Post Job Free

Resume

Sign in

Maintenance Engineering

Location:
Edmonton, AB, Canada
Posted:
May 10, 2020

Contact this candidate

Resume:

RESUME

Name : MOHAN MARUTHI KUMAR BALLA

Address : *-****,

38th avenue NW

Edmonton, T6K 298

CANADA

Contact Number : 1-587-***-****

E-mail Address :adc5uj@r.postjobfree.com

Status CANADIAN CITIZEN

Post Applied for :JOURNEYMAN PIPE FITTER

Educational Information:

•Alberta Red Seal Certification. J-21-106841,

•3 years apprentice as structural fitter, national council of vocational training at (Hindusthan Ship Yard Ltd)

•Matriculation at (Andhra University )

Duties and Responsibilities:

•Good knowledge on blue print drawings to read and understand ISO metrics, P&ID drawings.

•Fabrication of Pipe Spools such as Cutting, Grinding, Bevelling of Pipes and Joints Fittings are fit up as per procedures / Shop Drawings.

•Installation of spools as per P&ID and ISO metric drawings.

•Flushing and Reinstating of spools after hydro testing.

•Preservation of valves, hubs and bolts for commission.

•Punch list clearance of piping as per Quality Control Inspector Instruction.

•Hydro testing of pipe spools and pipe lines as required bar pressure with all safety precautions / procedures

•Hydro Testing and pnewmatic test for all sizes of Ms and ss pipes.

Employment History

Pipefitter THE GISBORNE GROUP BC (EVO,Elkview coal corp shutdown BC). 3/15/2020-4/4/2020

Pipefitter AECOM Maintenance ltd(CNRL,Abian sands MRM outage) oct 26th 2019 – nov 10th 2019

Pipefitter AECOM Maintenance ltd(KEARL,K1,Froth shutdown fortmech SEP 1 2019 TO OCT 7 2019

Pipefitter AECOM Maintenance ltd (CNRL Albian sands JPM outage Aug 132019 To 20 Aug 2019

Pipefitter AECOM maintenance ltd ( KEARL outage opp2,fortmech july 26 2019-july 29 2019

Pipefitter AECOM Maintenance ltd (KEARL outage opp1,fortmech) JULY 18 2019-JULY 21 2019

Pipefitter AECOM Maintenance ltd(KEARL K1 5Days outage,fortmech) JUNE 18 2019-JUNE 23 2019

Pipefitter AECOM Maintenance ltd(KEARL K2 Shutdown,fortmech). MAY 4th 2019-june 1st 2019

Pipefitter AECOM Maintenanceltd(CNRL Albian shutdown) - 10-20-2018 to 10-24-2018

pipefitter AECOMMaitenance ltd(CNRL Albian sands shutdown) - 09-05-2018 to 09-22-2018

Pipefitter/hydrotesting,pcl energy,Chinook powerstaion,swiftcurrent. 08-08-2018—08-30-2018

Pipefitter/hydrotesting, jvdriverfabricatorinc (niskumodyard). 18 june 2018—23july 2018

Pipefitter/hydrotesting Jacobs industrial services ltd 11thapril 2018-06 may 2018

Pipefitter/hydroteastingAecom maintenance ltd25 march 2018-04 april 2018

Pipefitter, pclenergyinc(Suncor,Forthills) 27 march 2017-8thdec 2017

pipefitter, jvdriver fabricators inc (nisku mod yard) 4th april 2016 - 23th sept2016 pipefitter,DLI industrial constuctioninc. 9th july 2015-12th august 2015

Pipefitter,Innovators Industrial services inc(Husky sunrise project). 28th Feb2015-29th june 2015

Pipefitter,jvdrivers fabrication inc(Nisku mod yard) 14th oct 2014-4th feb 2015

PipefitterWillbros(canada)GPIV Limite 25sep 2014—10th oct 2014

Pipefitter ursflint,choncophlipsfortmechmurry 17th may 2014-31st july2014

Pipe fitter Urs flint nova Chemicals joffre 2013 11thsep – 21th Sep 2013

Pipe fitter/ Hydro Testing Jvdrivers Fabrication inc, (NISKU Mod Yard,

Edmonton, Alberta, Canada 2012 11thjan – 30th Aug 2013

Pipe fitter, PCL Industrial Constructors INC, (Edmonton, Alberta, Canada) JAN 2010-JULY 2010

Pipe fitter/Hydro testing,KLN enterprises (HPCL co ltd,AP, INDIA) OCT 2008 -JAN 2010

Pipe Fitter, Jacobs Industries, ( Edmonton, Alberta, Canada) APRIL 2008-SEP 2008

Pipe Fitter/Hydro testing,Srinivas engineering( HPCL co ltd,AP,INDIA) April 2006-april 2008

Pipe Fitter/Hydro Testing, Essa Engineering & Marine Services LLC( U A E ) JULY 1998-FEB2006



Contact this candidate