ENGR FAHIM AHMAD SAQIB
(Civil Engineer)
Cell No: +971*********
Email: adcdvj@r.postjobfree.com
OBJECTIVE
A Challenging position in a dynamic company to practice my strong intellectual, professional and interpersonal skills. An assertive, result oriented mature team player with plenty of confidence and initiative, High self- motivated, prompt, courteous and professional, at all times. Enjoy learning new methods and techniques and putting them into daily practices.
EMPLOYEMENT HISTORY
Working in the field of Civil & construction Industry from SEP. 2007 –to date. EXPERIENCE PROFILE
Experience of construction of Roads for Ministry of Housing Tabuk Saudi Arabia EMPLOYER: ALMOBTY CONSTRUCTION AND PARTNERS CO.
PERIOD: MAY 29, 2014 TO DEC 15, 2019
PROJECT: CONSTRUCTION OF ROADS FOR MINISTRY OF HOUSING TABUK SAUDIARABIA CLIENT: MINISTRY OF HOUSING SAUDIARABIA
DESIGN: SAUDIARABIAN PARSONS LIMITED
JOB DESCRIPTION:
Quality control of
Road Work all phases
RESPONSIBILITIES
QA/QC ENGINEER
• Review of quality control documents.
• Preparing & Implementation of QIP (Quality inspection Plan).
• Prepare method statement & implement on site
• Prepare complete dossier document & submitted to client.
• Site inspection for earth works and structural concrete works as per drawing.
• Work out on quality alert of Non-conformance report NCR (CAR, PAR).
• Checking of bar bending schedule.
• To inspect all concrete work, building finishing work
Experience of construction of New Khanki Barrage WazirAbad Pakistan EMPLOYER: DESCON ENGINEERING LIMITED.
PERIOD: APRIL 19, 2013 TO MAY 28, 2014
PROJECT: CONSTRUCTION OF NEW KHANKI BARRAGE WAZIRABAD PAKISTAN CLIENT: WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) PAKISTAN DESIGN: SMEC INTERNATIONAL PVT LIMITED
JOB DESCRIPTION:
Quality control of
Structure Foundation and Elevation of Barrage building, Construction of Barrage Colony Roads RESPONSIBILITIES
QA/QC ENGINEER
• Review of quality control documents.
• Preparing & Implementation of QIP (Quality inspection Plan).
• Prepare method statement & implement on site
• Prepare complete dossier document & submitted to client.
• Site inspection for earth works and structural concrete works as per drawing.
• Work out on quality alert of Non-conformance report NCR (CAR, PAR).
• Checking of bar bending schedule.
• To inspect all concrete work, building finishing work
Experience of construction of a gas plant at BARZAN ONSHORE PROJECT, RAS LAFFAN INDUSTRIAL CITY QATAR
EMPLOYER: DESCON ENGINEERING QATAR LLC.
PERIOD: SEPTEMBER 23, 2011 TO 16 APRIL 2013
PROJECT: CONSTRUCTION OF GAS PLANT AT BARZAN ONSHORE PROJECT, RAS LAFFAN INDUSTRIAL CITY QATAR
CLIENT: RAS GAS OPERATING COMPANY LIMITED
DESIGN: JAPANESE GASOLINE CORPORATION LIMITED
JOB DESCRIPTION:
Quality control of
Structure Foundation and Elevation of Gas Plant building RESPONSIBILITIES
QA/QC ENGINEER
• Review of quality control documents.
• Preparing & Implementation of QIP (Quality inspection Plan).
• Prepare method statement & implement on site
• Prepare complete dossier document & submitted to client.
• Site inspection for earth works and structural concrete works as per drawing.
• Work out on quality alert of Non-conformance report NCR (CAR, PAR).
• Checking of bar bending schedule.
• To inspect all concrete work, building finishing work
Experience of construction of student and staff hostel at SHEIKH ZAYED INTERNATIONAL ACADEMY H8/4 ISLAMABAD
EMPLOYER: SKYWAYS CONSTRUCTION PVT LTD.
PERIOD: DECEMBER 6, 2010 TO SEPTEMBER 23, 2011.
PROJECT: CONSTRUCTION OF STUDENT AND STAFF HOSTEL AT SHEIKH ZAYED INTERNATIONAL ACADEMY H8/4 ISLAMABAD
CLIENT: ABU DHABI DEVELOPMENT FUND.
DESIGN: ALLIED ENGINEERING PVT LTD.
JOB DESCRIPTION:
Quality control of
Structure Foundation and Elevation of building
RESPONSIBILITIES
QA/QC ENGINEER
• Review of quality control documents.
• Preparing & Implementation of QIP (Quality inspection Plan).
• Prepare method statement & implement on site
• Prepare complete dossier document & submitted to client.
• Site inspection for earth works and structural concrete works as per drawing.
• Work out on quality alert of Non-conformance report NCR (CAR, PAR).
• Checking of bar bending schedule.
• To inspect all concrete work, building finishing work
Experience of Fertilizer Plant of Engro Chemical Pakistan Ltd. EMMPLOYERDESCON ENGINEERING Ltd.
PERIOD 1st JULY 2008- to December 2, 2010
PROJECT EnVen- 1.3 World Largest Ammonia Urea Complex CLIENT Engro Chemical Pakistan Ltd.
DESIGN Snamprogetti Engineering B.v
JOB DESCRIPTION
Quality control of
Structure Foundation and Elevation of Ammonia Urea Complex Including Foundation and Elevation of Prilling Tower, Cooling Tower, Compressors, Pipe Racks, SCR Building, CCR Building, SS1 Building, SS2 Building, Underground Pits & Pre-cast elements. Supervision & Quality Control of Piles with Reverse Rotary method as well conducting Load Tests. RESPONSIBILITIES
QA/QC ENGINEER
• Review of quality control documents.
• Preparing & Implementation of QIP (Quality inspection Plan).
• Prepare method statement & implement on site
• Prepare complete dossier document & submitted to client.
• Site inspection for earth works and structural concrete works as per drawing.
• Work out on quality alert of Non-conformance report NCR (CAR, PAR).
• Checking of bar bending schedule.
• To inspect all concrete work, building finishing work & embedded items and check to client/consultancy.
Experience of Civil Works on Telecommunication Towers on Crystal Engineering Services Pvt ltd.
PERIOD Jan 2008 to June 2008
PROJECT
Erection of Telecommunication Towers (Such as Telenor, U-fone, Paktel & Warid) JOB DESCRIPTION
Quality Control of:
Foundation, BTS Room, Genset Pad, Boundary wall and Guard Room
(Including Erection & Electrical work).
• Managing sub-contractors & ensuring quality civil works in accordance with client standards as per design requirement.
• Look after all electrical work such as Grounding/Earthling, connection of (BTS Equipment’s, IPS & Genet with junction box).
• Check power Sockets, Plug lights & OB lights (Obstruction light) in tower.
• Inspect tower Erection, Tightening & paint.
Experience of civil work on ACT INTL. PVT LTD.
PERIOD Aug 2007 to Dec 2007
PROJECT PHASE 5 DHA. LAHORE
Execution of: Foundation & Elevation of Residential Building & Warehouses
• Manage the Sub Contractors as per required design work
• Manage the construction material required at site.
• Supervised all civil construction work.
• Prepare the BOQ of project.
• Prepare bar bending schedule
ACADEMIC QUALIFICATION
DEGREE BOARD/ UNIVERSITY YEAR DIVISION
BSc. Civil Engg. U.E.T, Taxila 2007 1st Division
HSSC (Pre-Eng.) F.B.I.S.E, Islamabad 2003 1st Division SSC (Science) F.B.I.S.E, Islamabad 2001 1st Division THESIS PROJECT: SEDIMENTATION PROBLEMS IN MANGLA DAM PEC REGISTRATION Civil/27697
COMPUTER SKILLS
• STAAD. Pro
• Auto CAD (2D/3D)
• MS Office (Word, Excel & Power point).
LANGUAGES
English, Urdu, (Can Read, Write & Speak)
Arabic (Working Knowledge)
VISA STATUS: Visit Visa
PERSONAL INFORMATION
• Father’s Name Maqsood Ahmad Saqib
• Date of Birth 12th June 1985
• Religion Islam
• Nationality Pakistani
• Marital Status Married