FARAMARZ POURSAEED
(FREDDIE)
RESUME
FARAMARZ POURSAEED
(FREDDIE)
BEVERLY HILLS, CALIFORNIA 90212
PH: 310-***-****
******************@*****.***
PROFESSIONAL SUMMARY
[CONTRACTOR & SUPERINTENDENT] offering a comprehensive knowledge of the principles, techniques and instruments used in:
Leadership / vision / strategic thinker / problem solver Communication / community relations
Budget / finance
Organizational abilities
Flexibility / sense of humor
Excellent customer relations
Reading complete blueprint
General contracting professional / Subcontractor management Knowledgeable in construction safety
Best building practices and OSHA standards
Interior and exterior renovation
Commercial & residential construction expert
Strong interpersonal skills
Design experience
Project scheduling
Building systems and services
Goal accomplishment
Fluent in [FARSI] [ENGLISH]
2
PROFESSIONAL SUMMARY
• Reviewed plans and specs during the schematic design of pre-construction. Coordinated utility service providers according to project schedules.
• Arranged and scheduled multiple subcontractors to meet hard deadlines and tight schedules
• Obtained building and specialty permits from local jurisdictional agencies.
• Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues.
• Performed regular job site observations to provide direction for all general contractor or home owners personnel.
• Coordinated employees and subcontractors, tracking homes, keeping them on schedule and on budget.
• Prepared daily and weekly project status reports, travelled in-state as projects required, and participated in construction educational training.
• Performed and monitored basic carpentry duties: framing, layout, concrete framing and finishing.
• Responsible for Quality Control, development of Safety training, job site conformation, first incidence reports, site and building security, produced daily, weekly, and monthly reports, manpower reports, generated, directed and tracked RFIs.
• Responsibilities include management, organization, running job office, reading blue prints, scheduling contractors, and filing computer progress reports while also working within the limits and guidelines established by the mail.
• Controlled production coast though review and approval of time sheets, production and service invoices, delivery, and inspection sheets. Monitored and tracked coast to avoid overruns.
• Conducted all critical pre-installation conferences with home owners, general contractors, subcontractors, consultants and manufacturer's representatives. 3
• Resolved customer service issues and production problem during construction phase to maintain customer satisfactions.
• Inspected homes daily to ensure quality control and to monitor progress to keep each job on schedule. Acted as liaison between operations, subcontractors and vendors.
• Digitally archived weekly progress and technical “Knowledge Base” photographs of all assigned projects.
• Prepared and followed through on all required punch lists.
• Oversaw the entire building turnover process, while enhancing communication between all construction management.
• Assisted the operations group with warranty service repairs.
• Assisted the vice president of production in the review, approval and archiving of all closeout documents.
• Provided safety kits to all construction personnel, which complied with safety protocols for the job site.
• Prepared regular interval progress reports.
• Reported the quality of performance on site to all site construction managers.
• Conducted routine quality audits to ensure that work was progressing per the specifications and initiated corrective actions.
• Guided and directed third-party inspectors through project construction, commissioning and closeout.
• Avoided construction delays by efficiently following through with all site inspections in a timely manner.
• Supported construction management in emergency repair.
• Implemented systems to improve process efficiency and reduce the project duration.
• Scheduled all contractors and materials deliveries.
• Trained and promoted continued education for all onsite crew members. 4
ACCOMPLISHMENTS
Led over [50] costume homes over 4000 SQ feet projects that were all completed within budget and on schedule. And gas stations & shopping center / TI projects also more than 20 multi units’ condominiums (apartment buildings) Built construction of a [18000]-square feet costume house in Beverly hills area. Gas station plus 10 retail stores in down town los Angeles. 4 shopping centers in down town los Angeles area.
Tenant improvement for Keller Williams real state and many projects at art district area los Angeles.
26 units and 15 units condominium and apartment building at Hollywood and west Hollywood area, Managed construction of [7000] square feet costume house in pacific palisades, Ca
Directed the installation of twin [40000]-gallon gas station tank system. Promoted to [GENERAL MANAGER] after [2] years of employment. Managed a construction budget of more than $[8,000,000], and managed multi project at the same time.
WORK HISTORY
SUPERINTENDENT AT: GOAL CONSTRUCTION INC
Encino CA 1999 to 2005
PARTNERSHIP: PACIFIC / ROBOTS CONSTRUCTION
Northridge, CA 2005 to 2018
SUPERINTENDENT AT: DAWALLING CONSTRUCTION INC:
Porter ranch, CA 2018-2019
OWNER / PARTNERSHIPS:
PARTNERSHIP: MRM PAINT CO
Los Angeles 2018 to present