engineer in Jabal Ali Accommodation (G+4)
Dealing with suppliers for the MEP materials for all sites
Design shop drawing and builder works drawings for all the sites.
Crown Home Engineering Consulting - Dubai, UAE.
Mar 2014 to Designer Engineer - Scope of work including Apr 2016
Design electrical services (cable routing, earthling, lighting, power, power AC, emergency, fire alarm, sound system, nurse call system, telephone & data, CCTV system, BMS system, T.V. system, etc.)
Coordination with different authorities and developers in Dubai including (DEWA, ETISALAT, TECOM, DUBAI
properties, DU, ACACIA AVENUE, etc.) to get the NOCs & design approvals.
Electrical Inspector Engineer at AL-Fattan crystal Towers (Dubai marina, U.A.E) - Scope of work including
Supervision/Co-ordination Inspection of works on sites in accordance with drawings and project specifications.
Checking, recording and testing of completed works before covered by the civil contractor.
Following plan the inspection at site as per quality
Review the submittals (for material, mechanical/electrical equipment etc.);as per project specification
Review electrical services (electrical works, fire alarm works, low current works, etc.)
EL-Alamiaa Group Construction and real estate investments - Cairo, Egypt.
2013 to Feb
2014 Electrical Engineer
As Electrical Engineer in 8 Towers in New Fustat in Cairo, 8 Towers in the fifth district of Heliopolis in Cairo and Al Nakhil in Alexandria
EDUCATION:
2008-2013 AAST – Electronic & Communication Engineering Bachelor of Science in Electronics & Communication Engineering Arab Academy for Science Technology & Maritime
Transport, Alexandria, Egypt
In progress PMP Certification
(Expected in
Apr 2020)
COMPUTER SKILLS:
Microsoft Office Tools, AutoCAD, Dialux, Lens Calculator
& primavera P6.
EXTRA CURRICULAR SKILLS:
2013 Our project in Electrical & Electronic Engineering Department for Year 2013, Quad Copter
(Unmanned Aerial Vehicle) Vehicle with
Autonomous subsystems.
2010 Organized and arranged TPM Course
(Total productive Management) in
Collaboration with care club.
2009-2012 Organized and arranged CCC care club cup for football REFERENCES:
Will be furnished on request.