Resume

Sign in

Electrical Engineer Project

Location:
Gurgaon, Haryana, India
Posted:
May 17, 2020

Contact this candidate

Resume:

Core Competencies

Project Management

Cost Optimization

Erection and Commissioning

Quality Control

Inspection

Operations & Maintenance/ Troubleshooting

Profit Centre Operations

Procurement

Team Building & Leadership

Targeting assignments in Project Management/ Erection, Testing & Commissioning with an organization of repute preferably PAN India/Overseas

Profile Summary

A competent professional with more than 19.6 years of experience in Quality Control, Project Management, Erection, Testing & Commissioning of all Electrical equipment’s.

Capable in conducting inspection of the incoming, in process materials, taking stringent quality measures & capably organizing quality awareness programs in the organization

Skilled in managing erection & commissioning activities engaging resource planning, in-process inspection, team building and coordination with internal /external departments

Expertise in conducting cost benefit analysis of the projects including the feasibility studies, assessment of the requirements, tendering work, interface as well as the commissioning

Proficient in developing & streamlining systems with capability to enhance operational effectiveness and meet operational goals within the cost, time & quality parameters

Experience in conceptualizing profitable projects and managing operations encompassing procurement, quality and industrial relations

Possess strong research, analytical, problem-solving and interpersonal communication skills

Career Timeline

Work Experience

Sept, 18 to till yet with Amrita Hospital, Faridabad,Haryana, India as Senior Site Engineer MEP

Key Result Areas:

Holding review meetings to monitor progress of the project as per schedule/ budgets, and ensuring timely completion and delivery of the project to the Medical team

Supporting design dept. to prepare GFC DRAWINGS and going through the Material submittals, method statement for approval as per project specification, BOQ & GFC drawings.

Monitoring projects with respect to cost, resource deployment, time overruns and quality compliance to ensure execution of projects within the time & cost parameters

Rendering roll-out assistance to Subcontractors project team and mentoring vendors to achieve the target goal

Taking the approval from Medical team for the mock-up, material submittal, inspection & Safety induction of project team & follow- up Architect consultant and Medical team for approval

Collaborating with various functions; ensuring optimum utilization of the resources and implementing & maintaining the quality systems; identifying critical parameters and processes which are hazardous in nature & undertaking steps for curtailing plant upsets, fluctuations, emergencies and associated risks

Identifying areas of quality failures and taking steps to rectify the system wide preventive and corrective actions to avoid the reoccurrences; practicing quality standards with key emphasis on improving quality and improvement opportunities

March,18- June, 18 with Parapillar Project Management, Secunderabad, Telangana, India as Project Manager (MEP)

Project Managed: Technip FMC Technologies, Nacharam.

Key Result Areas:

Mapping requirements and providing them best solutions involving evaluation and definition of scope of project and finalisation of project requirements as per contract and project specification

Managing and leading MEP & Interior decoration team members; allocating resources among team members and guiding team members during the project, till final delivery

Assisting sales department during tendering/bidding stage; coordinating with Estimating Dept. in preparation of Project Budget, Erection man-hours

Holding review meetings to monitor progress of the project as per schedule / budgets, and ensuring timely completion and delivery of the project to the client

Supporting design dept. to prepare GA DRAWINGS/ Shop drawings for client/ consultant Approval; preparing Material submittals for client approval as BOQ & GA drawing

Monitoring projects with respect to cost, resource deployment, time overruns and quality compliance to ensure execution of projects within the time & cost parameters

Rendering roll-out assistance to Client project team and mentoring vendors to achieve the target goal

Preparing mock-up, methods statement, risk assessment, material submittal, inspection & Safety induction of project team & follow- up Architect consultant and client for approval

Collaborating with various functions; ensuring optimum utilization of the resources and implementing & maintaining the quality systems; identifying critical parameters and processes which are hazardous in nature & undertaking steps for curtailing plant upsets, fluctuations, emergencies and associated risks

Identifying areas of quality failures and taking steps to rectify the system wide preventive and corrective actions to avoid the reoccurrences; practicing quality standards with key emphasis on improving quality and improvement opportunities

Oct’16-Sep’17 with Blue Star Oman Electro Mechanical LLC., Muscat, Oman as Project Engineer (Electrical)

Project Managed: Saraya Bandar Jissah Township, Muscat

Key Result Areas:

Managing parts of construction projects

Report to the Project Manager.

Ensuring that all materials used and work performed are as per specifications

Day-to-day management of the site, including supervising and monitoring the site labour force and the work of any subcontractors.

Liaise with main and sub-contractors to ensure smooth completion of tasks and adherence to site regulations.

Act as the main technical advisor on site for subcontractors, crafts people and operatives.

Ensure site complies within guidelines of health and safety and security

Overseeing building work

Setting out sites and organizing facilities

Checking technical designs and drawings to ensure that they are followed correctly

Supervising contracted staff

Ensuring projects meet agreed specifications, budgets or timescales

Liaising with clients, subcontractors and other professional staff, especially quantity surveyors and the overall to Project manager

Providing technical advice and solving problems on site

Preparing site reports and filling in other paperwork

Liaising with purchase department about the ordering and negotiating the price of materials

Ensuring that health and safety and sustainability policies and legislation are adhered to

Significant Achievements:

Ensured successful completion of the prestigious Saraya Bandar Jissah (Muscat Bay) within approved budget of 100 Million US $by continuous monitoring of budget movement and optimized utilization, as Project Lead

Conducted safety promotional activities:

Recognize the importance of safety and assign sufficient resources to handle it

Consider safety during planning and design stages to eliminate/reduce safety problems during later stages of the projects

Consider potential safety problems during preparation/vetting of method statements

Avoid performing unsafe acts - avoid creating unsafe conditions

Identify unsafe acts/conditions and ask for rectification

Contractor's Responsibility on Safety Training

Merit of completing quality projects within time by considering every opportunity and always be prepared to tackle new skills

Reduced the rejection rate by 2%and incidence of defects by 1%through measures such as by improving quality of works, explaining the methodology of work, by case study and so on

Steered the implementation of quality initiatives such as by improving work skills, Cost of quality, communication skills, by giving training to subordinates etc. instilled basic quality philosophies of doing things right the first time, resulting in 1% in company rework cost

Feb’06-Aug’16 with Larsen & Toubro LLC

Growth Path:

Supervisor Feb’06-Mar’07 (Project: Royal Oman Symphony Orchestra, Barkha Palace & Oman Cement, Rusayl)

Supervisor Mar’07-Oct’08 (Project: SBG Palm Garden Township, Sohar )

Electrical Engineer Oct’08-Nov’09 (Project: L & T Heavy Engineering Project, SIPC, Sohar)

Sr. Electrical Engineer Nov’09-May’12 (Project: Asian Beach Games Mussanah (Hotel Millennium)

Sr. Electrical Engineer May’12- Mar’14 (Project: Salalah International Airport)

Asst. Manager Electrical Mar’14-Aug’16 (Project: Hotel Crowne Plaza (Oman Tourism)

Key Result Areas:

Conducted proper quality assurance procedures by following a proper QA/ QC manual

Monitored erection & commissioning process and ensured completion of project in minimum turnaround time with an effective resource utilization for maximizing the output

Supervised MEP installation & commissioning and conducted tests & inspections for ensuring operational effectiveness

Recognized areas of improvement and recommended process modifications and equipment calibrations to enhance operational efficiencies of equipment

Analysed existing processes/procedures; conducted analysis for finding out shortcomings and suggested improvement measures; scrutinized proper workmanship by the help of in-house workers/ subcontractors

Took part in Weekly Site Progress Review Meetings with Consultants, Architects, Client, and Co-vendors

Managed cost control on Site activity while maintaining safety and quality measures

Rectified shop drawings, material submittals and method statement including as –built drawings

Prepared reports for management and ensured project documents were completed

Executed proper maintenance of:

Electrical Distribution Systems (LV & HV)

Lighting & Small Power Supply

Earthing & Lightning Protection

Fire Detection and Alarm, Security System

Building Management System

Data, Telephone & Wi-Fi System

Home Automations

HVAC and Pumps

Performed effective evaluation of all relevant drawings, specifications, BOQ's and estimates

Significant Accomplishments:

Completed the Asian Beach games Project (Hotel Building) work on time, despite of design changes during the crucial time of project without additional manpower and saved the cost of 24000 OMR

Previous Experience:

East India Company (Subcontractor of ABB, New Delhi) Metro Rail Project – Delhi as Site Engineer Aug’05-Oct’05

Reliance Energy, NOIDA (On Contractual Basis) as Site Engineer (Electrical) Nov’04-May’05

National Contracting Company Limited, Saudi Arabia as Supervisor Jan’02-Jul’04

Projects

Title: AL Khafji ARAMCO Joint Operations (Power Project, 3x30 MW Gas Turbines)

Period: Jul’03-Jul’04

Client: Aramco Gulf Oil Company

Designation: Supervisor (Electrical)

Title: Saline Water Conversion Corporation SWCC Project (Electrostatic precipitators) at Shoaiba – Kingdom of Saudi Arabia

Period: Jan’02-Jul’02 & Nov’02-Jul’03

Client: Hyundai Heavy Industries Limited

Designation: Jr. Supervisor (Electrical)

Title: Saline Water Conversion Corporation (SWCC) Project (Electrostatic precipitators) at Shuqaiq – Saudi Arabia

Period: Jul’02 - Nov’ 02

Client: Hyundai Heavy Industries Limited

Designation: Jr. Supervisor (Electrical)

SIGMA Engineering (Authorized Service Centre of Siemens), Faridabad as Dec’98-Nov’01 Service/Commissioning Engineer up to 66Kv

IT Skills

Windows XP/Vista/7/8/10

MS Office (Word, Excel, PowerPoint)

Internet Applications

Academic Details

B. Tech in Electrical Engineering from Intellectual Institute of Management & Technology in 2004, Delhi

Diploma in Electrical Engineering from Hindu Institute of Technology, Sonepat, State Board of Technical Education in 1998

Certification course in Solar photo-voltaic Off-grid and On-grid: Design & Installation from Iacharya, Chennai, Certification by SRRA, NIWE, Unit of MNRE in 2017

Personal Details

Date of Birth: 18th December 1975

Languages Known: English, Hindi & Malayalam

Permanent Address: House No.: 755, Sector-18, Faridabad-121002, Haryana, India.

Passport No.: U1214224 (Valid up to 11/ 2029)

Nationality: Indian

SANTOSH CYRIL MENEZES

adc9q3@r.postjobfree.com

adc9q3@r.postjobfree.com

+91-844******* +91-129-*******

Since Sept’ 18

Jan’02 – Jul’ 04

Feb’06 - Aug’16

Nov’ 04 - May’ 05

Aug’ 05 - Oct’ 05

East India Company, New Delhi

Reliance Energy, Noida

Larsen & Toubro LLC

Amrita Hospitals Faridabad

Blue Star Oman Electro -Mechanical LLC., Oman

National Contracting Company Limited, Saudi Arabia

Oct’16 - Sept’16



Contact this candidate