Post Job Free

Resume

Sign in

Engineer Manager

Location:
Riyadh, Saudi Arabia
Posted:
April 05, 2020

Contact this candidate

Resume:

Experienced ICT and Electronic Senior Engineer with a demonstrated history of working in the construction industry. Skilled in Site Inspections, Technical Support, Quality Control, Coordination and Supervision. Those are for Electrical / Low Current or ELV Systems including ICT, Security, Fire Alarm and BMS. Eective Senior Technical Specialist with a Bachelor's degree focused in Mechatronics Engineering from Philadelphia University.

WS Atkins Engineering

Consultants

https://www.visualcv.com/mohammad-abu-nafeeseh

Visa Status: Saudi

Iqama (Transferable)

Residence Location: Riyadh

- KSA

Marital Status /

Dependents: Married /

3

for Military

Authority.

In

Property

Site

Operations

Department.

In

Riyadh

-

Saudi

Arabia.

Working

on

IPND

Project

(Internet

Protocol

Network

Delivery)

Sectional

Team

Leader

-

Senior

Technical

Specialist

Nationality / Passport Status: Jordanian / Valid

Date /Place of Birth: 29th Jan 1985 / KSA

Full Name: Mohammad Maher A. Abu-Nafeeseh

Personal Details

(11 Years' Experience)

ICT and Electronic Senior Engineer – Sr. Technical Specialist Mohammad Abu-Nafeeseh

Work

Experience

Amman, Jordan– 10th February 2009.

Bachelor's degree in Mechatronics Engineering – Faculty of Engineering, Philadelphia University – with rating of good Education

linkedin.com/in/mohammad-abunafeeseh

adcnh7@r.postjobfree.com

+966-**-***-**-**

Riyadh, Saudi Arabia

sites as per the project schedule. I have assisted the contractor to prepare the documents and drawings to achieve the target. 9. Have followed with the contractor to make sure that they have submitted the project required documents on time to deliver the incorrect material/tools for the work, and the contractor takes too long to complete the task. 8. Have issued the DERs against contractors to have the record for any cost and delay impacts. For example, the contractor used and resources.

Project Management through Primavera P6 for IPND project to help planning, managing and controlling project charges, activities 7. Have reviewed the daily, weekly reports, and Daily Exceptional Reports (DER) from contractors and forwarded the comments to traffic management and using unsafe scaffolding to perform an activity. Lead HSE Engineer and RTL. Have stopped the work that contains high risk e.g. contractor worked on road crossing without proper 6. I have identified safety concerns, and the contractors have been informed for immediate corrective actions, have been reported to compliant items such as containment has sharp edges that may damage the cables. 5. The materials have been inspected in accordance with approved material list for use on the project. Have rejected any non- under my ownership to obtain the final approval. the sites have been approved and technically transferred to O&M. 4. Have checked the Acceptance Test Plan (ATP) for the contractors' sites. The ATPs have been submitted for five sites that have been manpower to do the work, not having the calibrated tester to test the cable correctly. escalation, and the contractors have been followed up for corrective action. Examples, not using the correct tools and experienced 3. Have indicated non conforming work, have been forwarded to Regional Team Leader ( RTL ) to take necessary actions and and accepted practices. I have extended the maximum eort to avoid contractors claims for cost or delay. works, trenching, ducting, chambers and fibre Optics pulling, termination and testing ) all as per project requirements, standards, includes network cabinets, containment, cabling, AC, power, earthing and required tests ) and OSP ( Outside Plant includes civil 2. Have monitored and followed up on a daily basis and maintained records for the execution of works related to ISP ( Inside Plant the new inspectors to be able to deal with their duties effectively. contractors' work, manpower, documents, certifications and materials matching project requirements. Have trained and coached 1. I have led inspectors' team successfully on various sites in the project to produce daily site checklists and records to ensure Accomplishments :

May 2017 - Present

May 2009 - May 2017

Saudi Oger Ltd.

Construction Company

Certified

by Date Location

Skills

https://www.visualcv.com/mohammad-abu-nafeeseh

2009

to

2011

VIP

Private

Projects.

2011

King

Abdullah

Road

(Phase

I).

2011

to

2016–

King

Abdullah

Financial

District

(LEED

Certified

Office

and

Hotel

Buildings).

2016

to

2017

Ministry

of

Education

(New

Headquarters).

Accomplishments:

in QA/QC Department:

Saudi

Oger

Ltd.

Saudi

Oger

Ltd.

Atkins / SNC-Lavalin

Atkins / SNC-Lavalin

Philadelphia

University

30th

Mar

2007

Amman

AEMS

Company 15th

Jun

2008

Amman

Sadara

Company

21st

Nov

2008

Amman

10th

Feb

2013

Riyadh

23rd

Feb

2014

Riyadh

09th

Aug

2017

Riyadh

Organisational and Interpersonal Skills.

Professional Communication,

and strong supporter of teamwork.

Team Leadership,

Coordination and Supervisory Skills.

Site Inspections, Quality Control,

Specs, Drawings and Technical Documents.

Ability to Understand and Deal with:

BSI and ANSI/TIA.

Knowledge of ICT Standards

Hardware, Software and MS Office.

Computer Literacy

and Safe Systems of Work.

Awareness of HSE Risk Assessment,

Arabic (Native Language) and English.

Languages

Quality Control Engineer – Low Current

In Riyadh - Saudi Arabia. Had worked on the following large-scale construction projects Project Management Professional (PMP)

PMI-PMP - Quality Management

Various Training Courses in BS, ICT and HSE

LEED Training (For Green Building)

Quality Management Processes

Pumps: Basics & Principles

LabVIEW (Basic & Interface)

PIC Basic Programming & Application Projects

Training Courses

coordinated with maintenance division (O&M). I had attended handing over of the project with client representative and O&M. 9. Had followed up pending remarks on the reserve list with the SM and SC. All remarks and comments had been rectified and Approved T&C documents had been acquired and prepared for the T&C stage to obviate any delay. 8. Had coordinated with the Consultant regarding procedures and checklists for Testing and Commissioning ( T&C ) of the systems. recorded information.

7. I Had recorded the As-Built information on a daily basis. the final As-built drawings had been issued and reviewed based on our plan and preventive action plan to eliminate the problems and causes of non-conformities that had preserved project cost and time. disagreement had been reported to the Service Manager for escalation. Had made certain the SC had obeyed the corrective action 6. Had issued non-conformance report for any executed work that does not comply with the contract documents. Any work regarding quality concerns if required.

5. Had prepared the periodic reports and discussed pending issues with the Service Manager to take necessary actions and escalation information feedback.

4. Had maintained communication with the SM, Site Engineer, SC and Consultant to ensure adequate process capability and been verified for compliance of the site requirements. documents. Had highlighted any concerns on work progress. SC' materials/tools, workmanship and functional performance had 3. Had liaised with Site Management (SM) and Subcontractors (SC) to identify deficiencies, and to clarify ambiguities in design and for maintaining the best quality of work.

2. I had promoted as acting QC Senior Engineer since Oct 2014. Had supervised the QC Engineers' team to achieve the team's duties approvals had been obtained from Consultant for the completed work. Lighting Control and BMS. Had forwarded the quality comments for rectifications before submission to Consultant. The required for Low Current Systems such as Fire Detection & Alarm, CCTV, Access Control, IP Networking, TV, Telephone, Audio/Visual, 1. I had done inspections carried out for materials and installations as per contract documents ( drawings, submittals and specs ) Atkins / SNC-Lavalin 17th Nov 2019 Riyadh

16th Nov 2019 Riyadh



Contact this candidate