GERALD LOUIE SY SARZONA
Bldg No.*, Al Mansoura, Doha, Qatar
Contact Numbers: +974-****-****
*********@*****.***
PROFESSIONAL REGISTRATION
Registered Civil Engineer
PRC License No. 0125840
PMP Certificate
Detail-oriented Licensed Civil Engineer with a zest of solving complex problems. Seeking to use proven Project Management, Technical/Design Skills in both Civil and Architectural to improve quality, cost and time. Completed $35 M projects with 10% under budget and within the specs. Education
2007 – 2012 Mapua Institute of Technology
Muralla St. Intramuros Manila, Philippines
Bachelor of Science in Civil Engineer
• Completed Projects – Construction of Surface and Foul Water Tanks, Blockworks for Al Thumama Stadium, Doha, Qatar (2018-2019)
• Completed Projects – Doha Metro, Greenline Underground, Qatar (2016-2018)
• Completed Projects – Seda Hotel, Philippines (2013-2016)
• Civil Engineering Licensure Examination, November 2012
• Site Management (Structural/Fit-outs) – Expert, 2013 - Present
• Technical Coordination (Structural) – Expert, 2013 - Present
• Technical Coordination (Fit-outs/MEP) – Advanced, 2016 - Present
• Quality Control (Structural/Fit-outs) – Expert, 2013-Present
• Quality Assurance (Methods, Submittals) – Advanced, 2015 - Present
• Quantity Surveying, Procurement, Contracts – Intermediate, 2018 - Present Achievements
Experience Summary
Experience
• Turnkey Trading and Contracting, November 2018 – Present Teba Egg Poultry Farm Project and Performance Marine Factory – Civil and Architectural Works, Doha, Qatar
Quantity Surveyor
- Worked on tender documents to provide initial cost advice. Creating BOQ, rate analysis, cost information, estimating and pricing work, quantity take off as per standard measurements for $11M Projects.
Al Thumama Stadium and Precinct – RC Works for Surface and Foul Water Tanks -
$500,000 Project, Doha, Qatar
Site Engineer
- Supervised for the construction of tanks with approximately 3000 cubic meter of concrete, 800 metric tons of Reinforcements
- Quantification of total progress prior to billing Technical Bolts Factory – Structural, Architectural, MEPFS Civil Engineer/Site Engineer
- Technical Coordination for Site Works
- Coordination with Subcontractors and suppliers as per requirement
- Evaluation of Tenders submitted by contractors and suppliers for upcoming projects
- Site logistics management
• Imar Trading and Contracting Co. W.L.L, November 2016 – November 2018 The Greenline Underground Project – Architectural Fit-outs, Doha, Qatar Civil Project Engineer, Site (Al Shaqab Station and Qatar National Library Station)
- Responsible for Screed Works/Flooring Finishes, Wall Structure - Finishes, Ceiling Structure - Finishes, Column Vault-Cladding
- Found multiple design flaws and made solutions preventing catastrophic future and saved cost
- Prepared Daily, Weekly Progress and Productivity Reports
- Reported Directly to Construction Manager and Coordinates with all Construction Departments e.g. Planning, Design, Safety, QS
- Prepared all documentation needed before commencement of works e.g. IRE’s (Inspection Requests of works), MIR’s (Materials Inspection and Approval), Safety Requirements and conducts Tool box talk.
- Coordinated and attended meetings with Contractors regarding issues on site to continue works without any delay
- Coordinated with 3rd
Party Quality Inspector and Owner’s Representative for updated drawings, Materials and Methods approval and updates
- Follow up and coordination with design team regarding any drawing clashes especially on as built of Structural Works and on-going MEP works to avoid problems and delays
- Managed all Sub contractors, provide site instructions and look ahead targets to meet schedules and quality of works
- Also conducted daily Tool Box Talk with Safety Officer and all Workers to ensure working safely
- Attended all necessary trainings to increase competency, to be able to make decision without compromising Project’s goal
- Checked Logistics regarding day to day requirement of projects
• Makati Development Corporation, August 2013 – November 2016 Vertis North Project – CBG and SEDA Hotel Projects, Philippines Structural Supervisor, Reinforcement Bars Engineer, QC (Seda Hotel)
- Finished project ahead of schedule and under budget (Structural Works) – Seda Hotel, Vertis North, Quezon City, Philippines
- Rebar Coordinator. Managed Rebar engineers of other projects regarding with their Rebar requirement, cutting list status and approval and schedule of deliveries to serve the priorities of all projects to meet targets
- Structural Works Inspector. Carried out inspections especially on Rebar Works, all according to Specifications, Quality and coordinated with design consultant on changes as per actual on site. Also, responsible in Formworks inspection, installation of Pre-cast (Walls and Slab) and Concreting. Helped Concreting Engineer in realizing Concrete look-ahead schedules and ordering of concrete.
- Supervised work activities on site including Structural Excavation, Site logistics and Temporary works
- Used Autocad in producing Cutting list and take-off using MS Office; coordinated with Design Consultants on the approval of cutting lists before implementing on site
- Made savings by having the quantities estimated and executed on actual for the structure re-conciliated with proponent's 3rd party
- Evaluated Progress Billings of Subcontractors and Reconciliation of Quantities
- Supervised equipment usage, productivity and allocation to maximize output of all the equipment e.g. Tower Crane, Vehicle Mounted Crane, Boom Truck, Backhoe etc.
- Review of Structural Plans, Changes and Clashes with Architectural and MEPFs in coordination with Design Team for the updated drawings.
- Bottom line, have experience in all around Structural Works in Construction and had Architectural Experience especially on checking clashes and layouts on Fit-outs
Field Engineer – Bulk Excavation and Slope Protection Works
- Supervised work activities on site including Site logistics and Temporary works.
- Coordinated with the Excavation Contractor and SP Contractors together with the Line and Grade team to ensure completion with quality assurance
- Monitored excavation works, daily equipment productivity and weekly accomplishments
- Evaluates Progress Billings of subcontractors
• TAB-Con and Metal Industries Corp., January 2013 - August 2013 Building Improvement Project, Monde-Nissin Corp., Sta. Rosa, Laguna Site Engineer
- Prepared Daily and Weekly Reports including Activities, Manpower and Site Equipment
- Assists in Construction Issues, coordinates assigned engineering work within the project. Helps in preparing Progress Billings
• Project Management Professional, April 2018
• SLT (Supervisory Leadership Training)
Safety Trainings, 2017-2018
• Infrastructure Training, February-March 2017
• Project Management – Advanced
• Site Works/Coordination – Advanced
• Estimates - Expert
• Autocad -Expert
• Math - Expert
• Physics - Advanced
• Problem Solving - Expert
• Interpersonal Skills – Expert
• Detail Oriented – Expert
• Leadership – Expert
• Resiliency
Trainings and Seminars
Hard Skills
Soft Skills