Post Job Free

Resume

Sign in

Engineer Project

Location:
In Buri, Sing Buri, 16110, Thailand
Salary:
60000
Posted:
May 12, 2020

Contact this candidate

Resume:

Page * of * Print Date: **.**.****

Experience Working Position Background TOEIC 2011 2005 China Project Responsibilities Client : : : University Bachelor Petroleum Master : Thai : : 715 Oil Detailed Experience Scheduling : Pipeline Pipeline 8 Score Construction) of years : of Young Engineering Pipeline Chemical (Test Extension in Network Engineer EPC Executive Date: 50/Engineering Main Co.Engineer, 2 Contractor to 20 E-Moo Ltd. Mobile North-mail: Contractor February CURRICULUM MBA, 2 Ms. Tubya, inakesunisa@East Phone: Mahidol Sunisa Co.Majoring 2016), Region of Inburi, Ltd. 086-Oil&In-University VITAE (0999230 19 Singburi gmail.Gas Ake Operations of Jun.Thailand Project com 2019 16110 (– (from Management, OPENE) Present) total Project 12 years Kasetsart – Main in

• Daily interaction with design people (internal company and all subcontractor)

• Prepare Weekly/Monthly Reports

• Prepare Weekly/Monthly Progress

• Prepare document/information/report as Client required Position IBC Project Responsibilities Client • Record Industrial : : PTT : Fifth Project minutes Public Transmission Co.: Control,of Co.Ltd. meeting Ltd. (6 Engineer Aug.Pipeline by 2018 real Project-– time 15 Jun.on Phase board 2019) II (English) (5TP2) Project – Main EPC Contractor

• all Daily subcontractor) interaction with design, procurement and construction people (internal company and

• Monitoring daily progress of all Page activity 2 of 5 of construction (~100 kilo-Pipes) Print Date: 04.10.2019

• Tracking discipline wise, site activities and checking progress at Site

• Prepare Daily/Weekly/Monthly Reports

• Prepare Daily/Weekly Look Ahead

• Prepare Weekly/Monthly Project Progress

• require Prepare and some getting document approve for Monthly Work Progress and Monthly Work Invoice as PMC

• curves Updating daily/weekly progress of construction work as per discipline, commodities, and S

• Prepare document/information/report as Client required Aug.Client Position Sinopec Project Responsibilities • Record 2018) : PTT : : Fifth International Project minutes Public Transmission : Control of Co.meeting Ltd. Service Engineer Pipeline by Petroleum real Project-time on Service Phase board I (((English) Thailand) 5TP1) Project Corporation – Main EPC (4 Apr.Contractor 2018 – 3

• Daily interaction with construction people (internal company subcontractor)

• Monitoring daily progress of all activity of construction (~100 kilo-Pipes)

• Tracking discipline wise, site activities and checking progress at Site

• Prepare Daily/Weekly/Monthly Reports

• Prepare Daily/Weekly Look Ahead

• Updating daily/weekly progress of construction work as per commodities, and S curves.

• Prepare document/information/report as Client required Position China Project Responsibilities Client • Record : Petroleum : PTT : Fourth EPC Progress minutes Public Contractor Transmission : Pipeline of Co.Control meeting Ltd. Assistant Bureau Pipeline by real (12 time Midline Sep.on 2016 board Compressor – (3 English) Apr.2018) Station (FTPMCS) Project – Main

• Daily interaction with construction people (internal company and all subcontractor)

• discipline Monitoring daily progress of all activity of construction and commissioning work of all

• Tracking discipline wise, site activities and checking progress at Site

• Prepare Daily/Weekly/Monthly Reports.

• commodities, Updating weekly and progress S curves of construction and commissioning work as per discipline,

• Updating daily progress of pre-commissioning/commissioning work

• commissioning/Monitor and follow commissioning up for delay Page work activities 3 of 5 of all discipline of construction Print and Date: pre- 04.10.2019

• Focal point of progress of Punch List status and present to others in the project

• Prepare document/information/report as Client required Position McConnell Project Responsibilities Client • Record : : PTT : Fourth Progress minutes Dowell Public Transmission : of Co.Monitoring/Constructors meeting Ltd. Pipeline by Reporting real Thai time (FTP) Ltd. Engineer on (Project 3 board Sep.2014 (– English) Main – 30 EPC Dec.Contractor 2015)

• Daily interaction with construction people

• (Monitoring ~300 kilo-Pipes) daily progress of all activity of construction work of all discipline of all area

• Tracking discipline wise, Daily manpower and site activities.

• Weekly/Focal point Monthly of all Work activity Progress of construction and Monthly work Work of all discipline Invoice. to prepare/calculate

• Monthly Prepare Work Monthly Progress Work Progress and Monthly and Work Monthly Invoice Work as Invoice, PMC require and the and backups getting document approve. for

• Extra Prepare Work Extra Progress Work Progress and Extra and Work Extra Invoice Work as Invoice, PMC require and the and backups getting document approve. for

• Prepare Daily/Weekly/Monthly Reports.

• curves. Updating weekly progress of construction work as per discipline, commodities and S Position Technip Project • Client Prepare : : Salamander : Bualuang Engineering (BLWPC) Project document/Engineer Field – Energy Main information/(Thailand) Development Conceptual (Bualuang) report Ltd. Phase Study (1 Limited as Oct.Client / 4, 2013 FEED Bualuang required – Contractor 2 Sep.Wellhead 2014) Platform Charlie Position Client Project Responsibilities : : Chevron : SAWF Project Infill : Thailand Engineer Topside Exploration Modification and Project Production –Main Limited Detailed Engineering Contractor

• Coordinate with Engineering Disciplines, Procurement, Cost Estimator people

• Focal point of proposal submission stage and procurement support activities

• Prepare Project Working Procedures as applicable

• Prepare Change Proposal

• Weekly progress, timesheet and Page cost 4 of 5 summary reporting Print Date: 04.10.2019

• Monitor filling and archiving project document

Client Project Sep.Thai Client Project Position Responsibilities • Position Project Ensure 2013) Nippon : : Technip : : CARIGALI-: : : Phase Phase Macedon Project Project Project that Proposal Steel deliverables 2 2 : Oceania – – Engineer Development Development Gas Main Main PTTEPI & Engineer Sumikin Plant EPCIC EPCIC Pty Operating are Ltd. Project Engineering issued of of Contractor Contractor JDA JDA Company and Block Block follow & B17, B17, Construction Sdn schedule Muda-Jengka-Bhd E B Wellhead Wellhead Corp., Ltd. Platform Platform (Jul.2011 (CPOC-(CPOC-– MDE) JKB)

• Procurement, Coordinate with Material the client Control and other and Offshore departments Support in the company, such as Engineering,

• at Face-the to-site. face interface with the client (construction site representative and client Inspector)

• sequence Coordinate and with schedule. construction team for material schedule for achieving construction

• document offshore Coordinate schedule and with coordinate offshore campaign. team with for Vendor supporting/team for sourcing/commissioning providing/as deliver required material, for achieving support

• Monitor/register deliverables and request outstanding return from the client.

• Accelerate document, procurement the originator document for project and document vendor e.document g. project for procedure, achieving drawing, project schedule. engineering Client • Position T.Foster C. control, hard follow approval, to Be Sealing the a :National Wheeler and focal : client. up Application pre-document soft report point & com/Pumping Power copies Service for to commissioning client all Engineer from Supply as final (Co.Thailand) per and an,document, Ltd. (the originator, NPS) management, client’s (and Aug.Ltd. Power specific 2009 including revise (requirement, May.Plant – and 2007 project Nov.and engineering, coordinate 2010) submit – Jul.monitor document. 2009) document with overall, QAQC, By logistics preparing/for prepare vendor, the to client’s send material content, compiling document Page 5 of 5 Print Date: 04.10.2019

Client Project Client Project Position Nikon Position Program Control Professional Prevention Engineering Referee Courses Project Microsoft Microsoft Primavera Project Project Project ::(Thai Bangpakong Thailand) :::Management Management Management Valve 2 2 2 : :Junior Attended Office Project Proposal Applicable x x x (of P6) 37.10.150 Power Trainee Sell Danger Technical 15 4 Supervisor MW MW Skill MW Co.Supply Engineer Power Course Circulating Workshop Principles Framework Blubbing Ltd. from and Blubbing Training (Triple (Radioactivity Supply TPS) Jun.at Fluidized Thaioil 2005– Training Fluidized Fluidized (Win 22 Power ((20-PMI) (BPK) Jan.21 Negotiation Dec.Public (Plant 8 Mar.2014) Training, (Bed 25-Power Bed Bed Jul.2006) 26 2010) Boiler Company 2014) Boiler Boiler Oct.Plant Training Level 2012) Limited I (3-(15-5 Aug.16 (1 Sep.Apr.2005) 2007) 2014 – 31 May.2014) Transmission Khun PTT teerapat.086-Construction 9965286 Public Teerapat l@Company pttplc.Manager Pipeline Leelavansuk com Limited Midline of Fifth Transmission Compressor Station Pipeline (FTPMCS) Phase-I (5TP1) Project Project and Fourth



Contact this candidate