SRIRAM PALANIVELU
Yusuf flats,AMA Nagar,Nizam Colony
Pudukkottai,India
Mobile No : +91-978*******
Email : adc2lz@r.postjobfree.com
Skype id : sriram0212
OBJECTIVE
Seeking an active Position to utilize my skills and abilities in your esteemed organization providing creative, high quality solutions for challenging Oil & Gas Maintenance field. CAREER BACKGROUND
Experience with Nine Plus Years in Refinery and Petrochemical Complex Electrical Maintenance which has provided me a vast knowledge.
PRESENT : DECEMBER 2017 TO FEB 2020
Client :M/sKuwait Oil Company, South East Kuwait(Effluent Water Disposal Plant-2) Designation: Supervisor
● Planning, Scheduling and Troubleshooting of Maintenance activities.
● Prepare PTW,e permit,Job Safety Analysis,Tool box Talk.
● Preparation of Maintenance spares for the Transformer,DG set,UPS,Battery charger,,MCCs,LDBs,PDBs,ELDBs etc..,
● Preparation of DPR,WPR,ISO Reports
● Assisting with the Superiors during the technical review meeting and preparation of MOM (Minutes of meeting).
● Working in the EBEAMS.
● Ensure Safety in the site and share the learning from Incidents from the rest of units/Plants.
● Following KOC standards in Maintenance & Additional Projects.
● Follows Safety, Environment and quality policies of the company. PRESENT : AUG-2016 TO DECEMBER 2017
Company:M/sReliance Industries Limited,Jamnagar
Project : Reliance Industries Limited is setting up a Petrochemical Complex at Jamnagar,Gujarat . Working in HPIB and IIR Complex in addition with worked in the World largest ROGC unit for the completion of the Commissioning activities in a target time & Maintenance Activities for trouble free function.
Designation:Electrical Maintenance Engineer.
● Planning and Scheduling of Pre Commissioning and Commissioning & Maintenance activities.
● Preparation of Maintenance spares for the Transformer,DG set,UPS,HVAC,Battery charger,PCC,MCC,PMCC,Motors,LDBs,PDBs,ELDBs etc..,
● Preparation of DPR,WPR and MPR Pertinent to electrical Discipline.
● Preparation and allotment of Day to Day Commissioning & Maintenance activities as per the Management direction.
● Issues raised during the Installation, Commissioning & Maintenance activities are sorted out in a stipulated time.
● Involved in the PCC and MCC relay testing & Maintenance activities.
● Done the Installation, commissioning & Maintenance of Electric Heat Tracing in the Pipelines
● Done the Installation & Maintenance of Impressed Current Cathodic Protection for Tanks.
● Done the Commissioning & Maintenance of PDBs & LDBs etc
● Involved in Checking of Power Circuit at Flow transmitter from the UPS Main DB at field.
● Ensure Earthing Connection for equipments,Distribution Boards,Ladders/SS,motors etc
● Involved in Pre commissioning activities of Pilot burner Distribution boards in Hot section Furnace area.
● Involved in Safety lock arrangement at the rear side of the PCC and MCC panels at Substation.
● Reviewing of Electrical Load List and Consumer List.
● Reviewing the Vendor documents like Motor and Transformer and Provide Comments based on PMC Specifications.
● Reviewing of Testing & Maintenance Procedure for Electrical Equipment like HV &,LV Motors, LV & HV Switchgears.
● Reviewing of Techno Commercial Evaluation of offers and Preparation of Technical Recommendation.
● Reviewing of Overall Key Single Line Diagram, Single Line Diagram for HV & LV, Equipment Layout Drawings.
● Assisting with the superiors during the technical review meeting and preparation of MOM (Minutes of meeting).
● Preparation of Project Status Report for Management, Technical Specifications and Datasheets, Technical Drawings for Electrical equipment like Transformer, Motors, Battery Chargers.
● Provide comments and feedback on Equipment Datasheet and Electrical Equipment Drawing from Design to Construction based on our Technical Specifications.
● BOM Preparation for the all the Electrical Equipment’s.
● Creation of Equipment Tag in the SAP.
● All the Soft activities are done through the SAP MM module.
● Ensure Safety in the site and share the learning from Incidents from the rest of units/Plants.
● Preparation of Hand Over and Take over documentation.
● Process Safety Management module preparation and submission of documents before auditing.
● Working in Master material management system for the capital and pre commissioning spares.
• Batch data communication documentation preparation for the code creation of the SAP code.
● Preparation of Consolidated list of motors from different plant to maintain the common spares. PREVIOUS : FEB-2011 TO AUG-2016
Company: Nagarjuna Oil Corporation Limited (NOCL), Tamilnadu Project : Nagarjuna Oil Corporation (NOCL) is setting up a Petroleum Refinery at Cuddalore, Tamilnadu. A whooping investment of around $4.5 US Billion by a private sector in the south zone of India for constructing a refinery which has crude refining capacity of around 6MMTPA(Million metric tons per annum).
Designation: Electrical Engineer(Maintenance & Projects)
● Maintained & ensure trouble free operation of 22KV Construction power system and its Connected Loads.
● Maintenance schedule Preparation and Execution for the Transformers,PCC s,MCCs.DG set,UPS,Split Air Conditioners,PDBs,LDBs,Earth Pits,Highmast Lightings.
● Preparation of Maintenance DPR,WPR and MPR Pertinent to electrical Discipline.
● Preparation and allotment of Day to Day Maintenance activities in Construction power system.
● Follow up with concerned AMC agencies for the Completion of Work in the Optimum period for UPS, DG Set, Split Air Conditioners.
● Regular patrolling & Maintenance of 22KV Overhead Transmission line.
● To co ordinate with Electrical Inspector from the Chief Electrical Inspector to government of Tamilnadu for the Rule 46 Inspections.
● To Co ordinate with Electrical Inspector for approval of the Contractors DG Set at Site used by Construction Contractors.
● Maintenance Planning,Spares and Consumables Inventory Management for Construction Power System.
● Preparation of Relay Test Reports for Construction Power Systems.
● Reviewing of Electrical Load List and Consumer List.
● Reviewing the Vendor documents like Motor and Transformer and Provide Comments based on PMC Specifications.
● Reviewing of Testing Procedure for Electrical Equipment’s LV & HV Switchgear, Motor.
● Reviewing of Techno Commercial Evaluation of offers and Preparation of Technical Recommendation.
● Reviewing of Overall Key Single Line Diagram, Single Line Diagram for HV & LV, Equipment Layout Drawings.
● Assisting with Electrical Managers for Refurbishment Activities of Electrical Equipment like Transformers, HV & LV Motor.
● Assisting with Electrical Managers for Preparation of Planning and Schedule of work for contractors.
● Assisting with Superiors for Inspection of received materials for the EPCMs,BOOT,LSTK contractors.
● Assisting with the superiors during the technical review meeting and preparation of MOM (Minutes of meeting).
● Preparation of Project Status Report for Management, Technical Specifications and Datasheets, Technical Drawings for Electrical equipment like Transformer, Motors, Battery Chargers.
● Provide comments and feedback on Equipment Datasheet and Electrical Equipment Drawing from Design to Construction based on our Technical Specifications.
● Direct and Co ordinate Manufacturing, Construction and Installation, Support Documentation and Testing activities to ensure compliance with specifications and Customer requirements.
● Co ordination with Warehouse for Material Receiving Report (MRR) and Checking of OSD (Overall Shortage Damage) and taking up suitably with the vendors for timely replacements.
● Co coordinating with Finance for the Certification of Vendor Invoices.
● Thorough Verification of Complete Receipt of Material in accordance with WO/PO & Issuing Closure Order to the Vendor.
● Maintaining all Records of Issued WO/PO.
● HT and LT Motor sending for refurbishment & preparing Checking list before and after refurbishment in addition with witness test.
● Co ordination with PESO to obtain Approval of Hazardous Area Classified HV/LV Motors
(Refurbished).
ACADEMIC CREDENTIALS
Course Institute Board/University Period Percentage B.E
(ELECTRICAL AND
ELECTRONICS
ENGINEERING)
K.S.Rangasamy College of
Technology, Tiruchengode
Anna University,
Chennai
2006
2010 78.00%
HIGHER SECONDARY
CERTIFICATION
P.A.Vidya Bhavan Higher
Secondary School,Karur.
State Board of
Tamilnadu
2004
2006 85.00%
SECONDARY SCHOOL
CERTIFICATION
Arumugham Academy
Matriculation Higher Secondary
School,Karur.
Matriculation
2003
2004 81.18%
PERSONAL DETAILS
Parent’s Name
Mr. C.Palanivelu,Mrs.N.Periyanayaki
Date of Birth 02.12.1988
Age 32yrs
Marital Status Single.
Nationality Indian.
Languages Known Tamil & English (to speak and write) Passport Number &Validity J1270054 & 01 03 2021
DECLARATION
I hereby solely certify that the information furnished above is true to the best of my knowledge. Date:
Place: (P.SRIRAM)