SUMMARY:
**+ years of experience as Piping and Mechanical Designer, preparing mechanical drawings and piping designs, for the construction of different projects in the petrochemical sector and Power Plant Generation area. Strong experience working with PDS, for Piping modules, equipment, drawing manager, isometrics generation, interference manager, pipe support designer, Orthogen, SmartPlant Review, CADWorx, Microstation, Autocad, Autoplant, LFM, etc. Interferences and intelligence collection in PDS; use of AutoPlant (Rebis) and EPlant. Pipes general adjustments, equipment location drawings, isometrics generation, typical details of instrumentation and supports preparation, flow charts of process (PFDs), diagrams of pipe and instrumentation (P&IDs), pipelines drawings, plant profile for pipelines and As-built drawings.
PROFESSIONAL EXPERIENCE:
Sep 2019 - Jan 2020 ALIANA Corp. Houston TX
Sr Piping Designer: Piping Design and equipment modeling for these project:
EFG Amine Gas Plant - Laredo Tx
Nov 2018 - July 2019 EDOXX ENGINNERING Houston Tx
Laser Scan Technician: CYCLON Pre - Processing (Targets) for these project:
PIPERACK SYSTEM - PHASE I SHELL DEER PARK
May 2018 - July 2018 EDOXX ENGINEERING - Project for Vepica, Houston TX
Sr Piping Designer: Piping Design and checker, drawing preparation of plant and isometrics for these project:
TIER III GASOLINE COMPLIANCE
October 2017 – April 2018 ENGINEXT Corporation – Project for Hargrove, Mobile AL
Sr Piping Designer: Piping Design, drawing preparation of plant and isometrics for these projects:
BASF - TW PIPE Air and Compressor
HUNTSMAN – Thermal Oxidizer FEL3
BASF – Glass Pipe Stress
March 2014 – May 2016 EDOXX ENGINEERING – Project for Foster Wheeler, Houston TX
Piping Designer: Piping Design, drawing preparation of plant and isometrics for these projects:
Reliance Jamnagar3 Program DTA Coker-1 Revamp Project
Lyondellbasell Debottlenecking Project – CORPUS CHRISTI, TEXAS
LA3 CME PROJECT – Dow Chemical Company PLAQUEMINE - LOUSIANA
September 2012 – February 2014 EDOXX ENGINEERING – Project for KBR Technical services TX
Piping Designer: Piping Design, drawing preparation of plant and isometrics for this project:
Lyondell Lpod Project – LA PORTE TEXAS, QE-1 ETHYLENE UNIT
June 2010 – September 2012 – INELECTRA COLOMBIA S.A.
Piping Designer: Piping Design, drawing preparation of plant and isometrics for these projects:
Basic Engineering Development / Detail for PAD No. 3 (QDW-4) in Quifa for Pacific Rubiales Field.
Cartagena Refinery Expansion Project Reficar – CBI
Production Facilities CPF2 Pacific Rubiales Energy.
September 2009 – April 2010 TÉCNICAS REUNIDAS CHILE LTDA
Piping Designer: Piping Design, drawings preparation, model equipment for this project: "New Aconcagua Refinery Alkylation Plant.
November 2007 – June 2009 EDOXX ENGINEERING – Project for Shaw E&C Cambridge MA
Piping Designer: "HOKU Materials, INC” 2000 MT/Year Polysilicon Plant Pocatello, Idaho. Activities/Projects: Piping Design, Model Equipment.
June 2005 – October 2007: INELECTRA COLOMBIA
Piping Designer: Piping Design, drawings preparation of plant and isometrics for these projects:
"Metor – Expansion – Venezuela” “Detailed Engineering for the technological bring up to date of the MDU Parafin Plant”.
“Remodeling Topping I San Lorenzo Refinery – Argentina”
June 2004 - June 2005 OTEPI CONSULTANTS – Colombia
Piping Designer: Pipe Design, drawings preparation of plant and isometrics for this project: "Frame Contract VRP -015-2003 – Ecopetrol Colombia”
January 2003 – January 2004 INELECTRA COLOMBIA
Piping Designer: Pipe Design and preparation of drawings and isometrics for this project:
"Frame Contract 323171 – Ecopetrol Colombia"
January 2001 – January 2003 INELECTRA, S.A.C.A. (VENEZUELA)
Piping Designer: Pipe Design and preparation of drawings and isometric. Removal in field and preparation of three-dimensional (3D) scale models in AutoPlant for these Projects:
“Boscan Field Development Project – Flow Station EF-Z8.2” and “Boscan Field Development Project – Flow Station EF-20 Expansion Project”.
Project 1030–Chevron CPF, Lake of Maracaibo – Venezuela.
August 2000 – January 2001 TECHINT INTERNATIONAL CONSTRUCTION CORPORATION – Bogota, Colombia
Piping Designer: Pipe Design and preparation of drawings and isometrics for this project:
“Design of the Alternative Tunnel for the Usaquen and Central Santa Ana Hydroelectric”.
June 1999 – July 2000 TECHINT INTERNATIONAL CONSTRUCTION CORPORATION – Sudan - Africa
Telecommunications and Control Planner
Project “Muglad Basin Development Project – Republic of Sudan” Preparation of drawings and installation of teams in field.
November1998 – February 1999 ALPINA NUTRITIOUS PRODUCTS – Bogota, Colombia
Piping Designer: Pipe Design and preparation of drawings and isometrics for this project:
“Sopo Plant Modernization" Project -Preparation of scale models in 3D, pipe drawings and isometrics and summary in field.
May 1996 – September 1998 TECHINT INTERNATIONAL CONSTRUCTION CORPORATION – Bogotá - Colombia
Piping Designer: Pipe Design and preparation of drawings and isometrics for this project:
“Cusiana Cupiagua full Field Development Cupiagua Central Processing Facility” Project -Scale model preparation in 3D, drawings and isometrics preparation.
May 1990 – September 1996 INARGOS LTD. Bogotá – Colombia
Piping Designer: Preparation of typical drawings, isometrics and typical supports for these projects:
“Modernization of the new filler for sales of Products – ECOPETROL-CIB”
“Piping Design of Thermoplastic and supports for the assembly and installation of two electrolyzers for production of chlorine – Elf Atochem of Colombia S.A”
“Platform of Operation receipt of Covenas Refinery Station – ECOPETROL-DOL”
“Ventilation System for Industrias Ajover – Bogota”.
“Fire Protection System for Propane Plant in Galan Station – ECOPETROL-DOL”: Preparation of Planes – AutoCAD – AutoPlant . Preparation of drawings and typical supports for:
“Ventilation System and Powders Extraction of Plastic Components Plant – Comai Ltda. Propilco
“Fire Protection System – Sebastopol Station– ECOPETROL-DOL”
“Fire Protection System for plants of fatty and lubricant – Shell Colombia”
“Distribution of the System of water and steam –Eternit of Colombia”
“Booth proves of water plant of truck –Self-driven Colombia Company”
“New plant recirculation system for painting–Self-driven Colombia Company”
“New Steam System Plant, condensed and compressed air–Self-driven Colombia Company”
“Fire Protection System, Puente Aranda Plant - Shell Colombia”.
EDUCATION:
Designer, Academia Industrial de Diseño – ACADITEC, Bogotá, Colombia – 1990.
TRAINING / COURSES:
Design attended by computer – AutoCAD - Outsourcing de Colombia, 1992.
EPlant Piping, PDS Piping Design, PDS Equipment Modeling and AutoPlant Piping Design, Equipment and Isometrics.
The Department of Adult Education of Centro Presente English as a Second Language Program. Level II – III Somerville – Massachusetts 2008-2009
Curse SmartPlant 3D Piping & Equipment Modeling (INTERGRAPH – VENEZUELA)
Billingual Education Institute Level I – II (English)
Houston Community College Level III (English)
PDMS
CADWorx 2016
REFERENCES:
Ramón Ramos
Chief Designer KBR
Phone number: 713-***-****
Jessie Quintanilla
Piping Designer Supervisor Amec Foster Wheeler
Phone number:832-***-****