EZEKIEL MADRONIO, PMP®

Al Dalal Bldg. A, Al Muraqqabat St.,Deira, Dubai, UAE

adc9s9@r.postjobfree.com

+971*********

PMP certified Planning Engineer with more than 7 years of experience in EPC contracts in Manila and Dubai combined. Has developed comprehensive Programme of Works for various high-rise building projects (hotels and condominiums), and infrastructure (roads and bridges) projects. Has assisted in Contractor’s Extension of Time claims for Arbitration. Advanced Primavera P6 and Microsoft Project 2013 user.

Master of Science in Civil Engineering Major in Construction Technology and Management

De La Salle University – Manila 2401 Taft Avenue, 1004 Manila, Philippines

2014-2016 Academically Complete

Bachelor of Science in Civil Engineering

Rizal Technological University

Boni Avenue, Mandaluyong City, Philippines

2006-2011

Philippines Licensed Civil Engineer:

PRC Reg No. 0122054

Excellent in Scheduling and DBMS Software (Primavera P6 ver. 8.4, Microsoft Project, Access)

Excellent in Microsoft Office (Project, Word, Excel Macros and PivotTable, PowerPoint, Outlook)

Background in AutoCAD, Photoshop, Illustrator

Excellent written & oral communication

Able to work with minimum supervision

PROJECT MANAGEMENT PROFESSIONAL (PMP) CERTIFICATION EXAM PREPARATION

Quadra Plus

Dubai, United Arab Emirates

July 26, 2019 to August 23, 2019

INTRODUCTION TO DELAY ANALYSIS & FORENSIC PLANNING

Project Management Institute-PMI

Dubai, United Arab Emirates

June 26, 2019

FUNDAMENTALS OF TUNNEL BORING MACHINE

First Balfour Inc. Headquarters

Km. 13, West Service Road, Sucat, Paranaque City, Philippines

August 15 to 22, 2016

PLANNING ENGINEER BOOSTER PROGRAM

Makati Development Corporation

Antipolo City, Philippines

February 15 to 19, 2014

ACCELERATION PROGRAM FOR PLANNERS

Makati Development Corporation

BGC, Taguig City, Philippines

January 20 to April 19, 2014

PROJECT MANAGEMENT INSTITUTE

Project Management Professional

Member ID No. 4135647

Certificate No.: 2642172

PROFESSIONAL REGULATION COMMISSION (PHILIPPINES)

Civil Engineer

Reg No. 0122054

PLANNING ENGINEER, Nov 2019 – Present

KAMAL KHAWAJA BUILDING CONTRACTING (MAIN EPC CONTRACTOR)

Rose Hill Gardens Dubai, Plot no. 3331429, at Al Badaa, Dubai, UAE

Mina Project, Plot no. PJCRC 38A_38H, at Palm Jumeirah, Dubai, UAE

Report Monthly and Weekly Report

Establish Clause 14 Programme and Baseline Programme Narrative based on project specification and FIDIC 1987 Red Book (at least 3,000 total activities and AED 90.5M project cost)

PLANNING ENGINEER, March 2017 – September 2019

DUBAI CONTRACTING COMPANY LLC (MAIN EPC CONTRACTOR)

ONE-JBR Residential Tower, Plot no. 392-0552, at JBR Marsa, Dubai, UAE

Le Meridien Mina Seyahi Hotel Extension, Plot no. 392-5304, at JBR Marsa, Dubai, UAE

Measure construction progress by Earned Value Analysis (S-Curve)

Establish Clause 14 Programme and Baseline Programme Narrative based on project specification and FIDIC 1987 Red Book (at least 6,000 and 5,000 total activities and AED 414M & 362M project cost respectively)

Set-up project calendar including taking into consideration UAE holidays

Collaborate with Construction Manager to define the required Activities and sequence of work. (Engineering, Procurement, Construction and Handover activities)

Assign Activity Codes to Activities with the Construction Manager to easily retrieve relevant activities.

Demonstrate contractual and non-contractual Milestones in the Programme.

Determine the Critical Path through the programme using Primavera P6

Prepare Information Request Schedule for Construction Manager

Load Schedule of Values to P6 programme as required by the consultant to track progress. (Resource/Cost Loading)

Track, analyze and report project status to Project Director

Regularly collect project progress data from site to be recorded as Actual Site Progress

Compare Actual to Planned Progress (Earned and Planned Value)

Forecast completion dates and prepare “look-ahead” reports

Whenever necessary, I present catch-up/recovery programme to demonstrate strategies to recover from delays.

Prepare daily, weekly and monthly reports to consultant for Billing.

Regularly Update Primavera P6 programme for reports to consultant.

Monitor planned and actual resources utilized at site.

Create baseline resource curves (manpower, equipment)

Compare Actual to Planned resource curves

Liaise with Construction Managers regarding resource requirements.

Track, analyze and report Key Performance Indicators (KPI) and KPI trends to forecast progress.

Review subcontractor programmes and ensure that these are in-line with the current programme.

Establish Working Programmes (Internal Programmes) with collaboration of Construction Manager

Analyze and present delays in the programme

Record delay events

Impact the programme with these delay events using Windows Analysis

Calculate the effects of delay on the programme (time and cost)

Report the result to Project Director and Consultant as required

Suggest recovery methods with the collaboration of Construction Managers

PLANNING ENGINEER, April 2015 – March 2017

FIRST BALFOUR INC. (MAIN EPC CONTRACTOR)

Sucat Paranaque City, Philippines

Analyze as-built program for Extension of Time (EOT) Claims (Nestle Phils. Bldg. & Site Dev.)

Rebuild as-built programme based on existing documents for EOT claims (Nestle Phils. Bldg. and Site Dev.)

Identify and qualify delay events in construction and report it to consultant.

Prepare narratives for every delay events for EOT Claim and have it reviewed by the contracted Expert Witness.

Retrieve relevant correspondence related to EOT Claim from project database to support the claim.

Impact the baseline programme with the delay events and report the result using Window Analysis to the contracted Expert Witness.

Assist in developing master programme and resource histogram for:

BUILDINGS (ABS-CBN Horizon Project, ABS-CBN Media Arts Project, ePLDT Data Center Project, FirstGen Office Bldg. Project)

ROADS AND BRIDGES (NLEX widening project)

TUNNELS AND PIPELINES (FirstGen Hydropower Project)

MASS TRANSIT (LRT Rehabilitation Project, MRT Capacity Expansion Project)

RENEWABLE ENERGY (Solar Panels Project, Windmill Substation & Transmission Line Project)

OIL AND GAS (LPG Storage Facility Project, Amine Oxide Project)

Load Bill of Quantities to Master programme to determine construction output rate (at least 13,000 activities and PHP 5.3B total project costs)

Present activity sequence to stakeholders (ALL PROJECTS MENTIONED)

Communicate the programme to the team and establish a clear vision of the requirements in order to deliver projects objectives (ALL PROJECTS MENTIONED)

Work alongside the commercial team to provide accurate reporting of the project status using EVM. (ABS-CBN Horizon, Media Arts Project only)

Overall evaluation and control of the assigned project schedules and schedule development.

Mentor Junior Planners about company standard reports (Dashboard Reports) for Planning and Control when necessary.

PLANNING AND CONTROL ENGINEER, (December 2013 – April 2015)

MAKATI DEVELOPMENT CORP. (MAIN EPC CONTRACTOR)

Celadon Park Manila Phase 3, Manila, Philippines

Develop the project baseline programme (Earthworks, Concrete Works, Steel Works, MEPFS, Architectural Fit out, Furnishing)

Develop monitoring database for actual costs and earned value

Debug and maintain construction accomplishment database (at least 8,000 total activities and PhP 1.4B project cost)

Keep in track of important milestones for Design submittals, Procurement of materials and Delivery, Construction, Testing and Commissioning

Prepare catch-up/fast-tracked programme and action plans

Conduct planning meetings to set direction during construction

Report project status and project forecast based on actual rates

QAQC ENGINEER / SCHEDULER, (January 2012 – December 2013)

SUMITOMO MITSUI CONSTRUCTION CO. (PHILIPPINES BRANCH)

Various locations in the Philippines

Ensure deviations of different structural steel shapes conform to AISC

Report daily progress of fabrication to site for daily monitoring

Prepare monthly targets and catch-up schedule (using MS Project only)

Prepare monthly accomplishment report (using Microsoft Project only)

Perform analysis of all KPI trends. (approx. PHP 1B project cost)

Lead and supervise the development of detailed inspection system

WORK EXPERIENCES:

PROFESSIONAL SUMMARY:

EDUCATIONAL ATTAINMENT:

KEY COURSE/ SKILL:

SEMINARS / TRAININGS:

PROFESSIONAL AFFILIATION: