CURRICULAM VITAE
R.PRAVINKUMAR
Plot No. ** A Block,
Door No. S3, Mitra Flats,
SV Nagar, Email ID : adct4t@r.postjobfree.com
Seneerkuppam, Mobile No.: +919*********,
Karaiyanchavadi, +919*********
Poonamallee, Chennai 600 056.
Tamilnadu, India.
Job Objective
Middle level assignments in Operation and Maintenance in the Industrial Utility Maintenance
Technical Qualification
DME, BBA
FIRST CLASS IN BOILER ATTENDANT
Diploma in Armstrong Steam university
Computer Skills
MS Office
AutoCAD
Total Experience
18 Years.
1 Month Notice Period
Summary of Skills & Experience
Over 17 years of experience in Operation and Maintenance of Utility department in Tyre industry.
Production Planning & achieving production target in time with quality.
Core competence in effective maintenance to ensure smooth operation and implementing measures for enhancing productivity.
Hands on experience in implementing quality standards and ensuring adherence to ISO 9000/2000-TS 16949,ISO 14000 and OHSAS, TPM norms.
Well conversant with Environmental Management System (EMS,14001).
Hands on experience in Erection and commissioning of Boilers, compressors and Water treatment Plants .
Organizational Experience
Carlsberg India Pvt. Ltd From 2nd Jan’19 To Till Date As A Sr.Executive-Utility Maintenance.
Horizon-Addis Tyre Share Company Ethiopia From Oct-2017 To 16th June 2018 As A Utility Expert.
M/S Credence Engineering From June –2016 To Sep 2017
As A Manager –Erection RO Plant And STP
M/S Hindustan Coca Cola Beverages Private Limited Mar 2012 To Dec 2014
As A Team Leader In Utility Maintenance
Key Responsibilities Handled
Ensuring Smooth Operation To Meet Pre Set Production Targets.
Planning And Scheduling Preventive And Corrective Maintenance Of Various Utility Equipment To Ensure Ready Availability And Increase In Machine Up Time.
Proactively Identifying And Rectifying Problem Areas To Ensure Uninterrupted Operations.
Implementing Processes Modifications To Optimize Resource Utilization And Maximizes Productivity.
Control And Monitoring Of Utility Equipment’s
Arranging And Maintaining The Minimum Spares.
Preventive, Schedule Maintenance And Master Maintenance Planning Preparation.
Project And Annual Budget Preparation.
Team Member In Plant Level Energy Conservation And Cost Reduction.
Best Performance Employee Of The Year 2013 In Energy Conservation And Break Down Reduction
Forklift Maintenance.
Equipment’s & Systems Handled
Oil Fired Boilers .
Multi Stage Air Compressors.
Refrigeration Plant(Ammonia Compressor)
Chillers With AHU.
Water Treatment Plant.
R O Plants : PLC Based, Pre Filtration And Treatment,
De-Alkalize Plant
Cooling Towers. : Induced Drafting.
Heat Exchangers.
Sewage & Effluent Treatment Plant
Pumps [Centrifugal, Horizontal And Vertical Stage, Jet, Self Priming, Vacuum, Internal And External Gear, Hydraulic Diaphragm, Screw, Reciprocating Pumps Etc.]
Valves.
Safety Systems.
Jobs Involved
Shut Down, Start Up And Stabilizing Of Boilers And Distribution Lines.
Boiler Flue Gas Analysis And Combustion Fine Tuning.
Trouble Shooting And Performance Monitoring Of All Utility Equipment.
Water Analysis And Water Analysis Instrument Calibration.
R O Plant Membrane And Resin Chemical Cleaning.
Boiler Major Maintenance And Attending The Annual Inspection With Government Official.
Looking After GMP ( Good Manufacturing Practices) And Arranging Man Power And Materials For House Keeping Activities And Also As A Steering Committee In GMP
Organisational Experience
M/s Mohan Breweries and Distilleries Ltd SEP 2009 TO FEB 2012
As a Engineer Utility Maintenance
Key Responsibilities Handled
Ensuring smooth operation to meet pre set production targets.
Planning and scheduling preventive and corrective maintenance of various Utility equipment to ensure ready availability and increase in machine up time.
Proactively identifying and rectifying problem areas to ensure uninterrupted operations.
Implementing processes modifications to optimize resource utilization and maximizes productivity.
Control and monitoring of utility equipment’s
Arranging and maintaining the minimum spares.
Preventive, Schedule maintenance and master maintenance planning preparation.
Project and annual budget preparation.
Team Member in plant level energy conservation and cost reduction.
Forklift maintenance.
Fabrication
Equipments & Systems handled
Oil fired Boilers.
Multi stage Air Compressors.
Refrigeration plant(Ammonia compressor)
Water Treatment Plant.
R O Plants : PLC Based, Pre filtration and Treatment,
De-Alkalize Plant
Cooling Towers. : Natural and induced drafting.
Heat Exchangers and Air Cooled Fluid Cooler.
Sewage & Effluent Treatment plant
Pumps [Centrifugal, Horizontal and Vertical stage, Jet, Self Priming, Vacuum, Internal and External Gear, Hydraulic Diaphragm, Screw, Reciprocating Pumps etc.]
Valves.
Safety Systems.
Jobs involved
Shut down, Start up and Stabilizing of boilers and distribution lines.
Boiler flue gas analysis and combustion fine tuning.
Trouble shooting and performance monitoring of all Utility equipment.
Water analysis and water analysis Instrument calibration.
R O Plant membrane and resin chemical cleaning.
Boiler major maintenance and attending the annual inspection with Government official.
Coordinating with pollution control board for Ambient Air Quality Survey, Stack monitoring, Effluent disposal, hazardous Waste Disposal and Attending the annual
inspection.
Looking after GMP ( Good manufacturing practices) and arranging man power and materials for House keeping activities and also as a steering committee in GMP
Organisational Experience
M/s MRF Limited Dec 1998 to Aug 2009
As a Senior Supervisor in Utility Maintenance
Key Responsibilities Handled
Ensuring Smooth Operation To Meet Pre Set Production Targets.
Planning And Scheduling Preventive And Corrective Maintenance Of Various Utility Equipment To Ensure Ready Availability And Increase In Machine Up Time.
Proactively Identifying And Rectifying Problem Areas To Ensure Uninterrupted Operations.
Implementing Processes Modifications To Optimize Resource Utilization And Maximizes Productivity.
Control And Monitoring Of Utility Equipment’s
Arranging And Maintaining The Minimum Spares.
Preventive, Schedule Maintenance And Master Maintenance Planning Preparation.
Project And Annual Budget Preparation.
Team Member In Plant Level Energy Conservation And Cost Reduction.
Forklift Maintenance.
Fabrication
Equipments & Systems Handled
Oil Fired And Water Tube Boilers.
Thermic Fluid Heater
Multi Stage Air Compressors.
DG Sets
Refrigeration Plant
Water Treatment Plant.
R O Plants : PLC Based, Pre Filtration And Treatment,
De-Alkalize Plant
Cooling Towers. : Induced Drafting.
Heat Exchangers And Air Cooled Fluid Cooler.
Sewage & Effluent Treatment Plant
Pumps [Centrifugal, Horizontal And Vertical Stage, Jet, Self Priming, Vacuum, Internal And External Gear, Hydraulic Diaphragm, Screw, Reciprocating Pumps Etc.]
Valves.
Safety Systems.
Jobs Involved
Shut Down, Start Up And Stabilizing Of Boilers And Distribution Lines.
Boiler Flue Gas Analysis And Combustion Fine Tuning.
Trouble Shooting And Performance Monitoring Of All Utility Equipment.
Water Analysis And Water Analysis Instrument Calibration.
R O Plant Membrane And Resin Chemical Cleaning.
Boiler Major Maintenance And Attending The Annual Inspection With Government Official.
Coordinating With Pollution Control Board For Ambient Air Quality Survey, Stack Monitoring, Effluent Disposal, Hazardous Waste Disposal And Attending The Annual
Inspection.
PERSONAL PROFILE
Name : R.PRAVINKUMAR
Father Name : M.RAMMOHAN
Date of Birth : 10/03/1973
Address for Communication : Plot No: 94 A Block,
Door No: S 3,
Mitra Flats, SV Nagar,
Seneerkuppam, Karaiyanchavadi,
Poonamallee, Chennai 600 056.
Tamilnadu.
India. Cell No: +919*********
Email Id : adct4t@r.postjobfree.com
Alternate Email Id : adct4t@r.postjobfree.com
Marital Status : Married
Nationality : Indian
Languages Known : To Speak – English, Tamil,
Kannada &Telugu
To write -English, Tamil.
DECARATION:
I hereby declare that the above mentioned particulars are true and correct to the best of my knowledge and belief.
Your’s Truly,
R.PRAVINKUMAR