OBJECTIVE:-
To be associated with a progressive organization which can provide me with a dynamic work sphere to extract my inherent skills as a professional, use and develop my aptitude to further the organization’s objectives and also attain my career targets in the progress.
PROFESSIONAL EXPERIENCE:-
Having total 9- years’ 4-month’s Experience in Electrical field
PROFESSIONAL EXPERIENCE DETAILS: -
A member of Bonatti Group of Companies, leaders in the Electrical and Instrumentation Erection work. It is an Italian based, International Contractor with a strong track record in performing Engineering, Procurement & Construction (EPC) work, relevant to oil & gas, Petrochemical, Power generation, Transmission and distribution, Industries (Electrical supervisor)
COMPANY : CARLO GAVAZZI ARABIA CO. LTD
LOCATION : SAUDI ARABIA
TIME PERIOD : FEBRUARY 2014 – TILL DATE
DESIGNATION : ELECTRICAL COMMISSIONING ENGINEER
PROJECT DETAILS:-
1)
PROJECT : WAAD AL-SHAMALPOWER PLANT, ( 1390MW ISCCPP )
CUSTOMER : SAUDI ELECTRICITY COMPANY
CLIENT : GE
NATURE OF JOB : ELECTRICAL COMMISSIONING ENGINEER
DURATION : 3RD SEPTEMBER-2019 to AT PRESENT
2)
PROJECT : SHUAIBAH III EXPANSION II DESALINATION PLANT.
CUSTOMER : STPC
CLIENT : ABEIMA
NATURE OF JOB : ELECTRICAL COMMISSIONING ENGINEER
DURATION : 1ST OCTOBER to 1ST SEPTEMBER-2019
3)
PROJECT : POWER PLANT-13,(PP13, 1800MW CCPP) GAMA PROJECT.
CUSTOMER : SAUDI ELECTRICITY COMPANY
CLIENT : GAMA
NATURE OF JOB : ELECTRICAL COMMISSIONING ENGINEER
DURATION : 18TH OCTOBER-2016 to 25TH SEPTEMBER-2018
4)
PROJECT : RABIGH PHASE II PETROCHEMICAL PROJECT.
COMPANY NAME : PETRO RABIGH
CLIENT : PETROFAC SAUDI ARABIA LTD (PSAL).
NATURE OF JOB : ELECTRICAL COMMISSIONING ENGINEER
DURATION : 18-APRIL-2015 to AUGUST-2016
5)
PROJECT : YANBU ARAMCO SINOPEC REFINERY PROJECT.
CUSTOMER : YASREF
CLIENT : BONATTI
NATURE OF JOB : ELECTRICAL ENGINEER
DURATION : 18-FEBRUARY-2014 to 3rd FEBRUARY-2015.
JOB DESCRIPTION:-
PROJECT DESCRIPTION : WAAD AL SHAMAL Integrated Solar Combined Cycle (ISCC) Power Plant. The plant will have a total capacity 1,390 megawatt (MW), of which 50 MW will come from a solar component.
PROJECT DESCRIPTION : Power Plant13 is one of the big power plant in Saudi Arabia. With GTG 260*6 Units, STG 394*2 Units & Boilers.
Conduct Pre-commissioning activity of MV 13.8Kv/6.9Kv & LV switchgear and LV & MVmotors.
Stability Testing of Bus bar Differential.
Testing Knowledge about Breaker, Current transformer, Voltage transformer, Potential transformer, isolation transformer, Metering and Transducer Testing.
Testing & Commissioning of MV/LV Switchgears (13.8KV, 6.9KV, and 480V), MCC & Distribution Panels (Including CT, PT, VCB, ACB, and Functional Test, etc.)
Knowledge of GCB Equipment testing of CT,VT,EART SWITCH(Line side & Generator side,DISCONNECTIOR,SURGE ARRESTOR & CAPACITOR & FUNCTIONAL TEST OF GCB and Interlock between Earth switch and disconnector switch..,
Knowledge of GTE (Generator Terminal enclosure) Equipment testing of CT, VT, EART SWITCH, DISCONNECTIOR, Lighting ARRESTOR, NGT & NGR.
Knowledge of Control and Protection Schemes of various protections.
Commissioning of 480V, 4.16kV, 6.9kV & 13.8kV as well as troubleshooting in Electrical Protection system and fault analyzing.
Testing & Commissioning of Oil type Transformer & Dry type transformer.
High Voltage test for MV Cable and MV/LV Switchgear, Isolated Phase Bus Duct & Non segregated Bus Bar.
Contact Resistance for Bus Ducts And Bus Bar In Panels.
Schematic Diagram Modification and Rewiring as per the Client’s comments.
Preparation of Inspection test record (ITR) forms for LV/MV Switch gear, LV/MV motor, Panel Boards, Construction and commissioning Method Statements.
Involved in all Pre-commissioning activities of Electrical Substations in coordination with vendor and preparation of Test reports.
HARDWARE SKILL:-
FREJA 300 : 3ph Relay Testing Kit
CT Analyzer : Omicron Make
CPC100 : Omicron Make
Sverker : Relay tool Kit
Breaker Analyzer : Egil kit
ISA : Current Injection kit
MOM 600 : Contact Resistance kit, etc….
EXPERIENCE IN INDIA :-
COMPANY : ARINGAR ANNA SUGAR MILLS & CO GENERATION PLANT
LOCATION : KurungulamMelpathy Village
Thanjavur – 613303.
DURATION : March 2012 to January 2014
DESIGNATION : Electrical Engineer
JOB DESCRIPTION:-
Operation and Maintenance of Power Plant and sub-station.
Operation & Maintenance of 2x3MW Turbo Alternators Maintenances.
Operation and Maintenance of D/G Set 11KV, 450 KVA. CUMMINS.
Installation of LV switchgears, Motors, Lighting & Distribution Panels.
Attend breakdowns in plant.
Prepare daily report, remarks and equipment history.
COMPANY : SRI GANAPATHY ENTERPRISES (Electrical Design Engineer)
LOCATION : Ts.69/1, SIDCO Industrial Estate,
Ekkaduthangal, Chennai – 97.
DURATION : November 2010 to February 2012
DESIGNATION : Electrical CAD Designer
JOB DESCRIPTION:-
Preparation of Layout & Substation in AutoCAD
Preparation of 11kv/433v, 33kv/433v Project in SLD, along with all relevant calculationssuch as Sizing of the Cable, Selection of Circuit Breakers and Controls.
SOFTWARE SKILLS:-
•ELECTRICAL AUTO CADD
QUALIFICATION:-
COURSE COMPLETED
UNIVERSITY / COLLEGE
YEAR OF PASSING
GRADE
Bachelor of Electrical And Electronic Engineering
Anna University, Tamilnadu, India (Kings College of Engineering, Pudukkottai.)
May-2010
First Class
(63%)
H.S.C. (+2)
St. Antony’s Higher Secondary School, Thanjavur, Tamilnadu, India.
April-2006
Second Class (52%)
S.S.LC
St. Antony’s Higher Secondary School,
Thanjavur, Tamilnadu, India.
April-2004
First Class
(76.8%)
PERSONAL INFORMATION:-
Father Name : Marimuthu. R
Date of Birth : 02 April 1989
Nationality : Indian
Languages Known : Tamil, English
Passport No : H8840951
Date of issue : 08-JULY-2010
Date of expiry : 07-JULY-2020
Permanent address : 43-A, Moovendarnagar,
Maadhakkottai road, Thanjavur-Dist. - 613007
Tamilnadu-State,
DECLARATION:-
I hereby declare that the above information is true and correct to the best of my Knowledge and belief.
PLACE: Yours Truly
DATE: Vivek. M