MEP INSPECTOR
Name : ARSHAD MEHMOOD
Work Experience : 16 YEARS
EDUCATIONAL QUALIFICATION
Diploma in Electrical Engineering from Govt. Polytechnic Institute kohat, (N.W.F.P), Pakistan.
Diploma in Information Technology from Board of Technical Education, Peshawar, Pakistan
EXPERIENCE DETAILS
1.Working as an “MEP Inspector” in M/s Consistent Electro-Mechanical Engineering Consultants, Dubai, U.A.E. since 2016.
JOB FUNCTIONS:
Supervise, coordinate, monitor and control the installation carried out by the contractor.
Follow-up for the Company Health Safety and Environment Policy, procedures, regulations and objectives related to the area of responsibility. Ensure that work under his control is performed in a safe and environmentally sound manner.
Carry material inspection in accordance with approved material submittal.
Carry site inspections for installation of works.
Carry regular site visits, inspecting material and installation in line with approved submittal and shop drawing.
Issue regular surveillance reports to the contractor if the materials and installations not found in line with project requirement & contract documents.
Carry and witness all sorts of cold test for the installed services.
Check & verify all as-built drawings as per actual site condition.
Inform project engineer of any deficiency in the materials or installations.
Witness testing & commissioning activities in coordination with Project Engineer.
Carry inspection to closing all the comments and snag list issued.
Keep the logs of material & site inspection updated.
Assist Project Engineer in documentation of final closing of project.
Assist Project Engineer in reviewing and commenting RFIs, shop drawings, material submittals and sample supplied by the Contractor for use in the service and endure their soundness with standards and specifications.
KEY PROJECTS HANDLED:
Refurbishment / Upgradation of Oasis Mall, Dubai - U.A.E.
Icare Hospital for Emirates Group at International City, Dubai - U.A.E.
G+4P+17 Residential Tower, Jumeira Village 02, Dubai, U.A.E.
Residential Development consisting of 108 villas, Azalea Community at Arabian Ranches II for Emaar Properties, Dubai, U.A.E.
2B+G+1 Medical Center at Motor City, Dubai, U.A.E.
PREVIOUS PROFESSIONAL EXPERIENCE
2.Working as an “MEP QA/QC Engineer” in M/s Remco Electromechanical L.L.C, Dubai, U.A.E since April 2015.
KEY PROJECTS HANDLED:
The Address Boulevard Hotel (3B+G+P4+68 Floors) EMAAR Property Developer.
3.Worked as an “MEP QA/QC Engineer” in M/s. Albonian International LLC, Dubai, U.A.E from January 2012 – April 2015.
KEY PROJECTS HANDLED:
RUWAIS HOUSING COMPLEX – PACKAGE – 11, (8 Towers) ADNOC Property Developer
4.Worked as a “MEP QA/QC Engineer” in M/s. Sensaire Services LLC, Dubai, U.A.E. from September 2009 to December 2011.
KEY PROJECTS HANDLED:
U-BORA Towers (2B+G+5P+16Res+52 office tower) BANDO Property Developer
5.Worked as a “MEP QA/QC Engineer” in M/s. EFECO LLC Dubai from August 2007 to July 2009.
KEY PROJECTS HANDLED:
Villas 324/212/17 in (Arabian Ranches), Dubai U.A.E.
Villas 277 in (Umm Al Quwain) U.A.E.
EMAAR Property Developer.
JOB FUNCTIONS:
Verify that the quality related site activities are in accordance with the applicable standards
Inspection of work at site as per drawing and specification.
Review of contractor shop drawings, as-built drawings, Method Statements and materials submittals etc.
Coordinate all the quality site inspections through the site QC inspectors
Reporting Progress to the Project Manager/ Construction Manager /QA/QC Manager.
As a NCR Coordinator has to control the status of NCR and analyses NCR/CPAR using Statistical Technique in order to eliminate the root cause of problems
Maintain as built details for the final preparation of the as built drawings.
To attend all Progress Meetings with concerned Project Manager & QA/QC Manager.
Check actual installation on site in cooperation with construction QC in-charge
To prepare, establish, and implement Internal Quality Audit.(ISO 9001Surveillance)
Ensuring that all test reports are verified to meet the contract requirements.
To ensure all materials delivered to site are inspected with consultant and confirm to specified requirement.
Report to the project manager any deficiencies in the operation of quality system and its control.
To coordinate with civil department for the Snags given by Customers and to clear them as soon as possible.
Ensuring preparation of Final Handover Documentation and submissions of quality related documents
6.Worked as “Electrical Engineer” in M/s. CEMCON Construction Company, in Peshawar, Pakistan from March 2004 to June 2007.