RESUME FOR ELECTRICAL FIELD ENGINEER
Shetalkumar.Patel
Mobile:+971-*********
E-Mail: ********************@*****.***
************@**********.***
Intend to build a career with leading industries with committed & dedicated people which will help me to explore myself fully and realize my potential. Willing to work as a key player in challenging & creative Environment.
BRIEF OVERVIEW
Work experience is 17 years MEGA POWER PLANT/OIL REFINERY/RETAL IN THE FIELD OF CONSTRUCTION
Four Years Degree in ELECTRICAL from M.S. University.Vadodra.
Acquired knowledge and understanding of programming & Microsoft Word & Microsoft Excel.
Excellent team player with strong analytical and leadership skills.
Ability in learning new concepts quickly and communicating ideas effectively. WORK EXPERIENCE
I. December 2018 TO Till Date
Position Held : Electrical Engineer
Job Site : SITIE IMPIANTI INDUSTRIALI SpA. JAMEX (CCPP 700 MW Jebel Ali Power Station M-Extension Project) .
DUBAI, UAE
JOB DETAILS:
Schedule Electrical work of planning & execution of stage wise Electrical and I&C activities of HVAC work like Installation of LV Transformers, HVAC Panels, UPS system, Panel modification work. Electrical LV and I&C Cable laying, Dressing, Glanding, Termination & Testing work. Installation of Instruments & Equipment’s work.
Coordination with other counterparts like Mechanical & Civil team. The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to Commissioning of Electrical System.
Responsibility:
Reporting to the Site Manager & coordination with Client, DesignTeam for Drawing & Installation Quires. My responsibility is to lead the work with contractor team. Major challenge is to generate more cable laying dressing, Glanding End Termination & Testing work front with coordination among various disciplines and agencies and complete the projects as per the schedule targets. II. August 2017 TO November 2018
Position Held : Electrical Engineer
Job Site : SIEMENS LLC. JAMEX (CCPP 700 MW Jebel Ali Power Station M-Extension Project).
DUBAI, UAE
JOB DETAILS:
Schedule Electrical work of planning & execution of stage wise Electrical and I&C activities like Installation of Power & Distribution Transformers, MV & LV Panels, Battery Chargers, UPS system, Panel modification work. Electrical (MV & LV) and I&C Cable laying, Dressing, Glanding, End Termination & Testing work. LDBs, PDBs & Power Sockets installation work,
Installation of Earthing Grid comprising of treated Earth pits, Laying of Earthing Cables & Earthing Joints work. Coordination with other counterparts like Mechanical & Civil team. The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to Commissioning of Electrical System.
Responsibility:
Reporting to the Site Manager & coordination with Siemens Engineers, DesignTeam for Drawing & Installation Quires. My responsibility is to lead the work with contractor team. Major challenge is to generate more cable laying, dressing, Glanding End Termination & Testing work front with coordination among various disciplines and agencies and complete the projects as per the schedule targets. III. August 2012 TO August 2017
Position Held : Electrical Manager
Job Site : RELIANCE Retail (Surat)
JOB DETAILS:
Schedule Electrical work of planning & execution of stage wise electrical activities like Installation of Power & Distribution Transformers, LT Panels, Battery Chargers, UPS system, HT / LT cabling, End Terminations, Cable tray Installation, Light fixture installation, LDBs & PDBs installation, Earth strip installation, etc in coordination with other counterparts like mechanical & civil team. The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to Commissioning of Electrical System. IV. September 2011 TO May 2012
Position Held : Deputy Manager
Job Site : Essar Project India Ltd.,
Essar Oil Refinery Project, Vadinar, Jamnagar.
JOB DETAILS:
Schedule Electrical work of Delayed Cracker Unit (DCU) The work involves planning & execution of stage wise electrical activities like Installation of Power & Distribution Transformers, LT Panels, Battery Chargers, UPS system, HT / LT cabling, End Terminations, Cable tray Installation, Light fixture installation, LDBs & PDBs installation, Earth strip installation, etc in coordination with other counterparts like mechanical & civil team. The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to Commissioning of Electrical System.
V. April 2010 TO June 2011
Position Held : Sr. Electrical Engr. (Construction) Job Site : GALFAR ENGINEERING & CONTRACTING SAOG.
OMAN
JOB DETAILS:
A) 11KV & small power job Distribution Network for External work at Ship repair & Dry Dock Project at Duqm Project.
TOTAL SCOPE – 580 KMS.
TOTAL JOINTS – 18NOS.
TOTAL TERMINATION – 220 NOS.
TOTAL TRENCH LENGTH – 20KMS.
DURATION OF WORK – APR 2010 TO JANUARY 2011
B) OFFSITES, SHIP REPAIRE & DRY DOCK PROJECT :
SHIP REPAIRE & DRY DCOK PROJECT WORKS
Schedule electrical work of Cable laying, LPDBs/PDBs & Light Pole Installation Work : The work involves planning & execution of stage wise electrical activities like LT & HT cable laying, end terminations, cable tray installation, light fixture installation, LDBs & PDBs installation, earthling cable installation, street light pole and flood light installation, The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to O & M for commissioning.
VI. May 2005 TO April 2009.
Position Held : Electrical Engr. (Construction)
Job Site : RELIANCE ENGINEERING ASSOCIATES PVT. LTD. JAMNAGAR.
JOB DETAILS:
A) 33KV Job Distribution Network for JERP (Jamnagar Export Refinery Project).
TOTAL SCOPE – 260KMS.
TOTAL JOINTS – 560 NOS.
TOTAL TERMINATION – 138 NOS.
TOTAL TRENCH LENGTH – 12.8 KMS.
DURATION OF WORK – APR 2007 TO MAY 2008.
(B) OFFSITES, JERP PROJECT:
Enabling Construction Power Network for JERP (Jamnagar Export Refinery Project). The work involves handing of 125 plus DG sets ranging from 40 kva to 500kva to cater power supply in each & every corner of complex to facilitate Offsite construction. The network was comprising of 500 plus dist. Boards (63A to 800A), 3000 plus light fixtures & immense cabling. It was a challenging job to cater power supply to 2000 plus welding machines & 500 plus Stress Reliving units.
FLARE: Schedule electrical work of HP/LP & FCC/Cocker Flares. The work involves planning & execution of stage wise electrical activities like LT cabling, end terminations, cable tray installation, light fixture installation, LDBs & PDBs installation, earth strip installation, street light pole/flood light pole installation, etc in coordination with other counterparts like mechanical & civil team. The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to O & M for commissioning.
OWS LIFT STATIONS: Schedule electrical work of OWS Lift Stations. The work involves planning & execution of stage wise electrical activities like LT cabling, end terminations, cable tray installation, light fixture installation, LDBs & PDBs installation, earth strip installation, street light pole/flood light pole installation, etc in coordination with other counterparts like mechanical & civil team. The job includes completion of work, testing & subsequent hand over with As-built documentation of the whole system to O & M for commissioning.
(C) REFINERY SHUT DOWN JOB – 2005:
Schedule & Enabled Job for VMP Value Maximizing Project in FCCU Plant in DTA Refinery Complex, JAMNAGAR
Installation of 40 MVA Construction Power network to cater power supply requirement of Mega Shutdown of DTA Refinery. The shutdown was meant for Hooking up the facilities of VMP projects. The network comprises of 10 nos. 2 MVA transformers, numerous Dist. Boards ranging from 63A to 800A. The shutdown carried out under classified zone, hence equipments installed were meeting the requirement of classified zone.
(D) Benzene REVAMP job GOP Plant at IPCL Refinery Complex.
Major revamping work carried out in plant w.t.r addition of facilities like Columns, vessels etc. The work includes replacement of HT/LT motors, upgradation of existing electrical distribution & enhancement of existing lighting system.
JOB DETAILS:
Continuous monitoring of Distribution Network during Refinery shutdown, which was held in Nov`2005.
Erection, Testing, Commissioning of 2 MVA, 6.6/0.433 KV Voltamp make Transformer.
10nos, Siemens make Switchgear, PCC and MCC as per the FDC.
Installation of Earthing Grid comprising of Treated Earth Pits, Earthing Bus-Bar Risers etc.
Installation nos. of 800 Amps, 400 Amps, 125 Amps DB`s having Earth Fault Protection.
Area Lighting Structure Lighting, Column lighting. VII. February 2000 to January 2001
Work Held : Production Supervisor
Contractor : VOLTAMP Transformer Ltd. (Baroda)
JOB DETAILS :
In Winding section
I have done supervising in winding section different type of Windings as disc continues (single & Double) L.V.
& H.V. Winding, spiral winding (L.V.) spiral with 2- Distributor crossover winding, Helix winding, Interlive Disc single & double conductor winding, Distribution Crossover winding.
In Assembly section
I have done supervising in assembly section as core built up, assembly of coil & Insulation, inside structure of Transformer, C.T. & P.T. assembly, L.V. & H.V. Bushing Erection, O.L.T.C. fitting & different type of Auxiliaries.
In Testing section
I have done winding Resistance Test, Ratio Test, B.D.V. Test and Magnetic Balance Test of Transformer. VIII. February 1998 to January 1999
Work Held : Electrical Supervisor
Project : Construction of 210 MW Unit No. 7 at Wanakbori Thermal Power station (G.E.B.)
Contractor : Ahmedabad Electrical Company
JOB DETAILS:
Erection & commissioning of 415 Volt Switch gear Panels for Unit Service Auxiliaries, Boiler MCC, Instrumentation Controls etc.
Laying of Cable Trays for 400KV switchyard auxiliaries, 6.6KV & 415V HT/LT switchgears, Motors, Transformers, required for Generator and Boiler auxiliaries.
Different type of Earthing for 6.6KV & 415V HT/LT switchgears, motors, Transformers, Breakers in switchyard Preparation of Earthing Pits & grid.
Erection of 415V motors, required for Turbine Auxiliaries.
Erection & commissioning of 6.6KV/415V Unit/Station service transformers, Ash Handling Transformer. EDUCATION
Sr. No
Exam Passed
Year Of Passing Board/
UNIVERSITY
1. B.E. Electrical. NOVEMBER-2004 M.S.UNIVERSITY
2. D.E.E SEPTEMBER-1997 M.S.UNIVERSITY
STRENGTHS
Positive Attitude.
Team work Spirit & Portable and flexible, can adjust in any circumstances.
Willingness to learn.
Definitely complete any work after determination. PERSONAL INFORMATION
NAME : SHETALKUMAR.PATEL
YEAR OF BIRTH : 17-07-1976
ADDRESS : HOME
S/o Maganbhai Patel
At & Post Jujwa Patel Faliya.
Tal & Dist Valsad-396001
GUJARAT, INDIA.
Mobile: +91-701*******, +91-972*******
Marital Status : Married
PROFESSION : ELECTRICAL ENGINEER
E-MAIL ADDRESS : ********************@*****.***,
************@**********.***,
NATIONALITY : INDIAN
SEX : MALE
PASSPORT NO. : T3087176
DECLARATION
I hereby declare that the statements furnished above are true and correct to the best of my knowledge, belief and information.
(Shetalkumar Patel)