Resume

Sign in

Project Mechanical Engineer

Location:
Subang Jaya, Selangor, Malaysia
Posted:
March 25, 2020

Contact this candidate

Resume:

PERSONAL DETAILS

Name: Abdulaziz Gaber,

Date of Birth/Place: 19 - May - 1970 / Yemeni

Total years of Experience in Oil & Gas: 20 year

Current Location: Malaysia

Email: adcf3r@r.postjobfree.com

Qualification

Item

Degree

Master

Institution

UNIVERSITY OF ADEN

UNIVERSITI TENAGA NASIONAL

Degree

B.Sc. of Mech. Engineering

Master in Engineering Management

Period

1991 – 1995 (Yemen)

2014 – 2016 (Malaysia)

OBJECTIVE

To excel my skill in the best possible way for achieving the employer’s goal and utilize all skill, abilities and talents to the fullest in order to contribute serve betterment of the employer. Looking for a challenging role in Planning Management in a well reputed organization where commitment to profitability, cost impact, quality & within scope, timely completion of the projects.

PROFESSIONAL EXPERIENCE

TA PLANNING LEAD, NSRP, Vietnam, (Nov. 2017 to Nov 2019)

The major tasks:

Replaced the flare seal drum (75 ton), the damage pipe of the flue gas line of RFCC (10 ton) with refractory and the damage heater tubes of NHDS (75 pipes).

The main activities to achieve this project

Prepare & Issue planning package as per contractual terms & conditions and receiving approval from the Client within the stipulated period of the contract.

Ensure that schedule is based on project execution strategy and schedule milestones are achievable.

Develop S Curve and Manpower histogram and check if these are achievable.

Ensure that required resources and skill sets are available to meet the schedule and resources are leveled and activities are rescheduled if the required skill set is not available.

Ensure that schedule is updated and maintained valid throughout the duration of the project and that project manager is aware of forward load and manpower availability.

Document schedule changes and keep time-phased copies of the schedule of the work as historical records as the project progresses.

Resource Planning and Forecasting of projects & activities.

Project Cost Control Budget Establishment and reporting.

Report Earned value in terms of earned man-hours and Value of Work done.

Compare & analyze earned value with actual and planned values and report in the form of Cost Performance Index CPI and Schedule Performance Index SPI.

Ensure to maintain Master Deliverable Register throughout the project.

Participate in rising of Change request / Change Order.

Analyze schedule variance & plan remedy if there any negative variance.

Prepare weekly / monthly project reports.

Prepare Project Control Statements & monthly forward load of resources.

Prepare portfolio level project reports.

Upon completion of the project, verify that the as-built schedule reflects accurate completion dates for each schedule activity.

SENIOR ENGINEER, Qatar Gas, Qatar, (Jun 2013 to Jul 2014)

The major tasks:

JBOG, it's around 1.0 billion USD project to build Jetty Boil-off Gas Recovery in Qatar Gas. The JBOG facility is designed to recover 100 million standard cubic feet per day (Mmscfd) of natural gas.

The main activities to achieve this project

Developing a project master schedule in line with the proposal/project requirements through the application of the primavera P6 software.

Develop Work Breakdown Structure (WBS) and Identify Project deliverables, required tasks & Project Milestones.

Develop Project resource planning, resource allocations and Sequencing.

Identify Critical planning inputs on Engineering and Procurement during design & tender/award stages.

Co ordinate internal project team reviews followed by an approval and review by the client on the work schedules, progress measurements and reporting systems.

Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports.

Carry out assessments of Extensions of Time and the associated cost impacts and schedule impact against baseline.

Identify a mitigation method, strategic measures to maximize benefits & mitigate delays upon submission.

Progress monitoring on a regular basis. Anticipate and resolve any problems, bottlenecks/scheduling conflicts.

Perform Project CPM analysis and Project Resource analysis.

Revise and resequencing Baseline schedules upon project requirement.

Ensure that project controls documents such as resources histogram, schedules, reporting systems, material controls systems, etc. are fully developed according to industry standards and verify by Project Management Team.

Interpret & summarize reports for coordination purposes and for management review.

Ensure proper documentations & filling of submittals.

Perform schedule health check to determine overall quality of plans in Primavera P6.

Monitor and guide Team of planners on creating project schedules and perform progress monitoring according to industry best practices and also project specific requirements.

Perform any other duties and responsibilities as and when directed by the Superior.

PLANNING HEAD, YLNG PROJECT, FRANCE/YEMEN, (APR 2006 to JUN 2013)

The major tasks:

-Managing the YLNG project phases, ensure the deliverables, procedures and documents are stored in to CMS (PRODOM) and participate in FAT, SAT of equipment’s and spare parts of the LNG $4.5 billion project.

-Install cyclone at the inlet reception facilities to captured the black powder coming with the feed gas from upstream through the main pipeline.

-Several times fixed the sabotage of the main pipeline (320 Km with size of 38”), and other projects.

The main activities to achieve this project

Initiate, prepare & develop project plans & schedules according to standards, contract specifications and accepted Project Management practices.

Coordinate with the Project Manager, Site Manager, Site Engineers, Job Estimators, Engineers of various disciplines etc. to acquire proper data and specifications for the schedule.

Analyze drawings, specifications & method statements of works for the preparation of activity networks / scheduling / resources planning and allocation.

Develop major milestone activities & establish a well-defined Work Breakdown Structure, which includes all the scopes of work.

Establish the Schedule based on key dates, mile stone dates, scope of works, resource loading etc., as specified in the contract.

Assign duration, resources (Manpower, Materials and Equipment’s) and Budgeted Cost for each activity based on their weight factor & quantity/volume of work. And identify Long Lead items required in the Project.

Generate detailed work plan, critical activities/path, planned/progress S-Curves, Budget Histogram/planned distribution tables, Resource Histogram/planned distribution tables etc.

Coordinate schedule from multiple sub-contractors / vendors and incorporate the information gathered into the overall project master schedule.

Develop databases for Engineering deliverables, Procurement deliverables and Construction activities for monitoring/analyzing/tracking progresses.

Review, analyze & refine sequence and logic of tasks/activities and highlight any critical activity needs particular attention.

Track, monitor and forecast progress of all activities and deliverables such as products, engineering documents, fabrication status and construction of all discipline.

During Project Proposal, invite contractors for various discipline, conduct job explanation meeting and to collect BID for all packages.

Conduct Technical and commercial clarification meeting; negotiate the quotation to finalize the BID during proposal stage.

Conduct BID clarification meeting, Project explanation meeting with contractors.

Review contractor’s quotation for execution stage in line with our Budget, Planned resource and profitability.

Follow-up with contractor/ site team to monitor project progress and make reports.

Monitoring, updating & analysis of progress right from the field.

Collate data & other pertinent information of project progress and update schedule.

Evaluate dates to completion and project delay, if any, periodically by updating actual progress data.

Prepare reports & charts, i.e., daily/weekly and/or monthly reports as required by management and/or client.

Support project management in accomplishing project status review and performance control.

Attend project progress status review meetings with client, vendors and sub-contractors.

Prepare reports about activities to be prioritized (critical activities) for Site Supervisors/Engineers.

Record and assess the effects of project schedule changes.

Assess actual progress versus planned progress to determine trends and variances.

Analyze schedule trends, determining risks, developing options for corrective action and alter schedules to meet unforeseen conditions.

Prepare Cash Flow charts/tables and Financial Models.

Estimate & forecast quantity of works and costs/amount of works.

Prepare progress invoices/bills to client.

Review & verify the progress invoices/bills of sub-contractors and vendors.

Create new unit price for material which is not include in contracts.

Develop Action and Recovery plans to support project completion on time.

Revise the project plans & schedules (re-planning and re-base lining) for variation orders/change orders/additional scope of works and Extensions of Time.

Ensure all the project deliverable and procedures are uploaded into CMS (PRODOM).

Participate in FAT and SAT for main equipment’s and spare parts.

Prepare various schedules such as schedules for pre-commissioning / commissioning / performance tests etc.

MECHANICAL PLANNER, QAPCO, QATAR, (MAY.2000 to MAR.2006)

The major tasks:

QAPCO, Revamp and expansions of the polyethylene facility including the expansion of the ethylene plant (EP2), boosting its annual ethylene production capacity from 525,000 to 720,000 metric tons. It’s around USD45 million.

The main activities to achieve this project

Assist the Project Lead in managing and monitoring the project progress to meet technical requirements and time schedule with high quality standard and cost effectiveness.

Attend to daily tasks relating to project and customer's requirements and work closely with the Engineering, Procurement, Production & Quality Departments.

Manage sub-contractors and vendors on cost, quality and schedule issues.

Prepare the project schedule and progress report and alert higher management on the project risk when occurred.

Maintain the proper documentations follows Project Execution Plan throughout the project cycle.

MECHANICAL ENGINEER, MANNAI CO., QATAR, (SEP 1996 to APR 2000)

The major tasks:

QAPCO, upgrading of cracking-furnace area, the four front stacks belong to seven older furnaces, each with an ethylene capacity of 50,000 tons/year. The two rear stacks are part of three new furnaces, a capacity of 90,000 tons/year.

The main activities to achieve this project

Ensures team members have a clear understanding of the overall strategy, business drivers and priorities of the project

Develops project plans including engineering design/procurement, fabrication, vendor mobilization, offshore construction and commissioning

Manages the interface and communication processes between parties on all project activities

Ensures changes to technical specifications are risk assessed, managed and appropriately captured in engineering and related documentation

Ensures risk assessments are undertaken

Manages project budgets/costs

Reviews work schedules/plans, identifies opportunities to improve performance, reduce costs, maximize use of resources, etc.

Ensures all activities are in line with industry and company engineering standards

Make site visits to check on progress

Reports any breaches of safety procedures to supervision / management

Actively participates in and promotes company health and safety campaigns, policies and procedures, and ensures personal safety and that of colleagues at all times

PROFESSIONAL TRAININGS:

Primavera schedule training conducted by QAPCO training and development section from 16/12/2004 to 19/12/2004.

Planning & scheduling conducted by TECHINCAL CONSULTANCY LIMITED from 22/5/2005 to 26/5/2005.

Planning & Scheduling with Primavera Project Planner (P3) training conducted by PrimaFrance from 16/6/2008 to 17/6/2008.

Managing Projects using Microsoft Office Project 2003, conducted by Ultimate from 18/4/2009 to 20/4/2009

Planning & Scheduling with Primavera Project Management (P6) training conducted by ExecuTrain from 6/4/2011 to 27/4/2011.

Engineering Project Management (Intensive Course) conducted by AJAXEE Malaysia from 5/10/2015 to 9/10/2015

Project Management Professional PMP training (University of Malaya) conducted by Dr. Aoday Mohamad (PMP Certified) from 23/07/2016 to 31/072016.

Primavera P6 Professional training conducted by Phyneer Rex Solution from 13/10/2017 to 16/10/2017

Managing Projects in Primavera P6 EPPM training conducted by OneBIM Vietnam from 7/5/2018 to 10/5/2018

Computer Knowledge: Primavera (P6), MS Project, MS Office, SAP & MAXIMO, NAVIWORKS 3D Software, AUTOCAD, CREO Parametric 3D Modeling Software PTC



Contact this candidate