DENNISRUBERY
** ******** ******, ******, ******** DD38DJ • Home: 013**-****** • Mobile: 078******** •
adbvj2@r.postjobfree.com
Summary
I have been involved in the oil and gas industry since 1991, Started my career working on the drilling and exploration as a roustabout then moving onto a floorman working with various companys over the years, I decided to move my career forward on construction and engineering and re-training. I am Ecitb registered nvq level 3 rigger with a diploma in moving loads and also opito approved stage 4, valuable experience onshore and offshore construction site, Quality workmanship, keeping calm when undrer pressure to finish work scope deadlines and following safe codes off practice and regualtions at the worksite. Also I have working supervisor experience as onsite lift planner for moving loads, Using power point or excel
Skills
Self-motivated and team leadership
Dependable and reliable
Health and safety attitude
Effective at multi-tasking
Works well independently
Knowledge of safety procedures
Work History
Rigger, September 2017- Present
Enermech cranes ltd- Aberdeen Scotland,UK
Working self employed as Rigger on various projects through out the north sea and irish sea working on cranes and assisting crane mechanics from crane boom change outs to installing new booms, Removing crane engines and replacement,Removing and installing new wire ropes various dimensions, Assist in load testing to pump and spline inspections Slew ring removal and replacement Crane jacking Winch operator for spooling. Using rigging devices and rigging gear understanding lift plans and tool box talks
Rigger, July 2017 – August 2017
Holden Ltd - Aberdeen Scotland, UK
8 weeks working as self employed at scapa flow on the safe borias floatel installation of pipework and stiffner beams inside the voids and outside on the module. Understanding lift plans and tool box talks
Using rigging devices and rigging gear.
Rigger, June 2017 – July 2017
Nrl recruitment – Falkirk Scotland, UK
Rigger working in the Bi-fab fabrication yard in methil under the instruction of the lifting supervisor slinging and rigging duties, this Was a wind farm jacket project heavy lifting project with Liebher LR 1600/2 cranes from 600 tonne to working inside the fabrication sheds and using gantry cranes to attaching loads and banksman
Use of rigging devices and rigging gear. Understanding lift plans and tool box talks.
Rigger, 07/2013 - 11/2016
amec foster wheeler – Aberdeen, Scotland, UK
Rigger working offshore in the oil and gas industry. I was an onsite visiting lift planner under Loler and puwer regulations act 1998, Generating lift plans using powerpoint and excel formats. Also I would perform rigging duties on platform projects, Selecting the correct rigging equipment for the job and on yearly shutdowns I would foreman new personnel to the platform involved in removal of equipment. Using rigging devices and rigging gear. Understanding lift plans and tool box talks.
Rigger, 04/2011 - 05/2013
Bis salamis – Aberdeen, Scotland UK
Rigger working offshore in the oil and gas industry. Working on construction projects reading and understanding loler lift plans, Selecting the correct rigging equipment prior to job task. Working as a team leader on yearly platform shutdowns with in the brae field and also on fabric maintenance, All my jobs I performed were completed safely. Using rigging devices and rigging gear. Understanding lift plans and tool box talks.
Rigger foreman, 10/2010 - 12/2010
D&G projects – Stalendam, Holland
Rigging foreman in the keppel verollme ship yard rotterdam. Working as a team leader and giving instruction to work party. Removal and installation of semi submersible thrusters and also banksman and slinger working with the quay side crane. Using rigging devices and rigging gear. Understanding lift plans and tool box talks.
Rigger, 08/2010 - 09/2010
Atlantic resourcing – Aberdeen, Scotland UK
Rigger working offshore in the oil and gas industry. Reading and understanding loler lift plans and selecting the correct rigging equipment for the pre-platform shutdown. Installation of the new pig launcher, Removal and installation of valves spools and steel work for this project. Using rigging devices and rigging gear understanding lift plans and tool box talks.
Rigger, 09/2009 - 11/2009
Natural resources – Newcastle, Uk
Rigger working in Norway on the stat-oil refinery mongstag, Installation of steel beams and valves spools
Using rigging devices and rigging gear. Understanding lift plans and tool box talks.
Rigger, 08/2008 – 07/2009
Psn services – Aberdeen Scotland, UK
Rigger working on various projects and shutdowns from the southern sector to the north sector north sea.
Removal of spools and valves using rigging devices and rigging gear. Understanding lift plans and tool box talks.
Rigger, 2005 – 2008
I also worked with petrofac on the thistle platform on shutdowns and other projects in the north sea, Woodgroup on other projects across the north sea as a rigger also
Education
GCSE: 1984
Rockwell high school - Dundee, Scotland
Certifications
Ecitb nvq level 3 diploma in moving loads – Opito stage 4 Rigger
Loler supervisor – Rig loft management and controller
Equipment inspection – working at height 2
Ccnsg safety passport – Bosiet
Mist – full ukoa medical