Experienced ICT and Electronic Senior Engineer with a demonstrated history of working in the construction industry. Skilled in Site Inspections, Technical Support, Quality Control, Coordination and Supervision. Those are for Electrical / Low Current or ELV Systems including ICT, Security, Fire Alarm and BMS. Eective Senior Technical Specialist with a Bachelor's degree focused in Mechatronics Engineering from Philadelphia University.
WS Atkins Engineering
Consultants
https://www.visualcv.com/mohammad-abu-nafeeseh
Visa Status: Saudi
Iqama (Transferable)
Residence Location: Riyadh
- KSA
Marital Status /
Dependents: Married /
3
for Military
Authority.
In
Property
Site
Operations
Department.
In
Riyadh
-
Saudi
Arabia.
Working
on
IPND
Project
(Internet
Protocol
Network
Delivery)
Sectional
Team
Leader
-
Senior
Technical
Specialist
Nationality / Passport Status: Jordanian / Valid
Date /Place of Birth: 29th Jan 1985 / KSA
Full Name: Mohammad Maher A. Abu-Nafeeseh
Personal Details
(11 Years' Experience)
ICT and Electronic Senior Engineer – Sr. Technical Specialist Mohammad Abu-Nafeeseh
Work
Experience
Amman, Jordan– 10th February 2009.
Bachelor's degree in Mechatronics Engineering – Faculty of Engineering, Philadelphia University – with rating of good Education
linkedin.com/in/mohammad-abunafeeseh
adcnh7@r.postjobfree.com
Riyadh, Saudi Arabia
sites as per the project schedule. I have assisted the contractor to prepare the documents and drawings to achieve the target. 9. Have followed with the contractor to make sure that they have submitted the project required documents on time to deliver the incorrect material/tools for the work, and the contractor takes too long to complete the task. 8. Have issued the DERs against contractors to have the record for any cost and delay impacts. For example, the contractor used and resources.
Project Management through Primavera P6 for IPND project to help planning, managing and controlling project charges, activities 7. Have reviewed the daily, weekly reports, and Daily Exceptional Reports (DER) from contractors and forwarded the comments to traffic management and using unsafe scaffolding to perform an activity. Lead HSE Engineer and RTL. Have stopped the work that contains high risk e.g. contractor worked on road crossing without proper 6. I have identified safety concerns, and the contractors have been informed for immediate corrective actions, have been reported to compliant items such as containment has sharp edges that may damage the cables. 5. The materials have been inspected in accordance with approved material list for use on the project. Have rejected any non- under my ownership to obtain the final approval. the sites have been approved and technically transferred to O&M. 4. Have checked the Acceptance Test Plan (ATP) for the contractors' sites. The ATPs have been submitted for five sites that have been manpower to do the work, not having the calibrated tester to test the cable correctly. escalation, and the contractors have been followed up for corrective action. Examples, not using the correct tools and experienced 3. Have indicated non conforming work, have been forwarded to Regional Team Leader ( RTL ) to take necessary actions and and accepted practices. I have extended the maximum eort to avoid contractors claims for cost or delay. works, trenching, ducting, chambers and fibre Optics pulling, termination and testing ) all as per project requirements, standards, includes network cabinets, containment, cabling, AC, power, earthing and required tests ) and OSP ( Outside Plant includes civil 2. Have monitored and followed up on a daily basis and maintained records for the execution of works related to ISP ( Inside Plant the new inspectors to be able to deal with their duties effectively. contractors' work, manpower, documents, certifications and materials matching project requirements. Have trained and coached 1. I have led inspectors' team successfully on various sites in the project to produce daily site checklists and records to ensure Accomplishments :
May 2017 - Present
May 2009 - May 2017
Saudi Oger Ltd.
Construction Company
Certified
by Date Location
Skills
https://www.visualcv.com/mohammad-abu-nafeeseh
2009
to
2011
–
VIP
Private
Projects.
2011
–
King
Abdullah
Road
(Phase
I).
2011
to
2016–
King
Abdullah
Financial
District
(LEED
Certified
Office
and
Hotel
Buildings).
2016
to
2017
–
Ministry
of
Education
(New
Headquarters).
Accomplishments:
in QA/QC Department:
Saudi
Oger
Ltd.
Saudi
Oger
Ltd.
Atkins / SNC-Lavalin
Atkins / SNC-Lavalin
Philadelphia
University
30th
Mar
2007
Amman
AEMS
Company 15th
Jun
2008
Amman
Sadara
Company
21st
Nov
2008
Amman
10th
Feb
2013
Riyadh
23rd
Feb
2014
Riyadh
09th
Aug
2017
Riyadh
Organisational and Interpersonal Skills.
Professional Communication,
and strong supporter of teamwork.
Team Leadership,
Coordination and Supervisory Skills.
Site Inspections, Quality Control,
Specs, Drawings and Technical Documents.
Ability to Understand and Deal with:
BSI and ANSI/TIA.
Knowledge of ICT Standards
Hardware, Software and MS Office.
Computer Literacy
and Safe Systems of Work.
Awareness of HSE Risk Assessment,
Arabic (Native Language) and English.
Languages
Quality Control Engineer – Low Current
In Riyadh - Saudi Arabia. Had worked on the following large-scale construction projects Project Management Professional (PMP)
PMI-PMP - Quality Management
Various Training Courses in BS, ICT and HSE
LEED Training (For Green Building)
Quality Management Processes
Pumps: Basics & Principles
LabVIEW (Basic & Interface)
PIC Basic Programming & Application Projects
Training Courses
coordinated with maintenance division (O&M). I had attended handing over of the project with client representative and O&M. 9. Had followed up pending remarks on the reserve list with the SM and SC. All remarks and comments had been rectified and Approved T&C documents had been acquired and prepared for the T&C stage to obviate any delay. 8. Had coordinated with the Consultant regarding procedures and checklists for Testing and Commissioning ( T&C ) of the systems. recorded information.
7. I Had recorded the As-Built information on a daily basis. the final As-built drawings had been issued and reviewed based on our plan and preventive action plan to eliminate the problems and causes of non-conformities that had preserved project cost and time. disagreement had been reported to the Service Manager for escalation. Had made certain the SC had obeyed the corrective action 6. Had issued non-conformance report for any executed work that does not comply with the contract documents. Any work regarding quality concerns if required.
5. Had prepared the periodic reports and discussed pending issues with the Service Manager to take necessary actions and escalation information feedback.
4. Had maintained communication with the SM, Site Engineer, SC and Consultant to ensure adequate process capability and been verified for compliance of the site requirements. documents. Had highlighted any concerns on work progress. SC' materials/tools, workmanship and functional performance had 3. Had liaised with Site Management (SM) and Subcontractors (SC) to identify deficiencies, and to clarify ambiguities in design and for maintaining the best quality of work.
2. I had promoted as acting QC Senior Engineer since Oct 2014. Had supervised the QC Engineers' team to achieve the team's duties approvals had been obtained from Consultant for the completed work. Lighting Control and BMS. Had forwarded the quality comments for rectifications before submission to Consultant. The required for Low Current Systems such as Fire Detection & Alarm, CCTV, Access Control, IP Networking, TV, Telephone, Audio/Visual, 1. I had done inspections carried out for materials and installations as per contract documents ( drawings, submittals and specs ) Atkins / SNC-Lavalin 17th Nov 2019 Riyadh
16th Nov 2019 Riyadh