CURRICULAM VITAE
C.JEYAKANTH
No.** Rajeshwarinagar,
6th street, kelampakkam
Chennai 603103
E-mail:***********@*****.***
Mob. No: +91-954**-*****
KNOWLEDGE, SKILLS &EXPRERIENCE :
Detailed knowledge of the engineering and installation of medium, low and extra low voltage electricalworks for infrastructure, commercial and industrial buildings. The work would include: medium andlow voltage, power, lighting, emergency lighting, fire alarm, security, and voice and data systems.
Working in construction field for 16 years holding different positions, from Electrical Engineer to Project Engineer.
Experience Commercial, offices and residential building Projects.
EDUCATIONAL QUALIFICATION :
Diploma in Electrical and Electronics Engineering (EEE) with 76% from Alagappa Polytechnic karaikudi to State Board of Technical Education 2000, Tamil Nadu.
SSLC with 84% from St. Francis Higher Secondary School.C.K.Mangalam.
WORK EXPERIENCE :
1.Position : Electrical Engineer
Duration : April 2015 to till date
Employer : CREATIONS PROMOTERS PVT.LTD
Project : GENESIS, 156 FLATS RESIDENTIAL BUILDING, NAVALUR, CHENNAI
WHITE HOUSE, FOUR FLOOR COMMERCIAL BUILDING, ADAYAR
DUTIES & KEY RESPONSIBILITIES :
As a Electrical project Engineermy Major responsibilities were Installation of all the electrical building equipments, lighting and power panels, Low voltage addressable fire alarm devices, security systems, data and voice systems of the project.
Ensure that all the materials are available at site to undertake the works.
Ensure that all the materials are correctly stored at site and installed without damage.
Ensure that all the works are carried out in a safe manner in accordance with the project safety plan.
Set targets and monitors the productivity of the workforce at site.
Allocate the workforce to the areas of the site based on the programme, nature of the works and the skills required.
Ensure that the contract drawings and specifications are properly implemented on site.
Ensure all relevant work instructions and company quality management system are being followed to all works being undertaken
Reviewed the shop drawings submitted by the contractor:
A.) Lighting System
B.) Power System
C.) Fire Alarm
D.) Structured Cabling
E.)External Electrical and ELV buried services
Coordinate with the Project Manager and Construction Engineers regarding various construction and design issues including but not limited to changes in construction plans and specifications versus contract plans and specifications.
Review material submittal documents and sample submittals.
Do other related works directed by the Project Manager.
Inspect materials delivered on site to make sure that the materials, equipments and devices delivered are in accordance with the project specifications.
Give instructions to contactors engineer and foreman for day to day activity and progress.
Conduct site inspections submitted by contractor to make sure that the approved plans and/or shop drawings are being implemented on site.
Witness and conducted factory visit and test of electrical equipment prior to delivery at site.
Review of Test Report, Method of Statement and Risk Assessment.
Conduct and witness of testing with contractors engineer and testing and commissiong engineer such as megger test, cold test and live test.
WORK EXPERIENCE :
2.Position : Electrical Engineer
Duration : February 2010 to March 2015
Employer : DEVA CONSTRUCTIONS AND CONTRACTOR PVT.LTD, CHEENNAI
Project : RESIDENTIAL BUILDING
DUTIES & KEY RESPONSIBILITIES :
Ensure that all the materials are available at site to undertake the works.
Ensure that all the materials are correctly stored at site and installed without damage.
Ensure that all the works are carried out in a safe manner in accordance with the project safety plan.
Set targets and monitors the productivity of the workforce at site.
Allocate the workforce to the areas of the site based on the programme, nature of the works and the skills required.
Ensure that the contract drawings and specifications are properly implemented on site.
Ensure all relevant work instructions and company quality management system are being followed to all works being undertaken
Reviewed the shop drawings submitted by the contractor:
Coordinate with the Project Manager and Construction Engineers regarding various construction and design issues including but not limited to changes in construction plans and specifications versus contract plans and specifications.
Review material submittal documents and sample submittals.
Do other related works directed by the Project Manager.
Inspect materials delivered on site to make sure that the materials, equipments and devices delivered are in accordance with the project specifications.
Give instructions to contactors engineer and foreman for day to day activity and progress.
Conduct site inspections submitted by contractor to make sure that the approved plans and/or shop drawings are being implemented on site.
Fire Alarm systems.
Distribution boards.
D.G’s andDistribution transformers.
ATS (Auto Transfer Switch) panel for DG sets.
Mains protection.
Lightning protection systems.
Electrical grounding systems.
DB’s schedule preparation
WORK EXPERIENCE :
3.Position : Electrical Engineer
Duration : May. 2006 – March.2010
Employer : AL AQEED CONSTRUCTIONS PVT.LTD, SAUDI ARABIA
Project : RESIDENTIAL BUILDING, COMMERCIAL BUILDING
DUTIES & KEY RESPONSIBILITIES :
As a electrical Engineer, My major responsibilities were to control all the electrical works of the project to ensure they are completed on time, technically correct, in accordance with the project approvals and Specifications.
Participate where required in all aspects of the Project management for the electrical works.
Monitoring the relevant works for conformance with the provisions of the contract documents and the procedures manual.
Reviewing, approving and processing all relevant technical submittals.
Answering RFIs related to relevant works.
Reviewing contractors relevant change order proposals and preparing recommendations.
Manage and supervises the on-site electrical works.
Undertake the detailed short term planning and co-ordination at site in accordance with the master program.
Set targets and monitors the productivity of the workforce at site.
Co-ordinate with the main contractor and other sub-contractors at site.
Site visit to assess the site condition before tendering.
Cost estimation and analysis.
Preparation of detailed construction schedule, activity sequencing and manpower forecast.
Review of shop drawings and material submittals prepare by sub-contractors / suppliers.
Study IFC drawing issued by the client, preparation of cost estimate, price negotiation of the change order, manpower, equipment forecast and execution plant.
Supervision of job at site.Conduct site inspections submitted by contractor to make sure that the approved plans and/or shop drawings are being implemented on site.
Conduct and witness of testing with contractors engineer and testing and commissioning engineer such as megger test, cold test and live test.
Following maximum safety rule to finish work without any accident.
Coordinate with inspector for inspection and QC of installation works.
Have good experience of inter-discipline coordination.
Preparation of all test results (reports) for documentation and as-built drawings.
Planning, coordination to solve the technical issues and execute the project with minimum plant shutdown time.
In execution responsibility includes installation, arranging inspection by client, testing, commissioning of all electrical / instrument equipment and underground (direct buried MV/LV) power cable, grounding grids, fire alarm, telephone, fiber optic cable, instrument control cables, wiring internal / external for lighting, fire alarm system, CCTV system, public address system, lighting control, street lightings, high mast lighting, area lighting, and testing and commissioning of all electrical works.
WORK EXPERIENCE :
4.Position : Electrical Engineer
Duration : May.2000 – April.2006
Employer : QUICK ELECTRICALS, ARUMBAKKAM, CHENNAI
Project : RESIDENTIAL BUILDING, COMMERCIAL BUILDING
DUTIES & KEY RESPONSIBILITIES :
Site Engineer Electrical
Maintained for 125KVA DG set -3Nos
Maintained for 500KVA Transformer -6Nos
Prepared the total load calculation and demand factor.
HT/LT Power system erecting and commissioning
Prepared and reviewed engineering plans, specifications, project schedules, designs, circuit diagrams, and estimates for construction and maintenance of power generation projects electrical and plumbing
Maintained effective working relationships with field cranes, contractors, vendors, outside agencies, the public and city staff members.
FIRE FIGHTING system
Power distribution system
Erection and Maintain CCTV,Telecommunication,Data and video door phone system.
Earthing system,
Lighting arrester System
TECHNICAL QUALIFICATION :
AUTO CAD – Electrical.
MS-OFFICE 2010
ERP.
PERSONAL DETAILS :
Father’s Name : C.Chidhambaram
Date of Birth : 10-06-1982
Age : 34 Years
Gender : Male
Nationality : Indian
Religion : Hindu
Marital Status : Married
Languages Known : Tamil & English, Hindi
Passport no : N6644316
Address : 2/6 B Ammani, puliyal (post)
Devakottai(tk)
Sivagangadt pin – 630 312
Tamil Nadu.
DECLARATION
I hereby declare that the details furnished above are true to the best of my knowledge and belief.
Signature
Place: Chennai
Date: